No.23a And 23b Citywalk Residential
Updated 24 Nov 2026 · latest DLD registrations 24 Nov 2026 · DLD project registry and registered sales · trailing 12 months Nov 2025 – Oct 2026
Ask an AI about No.23a And 23b Citywalk Residential: ChatGPT · Claude · Perplexity
No.23a And 23b Citywalk Residential is a project by Citywalk Residential 1 L.L.C, recorded at 100% complete at its last Dubai Land Department inspection. Fewer than 5 sales registered here in the last 12 months, so no median is published. Registry facts come from DLD; prices are registered transactions, not asking prices.
Source: Registered DLD transactions · Data through 24 Nov 2026 · sample 0 records · outlier-trimmed median, complete months only · Methodology v1.0 ↗
What the DLD registry says about this project
| Field | Value |
|---|---|
| Developer | Citywalk Residential 1 L.L.C |
| Status | Finished |
| Construction progress | 100% — at the last DLD inspection |
| Registered with DLD | 28 Dec 2016 |
| Construction started | 1 May 2014 |
| Declared completion | 17 Jul 2017 — registry date, not a handover promise |
| Units in the project | 68 |
| Project area | 11 982 sqm |
| Escrow agent | Noor Bank P.J.S.C |
| Project number | 1780 |
Source: DLD project registry (Mashrooi) · Data through 24 Nov 2026 · registry fields as recorded, not developer marketing · Methodology v1.0 ↗
Price per square foot, month by month
No month in this window reached the five registered sales a median needs, so there is nothing to plot.
Source: Registered DLD transactions · Data through 24 Nov 2026 · monthly medians, months with fewer than 5 registered sales are left blank · Methodology v1.0 ↗
Construction, inspection by inspection
The DLD registry holds 2 technical inspections for this project, from 29 Jan 2017 at 97.6% to 3 Oct 2017 at 100.0%. The last inspection recorded it complete. Inspections are irregular and the percentage is what was recorded at each one, not a live measure of the site.
each dot is one DLD technical inspection; the line between two of them is drawn, not measured; the dashed mark is the completion date declared in the registry
| Inspection | Recorded | Change |
|---|---|---|
| 3 Oct 2017 | 100.0% | +2.4 pp |
| 29 Jan 2017 | 97.6% | — |
Source: DLD project registry (Mashrooi) — technical inspections · Data through 24 Nov 2026 · percentage as recorded at each inspection; inspections are irregular, and an unchanged value means no new inspection, not that work stopped · Methodology v1.0 ↗
Every registration, on request
The full DLD record for No.23a And 23b Citywalk Residential: every registered sale, mortgage and gift, and every Ejari rent contract. It loads only when you ask; filter, sort and download it as CSV.
Rent by year, 2018–2026
3-bed flat: median annual rent, AED, of new and renewed Ejari contracts by start year; band = middle half of contracts
| Year | 2-bed flat | 3-bed flat |
|---|---|---|
| 2026 YTD | 208k | 284k |
| 2024 | — | 258k |
| 2023 | 160k | 195k |
| 2022 | 155k | 190k |
| 2021 | 155k | 185k |
| 2019 | 170k | 187k |
| 2018 | 174k | 190k |
Source: Ejari rental contracts and registered DLD sales · Data through 24 Nov 2026 · median annual rent per year a contract starts, shown from 15 contracts; yield = median rent ÷ median ready-home price of the same year and home type, from 15 of each · Methodology v1.0 ↗
Buildings in this project
| Building (DLD name) | Sales | Median price | Median AED/sqft | Off-plan |
|---|---|---|---|---|
| Citywalk Residential Building 23a insufficient data | 0 | — | — | — |
| Citywalk Residential Building 23b insufficient data | 0 | — | — | — |
Source: Registered DLD transactions · Data through 24 Nov 2026 · outlier-trimmed median, complete months only · Methodology v1.0 ↗
What these numbers do not show
- Prices from the developer. Nothing here is a price list, a payment plan or availability — these are transactions already registered with DLD.
- Whether construction is moving. The completion percentage is the figure recorded at the last technical inspection, and inspections are irregular: an unchanged number does not mean work stopped.
- A handover promise. The declared completion date is a registry field, not a commitment.
- A reliable price. Only 0 sales registered in the last 12 months here.
- Asking prices. Everything here is a registered transaction; what a home was listed at is a different number.
- Off-market and cash-equivalent deals that never reach the registry, and the price actually negotiated before registration.
- Service charges, chiller fees, agency commission, DLD transfer fees or mortgage costs — none of them are inside these prices.
Nearby projects
10 projects with a page on this site are registered within 1.2 km of No.23a And 23b Citywalk Residential. Distance is measured between the coordinates in the DLD project registry.
| Project | Distance | Built |
|---|---|---|
| No.20, No.21a, No.21b And No.22 Citywalk Residential Finished · Citywalk Residential 1 L.L.C |
107 m | 100% |
| No.17, No.18a,No.18b And No.19 Citywalk Residential Finished · Citywalk Residential 1 L.L.C |
123 m | 100% |
| No.15 & No.16 Citywalk Residential Finished · Citywalk Residential 1 L.L.C |
215 m | 100% |
| No. 6a And No.6b Citywalk Residential Finished · Citywalk Residential 1 L.L.C |
303 m | 100% |
| No. 4a, No.4b, No.5 Citywalk Residential Finished · Citywalk Residential 1 L.L.C |
395 m | 100% |
| No.9 & No.10 Citywalk Residential Finished · Citywalk Residential 1 L.L.C |
483 m | 100% |
| No.1, No.2a, No.2b, No.3a And 3b Citywalk Residential Finished · Citywalk Residential 1 L.L.C |
615 m | 100% |
| The Address Residence - Sky View Finished · Emaar Development P.J.S.C. |
671 m | 100% |
| Burj Vista Finished · Emaar Development P.J.S.C. |
750 m | 100% |
| Forte Finished · Emaar Development P.J.S.C. |
760 m | 100% |
The map loads only when you ask for it (OpenStreetMap, no tracking).
Source: DLD project registry coordinates · Data through 24 Nov 2026 · map © OpenStreetMap contributors · Methodology v1.0 ↗
Where this project sits
More projects by Citywalk Residential 1 L.L.C
Questions about No.23a And 23b Citywalk Residential
Who is the developer of No.23a And 23b Citywalk Residential?
The Dubai Land Department project registry lists Citywalk Residential 1 L.L.C as the developer of No.23a And 23b Citywalk Residential.
Is No.23a And 23b Citywalk Residential completed?
The DLD registry status of No.23a And 23b Citywalk Residential is Finished, 100% complete at the last DLD inspection. The declared completion date in the registry is 17 Jul 2017 — a registry date, not a handover promise.
How many homes are in No.23a And 23b Citywalk Residential?
The DLD registry records 68 units in No.23a And 23b Citywalk Residential.
Who holds the escrow account for No.23a And 23b Citywalk Residential?
The escrow agent recorded by DLD for No.23a And 23b Citywalk Residential is Noor Bank P.J.S.C.
Where is No.23a And 23b Citywalk Residential?
No.23a And 23b Citywalk Residential is in Dubai. 10 other projects with a page on this site are registered within 1.2 km; the closest is No.20, No.21a, No.21b And No.22 Citywalk Residential, about 107 m away.
Where does this data come from?
From Dubai Land Department open data — the project registry, unit register and registered sales — rebuilt every night. Data through 24 Nov 2026.
Source: DLD project registry, unit register and registered sales · Data through 24 Nov 2026 · answers built from registry fields · Methodology v1.0 ↗
Cite or reuse this data
Machine-readable mirrors of this page: Markdown · JSON · llms.txt. How to cite: “No.23a And 23b Citywalk Residential — Data Dubai, Continental Club Property, data through 24 Nov 2026, https://datadubai.ae/projects/no-23a-and-23b-citywalk-residential/”. Reuse is permitted with attribution.