Data Dubai

No. 4a, No.4b, No.5 Citywalk Residential

No. 4a, No.4b, No.5 Citywalk ResidentialFinished100% built148 homesDLD data through 24 Nov 2026

Updated 24 Nov 2026 · latest DLD registrations 24 Nov 2026 · DLD project registry and registered sales · trailing 12 months Nov 2025 – Oct 2026

Ask an AI about No. 4a, No.4b, No.5 Citywalk Residential: ChatGPT · Claude · Perplexity

No. 4a, No.4b, No.5 Citywalk Residential is a project by Citywalk Residential 1 L.L.C, recorded at 100% complete at its last Dubai Land Department inspection. 12 sales registered in the trailing 12 months at a median AED 4.58M (2 727 AED per square foot). Registry facts come from DLD; prices are registered transactions, not asking prices.

Median sale price
AED 4.58M +1.1% y/y
≈ US$ 1.25M · typical range AED 3.16M – AED 6.95M
DLD verified
Median price per sqft
AED 2 727/sqft +9.7% y/y
typical range 2 430 – 3 048 AED/sqft
DLD verified
Registered sales
12 -29.4% y/y
all property types · trailing 12 complete months
DLD verified
Off-plan share
0.0%
of registered sales in the window
DLD verified

Source: Registered DLD transactions · Data through 24 Nov 2026 · sample 12 records · outlier-trimmed median, complete months only · Methodology v1.0 ↗

What the DLD registry says about this project

FieldValue
DeveloperCitywalk Residential 1 L.L.C
StatusFinished
Construction progress100% — at the last DLD inspection
Registered with DLD28 Jan 2016
Construction started18 May 2013
Declared completion7 Dec 2016 — registry date, not a handover promise
Units in the project148
Project area25 463 sqm
Escrow agentNoor Bank P.J.S.C
Project number1718

Source: DLD project registry (Mashrooi) · Data through 24 Nov 2026 · registry fields as recorded, not developer marketing · Methodology v1.0 ↗

Price per square foot, month by month

No month in this window reached the five registered sales a median needs, so there is nothing to plot.

Source: Registered DLD transactions · Data through 24 Nov 2026 · monthly medians, months with fewer than 5 registered sales are left blank · Methodology v1.0 ↗

Construction, inspection by inspection

The DLD registry holds 2 technical inspections for this project, from 15 Aug 2016 at 97.0% to 19 Dec 2016 at 100.0%. The last inspection recorded it complete. Inspections are irregular and the percentage is what was recorded at each one, not a live measure of the site.

0%25%50%75%100%declared 2016-12-072016-08-152016-12-19

each dot is one DLD technical inspection; the line between two of them is drawn, not measured; the dashed mark is the completion date declared in the registry

InspectionRecordedChange
19 Dec 2016100.0% +3.0 pp
15 Aug 201697.0% —

Source: DLD project registry (Mashrooi) — technical inspections · Data through 24 Nov 2026 · percentage as recorded at each inspection; inspections are irregular, and an unchanged value means no new inspection, not that work stopped · Methodology v1.0 ↗

By number of bedrooms

HomesSalesMedian priceMedian AED/sqftMedian sizeMedian rentGross yield
1-bedroom apartments insufficient data 4— — — — —
2-bedroom apartments insufficient data 3— — — — —
3-bedroom apartments low sample (5) 5— 3 153 2 323 sqft — —

Source: Registered DLD sales and Ejari rental contracts · Data through 24 Nov 2026 · yield shown only where at least 15 rents and 15 ready-home sales support it · Methodology v1.0 ↗

Latest registered sales

DatePropertyRegistrationSizePriceAED/sqft
2 Oct 20261 B/R Flat — Citywalk Residential Building 5Ready 1 127 sqftAED 2 700 000 2 396
9 Jul 20263 B/R Flat — Citywalk Residential Building 5Ready 2 639 sqftAED 9 050 000 3 429
10 Mar 20263 B/R Flat — Citywalk Residential Building 5Ready 2 286 sqftAED 7 900 000 3 456
2 Mar 20261 B/R Flat — Citywalk Residential Building 4BReady 1 280 sqftAED 3 125 000 2 442
11 Feb 20262 B/R Flat — Citywalk Residential Building 4BReady 1 960 sqftAED 4 575 000 2 334
22 Jan 20262 B/R Flat — Citywalk Residential Building 4BReady 1 924 sqftAED 4 600 000 2 390
19 Jan 20261 B/R Flat — Citywalk Residential Building 5Ready 1 159 sqftAED 3 185 000 2 749
10 Dec 20252 B/R Flat — Citywalk Residential Building 4BReady 1 754 sqftAED 4 500 000 2 566
26 Nov 20251 B/R Flat — Citywalk Residential Building 5Ready 1 159 sqftAED 3 135 000 2 705
17 Nov 20253 B/R Flat — Citywalk Residential Building 4BReady 2 252 sqftAED 7 100 000 3 153
13 Nov 20253 B/R Flat — Citywalk Residential Building 4BReady 2 323 sqftAED 7 000 000 3 013
12 Nov 20253 B/R Flat — Citywalk Residential Building 4BReady 2 323 sqftAED 6 900 000 2 970

Source: Registered DLD transactions · Data through 24 Nov 2026 · individual registrations, shown exactly as recorded, without trimming · Methodology v1.0 ↗

Every registration, on request

The full DLD record for No. 4a, No.4b, No.5 Citywalk Residential: every registered sale, mortgage and gift, and every Ejari rent contract. It loads only when you ask; filter, sort and download it as CSV.

Registered sales by year

0255075201620172018201920202021202220232024202520260255075201620182020202220242026

registered sales per calendar year; the current year is incomplete

By month

024NovDecJanFebMarAprMayJunJulAugSepOct024DecFebAprJunAugOct

registered sales per month, Nov 2025 – Oct 2026

YearSalesMedian priceMedian AED/sqftTotal registered value
20267AED 3.88M 2 442AED 26.09M
202521AED 4.55M 2 705AED 102.33M
202411AED 4.10M 2 409AED 46.13M
202312AED 3.36M 1 912AED 43.42M
20229AED 4.10M 1 684AED 35.02M
20215AED 1.80M 1 466AED 9.47M
20209AED 2.08M 1 212AED 17.83M
20199AED 3.32M 1 909AED 28.91M
20185AED 3.37M 1 919AED 19.54M
201730AED 3.39M 1 917AED 107.62M
201688AED 2.64M 1 434AED 236.54M

Source: Registered DLD transactions · Data through 24 Nov 2026 · calendar years; the current year is partial · Methodology v1.0 ↗

Rent by year, 2017–2026

100k150k200k250k2017201820192020202120222023202420252026100k150k200k250k2017202020232026

2-bed flat: median annual rent, AED, of new and renewed Ejari contracts by start year; band = middle half of contracts

Median annual rent, AED thousand
Year1-bed flat2-bed flat3-bed flat
2026 YTD 155k240k—
2025 166k192k—
2024 158k196k243k
2023 126k175k225k
2022 110k148k192k
2021 100k125k160k
2020 105k120k170k
2019 125k155k190k
2018 134k165k200k
2017 —183k242k

Source: Ejari rental contracts and registered DLD sales · Data through 24 Nov 2026 · median annual rent per year a contract starts, shown from 15 contracts; yield = median rent ÷ median ready-home price of the same year and home type, from 15 of each · Methodology v1.0 ↗

Buildings in this project

Building (DLD name)SalesMedian priceMedian AED/sqftOff-plan
Citywalk Residential Building 4b low sample (7) 7AED 4.60M 2 5660.0%
Citywalk Residential Building 5 low sample (5) 5— 2 7490.0%
Citywalk Residential Building 4a insufficient data 0— ——

Source: Registered DLD transactions · Data through 24 Nov 2026 · outlier-trimmed median, complete months only · Methodology v1.0 ↗

What these numbers do not show

  • Prices from the developer. Nothing here is a price list, a payment plan or availability — these are transactions already registered with DLD.
  • Whether construction is moving. The completion percentage is the figure recorded at the last technical inspection, and inspections are irregular: an unchanged number does not mean work stopped.
  • A handover promise. The declared completion date is a registry field, not a commitment.
  • A reliable price. Only 12 sales registered in the last 12 months here.
  • Asking prices. Everything here is a registered transaction; what a home was listed at is a different number.
  • Off-market and cash-equivalent deals that never reach the registry, and the price actually negotiated before registration.
  • Service charges, chiller fees, agency commission, DLD transfer fees or mortgage costs — none of them are inside these prices.

Nearby projects

10 projects with a page on this site are registered within 1.2 km of No. 4a, No.4b, No.5 Citywalk Residential. Distance is measured between the coordinates in the DLD project registry.

ProjectDistanceBuiltUnits
No. 6a And No.6b Citywalk Residential
Finished · Citywalk Residential 1 L.L.C
118 m100%68
No.9 & No.10 Citywalk Residential
Finished · Citywalk Residential 1 L.L.C
131 m100%166
No.1, No.2a, No.2b, No.3a And 3b Citywalk Residential
Finished · Citywalk Residential 1 L.L.C
244 m100%286
No.17, No.18a,No.18b And No.19 Citywalk Residential
Finished · Citywalk Residential 1 L.L.C
272 m100%196
No.15 & No.16 Citywalk Residential
Finished · Citywalk Residential 1 L.L.C
310 m100%113
No.23a And 23b Citywalk Residential
Finished · Citywalk Residential 1 L.L.C
395 m100%68
No.20, No.21a, No.21b And No.22 Citywalk Residential
Finished · Citywalk Residential 1 L.L.C
416 m100%187
The Address Residence - Sky View
Finished · Emaar Development P.J.S.C.
768 m100%712
Burj Vista
Finished · Emaar Development P.J.S.C.
964 m100%790
Forte
Finished · Emaar Development P.J.S.C.
1,081 m100%927

The map loads only when you ask for it (OpenStreetMap, no tracking).

Source: DLD project registry coordinates · Data through 24 Nov 2026 · map © OpenStreetMap contributors · Methodology v1.0 ↗

Where this project sits

More projects in City Walk

Questions about No. 4a, No.4b, No.5 Citywalk Residential

Who is the developer of No. 4a, No.4b, No.5 Citywalk Residential?

The Dubai Land Department project registry lists Citywalk Residential 1 L.L.C as the developer of No. 4a, No.4b, No.5 Citywalk Residential.

Is No. 4a, No.4b, No.5 Citywalk Residential completed?

The DLD registry status of No. 4a, No.4b, No.5 Citywalk Residential is Finished, 100% complete at the last DLD inspection. The declared completion date in the registry is 7 Dec 2016 — a registry date, not a handover promise.

How many homes are in No. 4a, No.4b, No.5 Citywalk Residential?

The DLD registry records 148 units in No. 4a, No.4b, No.5 Citywalk Residential.

What is the price per square foot in No. 4a, No.4b, No.5 Citywalk Residential?

Over the last 12 complete months the median registered sale in No. 4a, No.4b, No.5 Citywalk Residential was AED 4.58M, or AED 2 727 per sqft, from 12 registered sales. These are DLD registrations, not asking prices.

Who holds the escrow account for No. 4a, No.4b, No.5 Citywalk Residential?

The escrow agent recorded by DLD for No. 4a, No.4b, No.5 Citywalk Residential is Noor Bank P.J.S.C.

Where is No. 4a, No.4b, No.5 Citywalk Residential?

No. 4a, No.4b, No.5 Citywalk Residential is in the City Walk community. 10 other projects with a page on this site are registered within 1.2 km; the closest is No. 6a And No.6b Citywalk Residential, about 118 m away.

Where does this data come from?

From Dubai Land Department open data — the project registry, unit register and registered sales — rebuilt every night. Data through 24 Nov 2026.

Source: DLD project registry, unit register and registered sales · Data through 24 Nov 2026 · answers built from registry fields · Methodology v1.0 ↗

Cite or reuse this data

Machine-readable mirrors of this page: Markdown · JSON · llms.txt. How to cite: “No. 4a, No.4b, No.5 Citywalk Residential — Data Dubai, Continental Club Property, data through 24 Nov 2026, https://datadubai.ae/projects/no-4a-no-4b-no-5-citywalk-residential/”. Reuse is permitted with attribution.