Hawthorn @ Akoya Oxygen
Updated 24 Nov 2026 · latest DLD registrations 24 Nov 2026 · DLD project registry and registered sales · trailing 12 months Nov 2025 – Oct 2026
Ask an AI about Hawthorn @ Akoya Oxygen: ChatGPT · Claude · Perplexity
Hawthorn @ Akoya Oxygen is a project by Front Line Investment Management L.L.C, recorded at 2% complete at its last Dubai Land Department inspection. Fewer than 5 sales registered here in the last 12 months, so no median is published. Registry facts come from DLD; prices are registered transactions, not asking prices.
Source: Registered DLD transactions · Data through 24 Nov 2026 · sample 0 records · outlier-trimmed median, complete months only · Methodology v1.0 ↗
What the DLD registry says about this project
| Field | Value |
|---|---|
| Developer | Front Line Investment Management L.L.C |
| Status | Cancelled |
| Construction progress | 2% — at the last DLD inspection |
| Registered with DLD | 1 Jan 2016 |
| Construction started | 1 Jan 2016 |
| Declared completion | 31 Jul 2018 — registry date, not a handover promise |
| Units in the project | 1 |
| Project area | 442 sqm |
| Escrow agent | Abu Dhabi Islamic Bank |
| Project number | 1684 |
Source: DLD project registry (Mashrooi) · Data through 24 Nov 2026 · registry fields as recorded, not developer marketing · Methodology v1.0 ↗
Price per square foot, month by month
No month in this window reached the five registered sales a median needs, so there is nothing to plot.
Source: Registered DLD transactions · Data through 24 Nov 2026 · monthly medians, months with fewer than 5 registered sales are left blank · Methodology v1.0 ↗
Construction, inspection by inspection
The DLD registry holds 2 technical inspections for this project, from 14 Mar 2016 at 2.0% to 21 Aug 2017 at 2.0%. The recorded percentage is the same as at the inspection on 14 Mar 2016: no inspection since then changed it. Inspections are irregular and the percentage is what was recorded at each one, not a live measure of the site.
each dot is one DLD technical inspection; the line between two of them is drawn, not measured; the dashed mark is the completion date declared in the registry
| Inspection | Recorded | Change |
|---|---|---|
| 21 Aug 2017 | 2.0% | +0.0 pp |
| 14 Mar 2016 | 2.0% | — |
Source: DLD project registry (Mashrooi) — technical inspections · Data through 24 Nov 2026 · percentage as recorded at each inspection; inspections are irregular, and an unchanged value means no new inspection, not that work stopped · Methodology v1.0 ↗
What these numbers do not show
- Prices from the developer. Nothing here is a price list, a payment plan or availability — these are transactions already registered with DLD.
- Whether construction is moving. The completion percentage is the figure recorded at the last technical inspection, and inspections are irregular: an unchanged number does not mean work stopped.
- A handover promise. The declared completion date is a registry field, not a commitment.
- A reliable price. Only 0 sales registered in the last 12 months here.
- Asking prices. Everything here is a registered transaction; what a home was listed at is a different number.
- Off-market and cash-equivalent deals that never reach the registry, and the price actually negotiated before registration.
- Service charges, chiller fees, agency commission, DLD transfer fees or mortgage costs — none of them are inside these prices.
Nearby projects
10 projects with a page on this site are registered within 1.2 km of Hawthorn @ Akoya Oxygen. Distance is measured between the coordinates in the DLD project registry.
| Project | Distance | Built |
|---|---|---|
| Damac Hills (2) - Mulberry Finished · Front Line Investment Management L.L.C |
287 m | 100% |
| Damac Hills (2) - Viridis Finished · Front Line Investment Management L.L.C |
345 m | 100% |
| Damac Hills (2) - Coursetia Finished · Front Line Investment Management L.L.C |
356 m | 100% |
| Damac Hills (2) - Navitas Finished · Front Line Investment Management L.L.C |
467 m | 100% |
| Damac Hills (2) - Aster Finished · Front Line Investment Management L.L.C |
507 m | 100% |
| Damac Hills (2) - Odora Finished · Front Line Investment Management L.L.C |
720 m | 100% |
| Damac Hills (2) - Zinnia Finished · Front Line Investment Management L.L.C |
796 m | 100% |
| Damac Hills (2) - Aquilegia Finished · Front Line Investment Management L.L.C |
808 m | 100% |
| Damac Hills (2) - Primrose Finished · Front Line Investment Management L.L.C |
884 m | 100% |
| Damac Hills (2) - Claret Finished · Front Line Investment Management L.L.C |
1,073 m | 100% |
The map loads only when you ask for it (OpenStreetMap, no tracking).
Source: DLD project registry coordinates · Data through 24 Nov 2026 · map © OpenStreetMap contributors · Methodology v1.0 ↗
Where this project sits
More projects by Front Line Investment Management L.L.C
Questions about Hawthorn @ Akoya Oxygen
Who is the developer of Hawthorn @ Akoya Oxygen?
The Dubai Land Department project registry lists Front Line Investment Management L.L.C as the developer of Hawthorn @ Akoya Oxygen.
Is Hawthorn @ Akoya Oxygen completed?
The DLD registry status of Hawthorn @ Akoya Oxygen is Cancelled, 2% complete at the last DLD inspection. The declared completion date in the registry is 31 Jul 2018 — a registry date, not a handover promise.
How many homes are in Hawthorn @ Akoya Oxygen?
The DLD registry records 1 units in Hawthorn @ Akoya Oxygen.
Who holds the escrow account for Hawthorn @ Akoya Oxygen?
The escrow agent recorded by DLD for Hawthorn @ Akoya Oxygen is Abu Dhabi Islamic Bank.
Where is Hawthorn @ Akoya Oxygen?
Hawthorn @ Akoya Oxygen is in Dubai. 10 other projects with a page on this site are registered within 1.2 km; the closest is Damac Hills (2) - Mulberry, about 287 m away.
Where does this data come from?
From Dubai Land Department open data — the project registry, unit register and registered sales — rebuilt every night. Data through 24 Nov 2026.
Source: DLD project registry, unit register and registered sales · Data through 24 Nov 2026 · answers built from registry fields · Methodology v1.0 ↗