Data Dubai

Palm Jebel Ali - The Beach And Coral Collection - Frond D

Palm Jebel Ali - The Beach And Coral Collection - Frond DActive2% built44 homesDLD data through 24 Nov 2026

Updated 24 Nov 2026 · latest DLD registrations 24 Nov 2026 · DLD project registry and registered sales · trailing 12 months Nov 2025 – Oct 2026

Ask an AI about Palm Jebel Ali - The Beach And Coral Collection - Frond D: ChatGPT · Claude · Perplexity

Palm Jebel Ali - The Beach And Coral Collection - Frond D is a project by The Palm - Jebel Ali Co. (L.L.C), recorded at 2% complete at its last Dubai Land Department inspection. 41 sales registered in the trailing 12 months at a median AED 30.89M. Registry facts come from DLD; prices are registered transactions, not asking prices.

Median sale price
AED 30.89M
≈ US$ 8.41M · typical range AED 30.42M – AED 47.68M
DLD verified
Median price per sqft
—
built residential only
DLD verified
Registered sales
41
all property types · trailing 12 complete months
DLD verified
Off-plan share
0.0%
of registered sales in the window
DLD verified

Source: Registered DLD transactions · Data through 24 Nov 2026 · sample 41 records · outlier-trimmed median, complete months only · Methodology v1.0 ↗

What the DLD registry says about this project

FieldValue
DeveloperThe Palm - Jebel Ali Co. (L.L.C)
StatusActive
Construction progress2% — at the last DLD inspection
Registered with DLD3 Oct 2025
Construction started5 Dec 2025
Declared completion4 Dec 2028 — registry date, not a handover promise
Units in the project44
Project area44 328 sqm
Escrow agentAbu Dhabi Islamic Bank
Project number4107

Source: DLD project registry (Mashrooi) · Data through 24 Nov 2026 · registry fields as recorded, not developer marketing · Methodology v1.0 ↗

Price per square foot, month by month

No month in this window reached the five registered sales a median needs, so there is nothing to plot.

Source: Registered DLD transactions · Data through 24 Nov 2026 · monthly medians, months with fewer than 5 registered sales are left blank · Methodology v1.0 ↗

Construction, inspection by inspection

The DLD registry holds 4 technical inspections for this project, from 23 Sep 2025 at 0.0% to 13 Oct 2026 at 2.2%. Since 23 Sep 2025 the recorded percentage has moved 0.17 percentage points a month. Inspections are irregular and the percentage is what was recorded at each one, not a live measure of the site.

0%25%50%75%100%declared 2028-12-042025-09-232026-10-13

each dot is one DLD technical inspection; the line between two of them is drawn, not measured; the dashed mark is the completion date declared in the registry

InspectionRecordedChange
13 Oct 20262.2% +0.6 pp
13 Jul 20261.6% +0.5 pp
28 Apr 20261.1% +1.1 pp
23 Sep 20250.0% —

Source: DLD project registry (Mashrooi) — technical inspections · Data through 24 Nov 2026 · percentage as recorded at each inspection; inspections are irregular, and an unchanged value means no new inspection, not that work stopped · Methodology v1.0 ↗

Latest registered sales

DatePropertyRegistrationSizePriceAED/sqft
5 Jun 2026LandReady 7 578 sqftAED 29 185 000 —
25 May 2026LandReady 7 578 sqftAED 31 092 000 —
14 May 2026LandReady 7 379 sqftAED 30 420 000 —
13 May 2026LandReady 20 933 sqftAED 51 476 000 —
13 May 2026LandReady 8 147 sqftAED 32 534 000 —
12 May 2026LandReady 7 379 sqftAED 30 514 000 —
12 May 2026LandReady 20 495 sqftAED 50 501 000 —
12 May 2026LandReady 7 578 sqftAED 30 987 000 —
12 May 2026LandReady 7 578 sqftAED 31 232 000 —
12 May 2026LandReady 7 577 sqftAED 30 403 000 —
12 May 2026LandReady 7 577 sqftAED 30 742 000 —
4 May 2026LandReady 7 577 sqftAED 28 723 000 —
16 Apr 2026LandReady 7 379 sqftAED 30 179 000 —
13 Apr 2026LandReady 7 379 sqftAED 30 620 000 —
8 Apr 2026LandReady 7 379 sqftAED 29 195 000 —
8 Apr 2026LandReady 7 379 sqftAED 30 759 000 —
7 Apr 2026LandReady 7 577 sqftAED 28 954 000 —
7 Apr 2026LandReady 18 628 sqftAED 48 827 000 —
7 Apr 2026LandReady 7 379 sqftAED 29 195 000 —
6 Apr 2026LandReady 7 398 sqftAED 31 260 000 —
6 Apr 2026LandReady 7 578 sqftAED 30 889 000 —
6 Apr 2026LandReady 7 577 sqftAED 30 848 000 —
6 Apr 2026LandReady 19 108 sqftAED 50 305 000 —
6 Apr 2026LandReady 7 379 sqftAED 30 865 000 —

Source: Registered DLD transactions · Data through 24 Nov 2026 · individual registrations, shown exactly as recorded, without trimming · Methodology v1.0 ↗

Every registration, on request

The full DLD record for Palm Jebel Ali - The Beach And Coral Collection - Frond D: every registered sale, mortgage and gift. It loads only when you ask; filter, sort and download it as CSV.

Registered sales by year

020402026020402026

registered sales per calendar year; the current year is incomplete

By month

051015NovDecJanFebMarAprMayJunJulAugSepOct051015DecFebAprJunAugOct

registered sales per month, Nov 2025 – Oct 2026

YearSalesMedian priceMedian AED/sqftTotal registered value
202641AED 30.89M —AED 1.46B

Source: Registered DLD transactions · Data through 24 Nov 2026 · calendar years; the current year is partial · Methodology v1.0 ↗

What these numbers do not show

  • Prices from the developer. Nothing here is a price list, a payment plan or availability — these are transactions already registered with DLD.
  • Whether construction is moving. The completion percentage is the figure recorded at the last technical inspection, and inspections are irregular: an unchanged number does not mean work stopped.
  • A handover promise. The declared completion date is a registry field, not a commitment.
  • Asking prices. Everything here is a registered transaction; what a home was listed at is a different number.
  • Off-market and cash-equivalent deals that never reach the registry, and the price actually negotiated before registration.
  • Service charges, chiller fees, agency commission, DLD transfer fees or mortgage costs — none of them are inside these prices.

Where this project sits

More projects in Palm Jabal Ali

Questions about Palm Jebel Ali - The Beach And Coral Collection - Frond D

Who is the developer of Palm Jebel Ali - The Beach And Coral Collection - Frond D?

The Dubai Land Department project registry lists The Palm - Jebel Ali Co. (L.L.C) as the developer of Palm Jebel Ali - The Beach And Coral Collection - Frond D.

Is Palm Jebel Ali - The Beach And Coral Collection - Frond D completed?

The DLD registry status of Palm Jebel Ali - The Beach And Coral Collection - Frond D is Active, 2% complete at the last DLD inspection. The declared completion date in the registry is 4 Dec 2028 — a registry date, not a handover promise.

How many homes are in Palm Jebel Ali - The Beach And Coral Collection - Frond D?

The DLD registry records 44 units in Palm Jebel Ali - The Beach And Coral Collection - Frond D.

What is the price per square foot in Palm Jebel Ali - The Beach And Coral Collection - Frond D?

Too few sales were registered in Palm Jebel Ali - The Beach And Coral Collection - Frond D in the last 12 months to publish a median; earlier registered sales are shown in the charts on this page.

Who holds the escrow account for Palm Jebel Ali - The Beach And Coral Collection - Frond D?

The escrow agent recorded by DLD for Palm Jebel Ali - The Beach And Coral Collection - Frond D is Abu Dhabi Islamic Bank.

Where is Palm Jebel Ali - The Beach And Coral Collection - Frond D?

Palm Jebel Ali - The Beach And Coral Collection - Frond D is in the Palm Jabal Ali community.

Where does this data come from?

From Dubai Land Department open data — the project registry, unit register and registered sales — rebuilt every night. Data through 24 Nov 2026.

Source: DLD project registry, unit register and registered sales · Data through 24 Nov 2026 · answers built from registry fields · Methodology v1.0 ↗

Cite or reuse this data

Machine-readable mirrors of this page: Markdown · JSON · llms.txt. How to cite: “Palm Jebel Ali - The Beach And Coral Collection - Frond D — Data Dubai, Continental Club Property, data through 24 Nov 2026, https://datadubai.ae/projects/palm-jebel-ali-the-beach-and-coral-collection-frond-d/”. Reuse is permitted with attribution.