Data Dubai

La Rive

La RiveFinished100% built284 homesDLD data through 24 Nov 2026

Updated 24 Nov 2026 · latest DLD registrations 24 Nov 2026 · DLD project registry and registered sales · trailing 12 months Nov 2025 – Oct 2026

Ask an AI about La Rive: ChatGPT · Claude · Perplexity

La Rive is a project by Pdlm Residential L.L.C, recorded at 100% complete at its last Dubai Land Department inspection. 25 sales registered in the trailing 12 months at a median AED 2.73M (2 641 AED per square foot). Registry facts come from DLD; prices are registered transactions, not asking prices.

Median sale price
AED 2.73M -9.2% y/y
≈ US$ 742k · typical range AED 2.24M – AED 3.31M
DLD verified
Median price per sqft
AED 2 641/sqft -5.8% y/y
typical range 2 401 – 2 827 AED/sqft
DLD verified
Registered sales
25 -16.7% y/y
all property types · trailing 12 complete months
DLD verified
Off-plan share
0.0%
of registered sales in the window
DLD verified

Source: Registered DLD transactions · Data through 24 Nov 2026 · sample 25 records · outlier-trimmed median, complete months only · Methodology v1.0 ↗

What the DLD registry says about this project

FieldValue
DeveloperPdlm Residential L.L.C
StatusFinished
Construction progress100% — at the last DLD inspection
Registered with DLD25 Feb 2019
Construction started15 Jun 2019
Declared completion19 Oct 2022 — registry date, not a handover promise
Units in the project284
Project area32 683 sqm
Escrow agentDubai Islamic Bank (Public Joint Stock Company)
Project number2131

Source: DLD project registry (Mashrooi) · Data through 24 Nov 2026 · registry fields as recorded, not developer marketing · Methodology v1.0 ↗

Price per square foot, month by month

2 0003 000Jan 2022Aug 2022Mar 2023Oct 2023May 2024Dec 2024Jul 2025Feb 2026Sep 20262 0003 000Jan 2022Aug 2023Mar 2025Oct 2026

median   interquartile range (middle 50% of transactions)

Source: Registered DLD transactions · Data through 24 Nov 2026 · monthly medians, months with fewer than 5 registered sales are left blank; the line stops at Jul 2026: in the 3 months since, no month reached the five registered sales a median needs (4 in total) · Methodology v1.0 ↗

Construction, inspection by inspection

The DLD registry holds 8 technical inspections for this project, from 11 Sep 2019 at 5.9% to 19 Oct 2022 at 100.0%. The last inspection recorded it complete. Inspections are irregular and the percentage is what was recorded at each one, not a live measure of the site.

0%25%50%75%100%declared 2022-10-192019-09-112022-10-19

each dot is one DLD technical inspection; the line between two of them is drawn, not measured; the dashed mark is the completion date declared in the registry

InspectionRecordedChange
19 Oct 2022100.0% +9.5 pp
18 Aug 202290.5% +8.0 pp
18 Apr 202282.5% +9.3 pp
13 Jul 202173.2% +21.2 pp
18 Jan 202152.0% +26.9 pp
18 Jun 202025.1% +11.6 pp
4 Mar 202013.6% +7.7 pp
11 Sep 20195.9% —

Source: DLD project registry (Mashrooi) — technical inspections · Data through 24 Nov 2026 · percentage as recorded at each inspection; inspections are irregular, and an unchanged value means no new inspection, not that work stopped · Methodology v1.0 ↗

By number of bedrooms

HomesSalesMedian priceMedian AED/sqftMedian sizeMedian rentGross yield
1-bedroom apartments low sample (12) 12AED 2.24M 2 606 810 sqft — —
2-bedroom apartments low sample (11) 11AED 3.30M 2 612 1 212 sqft — —
3-bedroom apartments insufficient data 1— — — — —
4-bedroom apartments insufficient data 1— — — — —

Source: Registered DLD sales and Ejari rental contracts · Data through 24 Nov 2026 · yield shown only where at least 15 rents and 15 ready-home sales support it · Methodology v1.0 ↗

Latest registered sales

DatePropertyRegistrationSizePriceAED/sqft
19 Nov 20262 B/R Flat — Building 1Ready 1 200 sqftAED 3 111 250 2 593
17 Sep 20262 B/R Flat — Building 3Ready 1 303 sqftAED 4 000 000 3 071
10 Sep 20262 B/R Flat — Building 3Ready 1 200 sqftAED 3 450 000 2 876
1 Sep 20261 B/R Flat — Building 3Ready 810 sqftAED 2 380 000 2 940
6 Aug 20262 B/R Flat — Building 4Ready 1 201 sqftAED 3 100 000 2 582
31 Jul 20262 B/R Flat — Building 4Ready 1 319 sqftAED 3 000 000 2 274
24 Jul 20262 B/R Flat — Building 2Ready 1 200 sqftAED 3 250 000 2 709
15 Jul 20262 B/R Flat — Building 2Ready 1 284 sqftAED 3 000 000 2 336
14 Jul 20261 B/R Flat — Building 1Ready 901 sqftAED 2 100 000 2 332
9 Jul 20261 B/R Flat — Building 4Ready 810 sqftAED 2 250 000 2 779
1 May 20261 B/R Flat — Building 4Ready 815 sqftAED 2 250 000 2 761
23 Apr 20262 B/R Flat — Building 1Ready 1 212 sqftAED 3 350 000 2 764
22 Apr 20261 B/R Flat — Building 3Ready 788 sqftAED 1 880 000 2 384
15 Apr 20262 B/R Flat — Building 1Ready 1 200 sqftAED 3 100 000 2 583
5 Mar 20261 B/R Flat — Building 2Ready 1 090 sqftAED 2 225 000 2 041
27 Feb 20261 B/R Flat — Building 4Ready 930 sqftAED 2 250 000 2 419
17 Feb 20261 B/R Flat — Building 3Ready 810 sqftAED 2 050 000 2 532
9 Feb 20262 B/R Flat — Building 1Ready 1 206 sqftAED 5 233 340 4 340
5 Jan 20262 B/R Flat — Building 4Ready 1 420 sqftAED 3 750 000 2 641
25 Dec 20251 B/R Flat — Building 3Ready 807 sqftAED 1 900 000 2 354
18 Dec 20251 B/R Flat — Building 4Ready 809 sqftAED 2 450 000 3 028
8 Dec 20254 B/R Flat — Building 2Ready 2 770 sqftAED 12 500 000 4 513
25 Nov 20253 B/R Flat — Building 3Ready 2 589 sqftAED 8 000 000 3 090
17 Nov 20252 B/R Flat — Building 2Ready 1 308 sqftAED 3 300 000 2 522

Source: Registered DLD transactions · Data through 24 Nov 2026 · individual registrations, shown exactly as recorded, without trimming · Methodology v1.0 ↗

Every registration, on request

The full DLD record for La Rive: every registered sale, mortgage and gift, and every Ejari rent contract. It loads only when you ask; filter, sort and download it as CSV.

Registered sales by year

01002002019202020212022202320242025202601002002020202220242026

registered sales per calendar year; the current year is incomplete

By month

024NovDecJanFebMarAprMayJunJulAugSepOct024DecFebAprJunAugOct

registered sales per month, Nov 2025 – Oct 2026

YearSalesMedian priceMedian AED/sqftTotal registered value
202618AED 3.00M 2 583AED 52.62M
202531AED 3.00M 2 851AED 92.39M
202427AED 2.98M 2 553AED 78.72M
202353AED 2.85M 2 647AED 153.98M
202250AED 2.60M 2 247AED 131.39M
202169AED 1.98M 1 678AED 144.28M
202023AED 2.08M 1 681AED 53.97M
2019191AED 1.83M 1 825AED 376.22M

Source: Registered DLD transactions · Data through 24 Nov 2026 · calendar years; the current year is partial · Methodology v1.0 ↗

Rent and gross yield by year, 2023–2026

Median annual rent, AED thousand
Year1-bed flat2-bed flatGross yield
2026 YTD 110k193k—
2025 120k200k5.93%
2024 118k190k—
2023 110k180k5.27%

Source: Ejari rental contracts and registered DLD sales · Data through 24 Nov 2026 · median annual rent per year a contract starts, shown from 15 contracts; yield = median rent ÷ median ready-home price of the same year and home type, from 15 of each · Methodology v1.0 ↗

Price and sales, month by month

MonthSalesMedian priceMedian AED/sqftIQR AED/sqft
Jul 20265 AED 3.00M2 336 2 332 – 2 709
Jun 20260 —— —
May 20261 —— —
Apr 20263 —— —
Mar 20261 —— —
Feb 20263 —— —
Jan 20261 —— —
Dec 20252 —— —
Nov 20254 —— —
Oct 20253 —— —
Sep 20251 —— —
Aug 20252 —— —
Jul 20252 —— —

Source: Registered DLD transactions · Data through 24 Nov 2026 · complete months only; the current month is excluded because DLD keeps registering it · Methodology v1.0 ↗

Buildings in this project

Building (DLD name)SalesMedian priceMedian AED/sqftOff-plan
La Rive - Building 3 low sample (9) 9AED 2.30M 2 8760.0%
La Rive - Building 4 low sample (7) 7AED 2.45M 2 6410.0%
La Rive - Building 2 low sample (5) 5— —0.0%
La Rive - Building 1 insufficient data 4— —0.0%

Source: Registered DLD transactions · Data through 24 Nov 2026 · outlier-trimmed median, complete months only · Methodology v1.0 ↗

What these numbers do not show

  • Prices from the developer. Nothing here is a price list, a payment plan or availability — these are transactions already registered with DLD.
  • Whether construction is moving. The completion percentage is the figure recorded at the last technical inspection, and inspections are irregular: an unchanged number does not mean work stopped.
  • A handover promise. The declared completion date is a registry field, not a commitment.
  • Asking prices. Everything here is a registered transaction; what a home was listed at is a different number.
  • Off-market and cash-equivalent deals that never reach the registry, and the price actually negotiated before registration.
  • Service charges, chiller fees, agency commission, DLD transfer fees or mortgage costs — none of them are inside these prices.

Where this project sits

More projects in LA MER

Questions about La Rive

Who is the developer of La Rive?

The Dubai Land Department project registry lists Pdlm Residential L.L.C as the developer of La Rive.

Is La Rive completed?

The DLD registry status of La Rive is Finished, 100% complete at the last DLD inspection. The declared completion date in the registry is 19 Oct 2022 — a registry date, not a handover promise.

How many homes are in La Rive?

The DLD registry records 284 units in La Rive.

What is the price per square foot in La Rive?

Over the last 12 complete months the median registered sale in La Rive was AED 2.73M, or AED 2 641 per sqft, from 25 registered sales. These are DLD registrations, not asking prices.

Who holds the escrow account for La Rive?

The escrow agent recorded by DLD for La Rive is Dubai Islamic Bank (Public Joint Stock Company).

Where is La Rive?

La Rive is in the LA MER community.

Where does this data come from?

From Dubai Land Department open data — the project registry, unit register and registered sales — rebuilt every night. Data through 24 Nov 2026.

Source: DLD project registry, unit register and registered sales · Data through 24 Nov 2026 · answers built from registry fields · Methodology v1.0 ↗

Cite or reuse this data

Machine-readable mirrors of this page: Markdown · JSON · llms.txt. How to cite: “La Rive — Data Dubai, Continental Club Property, data through 24 Nov 2026, https://datadubai.ae/projects/la-rive/”. Reuse is permitted with attribution.