Data Dubai

Palm Jebel Ali - The Beach And Coral Collection - Frond E

Palm Jebel Ali - The Beach And Coral Collection - Frond EActive3% built40 homesDLD data through 24 Nov 2026

Updated 24 Nov 2026 · latest DLD registrations 24 Nov 2026 · DLD project registry and registered sales · trailing 12 months Nov 2025 – Oct 2026

Ask an AI about Palm Jebel Ali - The Beach And Coral Collection - Frond E: ChatGPT · Claude · Perplexity

Palm Jebel Ali - The Beach And Coral Collection - Frond E is a project by The Palm - Jebel Ali Co. (L.L.C), recorded at 3% complete at its last Dubai Land Department inspection. 37 sales registered in the trailing 12 months at a median AED 31.37M. Registry facts come from DLD; prices are registered transactions, not asking prices.

Median sale price
AED 31.37M
≈ US$ 8.54M · typical range AED 30.98M – AED 49.10M
DLD verified
Median price per sqft
—
built residential only
DLD verified
Registered sales
37
all property types · trailing 12 complete months
DLD verified
Off-plan share
0.0%
of registered sales in the window
DLD verified

Source: Registered DLD transactions · Data through 24 Nov 2026 · sample 37 records · outlier-trimmed median, complete months only · Methodology v1.0 ↗

What the DLD registry says about this project

FieldValue
DeveloperThe Palm - Jebel Ali Co. (L.L.C)
StatusActive
Construction progress3% — at the last DLD inspection
Registered with DLD3 Oct 2025
Construction started5 Dec 2025
Declared completion4 Dec 2028 — registry date, not a handover promise
Units in the project40
Project area46 141 sqm
Escrow agentMashreq Bank Psc
Project number4113

Source: DLD project registry (Mashrooi) · Data through 24 Nov 2026 · registry fields as recorded, not developer marketing · Methodology v1.0 ↗

Price per square foot, month by month

No month in this window reached the five registered sales a median needs, so there is nothing to plot.

Source: Registered DLD transactions · Data through 24 Nov 2026 · monthly medians, months with fewer than 5 registered sales are left blank · Methodology v1.0 ↗

Construction, inspection by inspection

The DLD registry holds 4 technical inspections for this project, from 22 Sep 2025 at 0.0% to 13 Oct 2026 at 2.6%. Since 22 Sep 2025 the recorded percentage has moved 0.21 percentage points a month. Inspections are irregular and the percentage is what was recorded at each one, not a live measure of the site.

0%25%50%75%100%declared 2028-12-042025-09-222026-10-13

each dot is one DLD technical inspection; the line between two of them is drawn, not measured; the dashed mark is the completion date declared in the registry

InspectionRecordedChange
13 Oct 20262.6% +1.2 pp
13 Jul 20261.4% +0.5 pp
28 Apr 20260.9% +0.9 pp
22 Sep 20250.0% —

Source: DLD project registry (Mashrooi) — technical inspections · Data through 24 Nov 2026 · percentage as recorded at each inspection; inspections are irregular, and an unchanged value means no new inspection, not that work stopped · Methodology v1.0 ↗

Latest registered sales

DatePropertyRegistrationSizePriceAED/sqft
13 Oct 2026LandReady 7 552 sqftAED 31 201 000 —
23 Jul 2026LandReady 7 373 sqftAED 30 982 000 —
23 Jul 2026LandReady 7 373 sqftAED 30 875 000 —
21 Jul 2026LandReady 7 552 sqftAED 29 053 000 —
15 Jul 2026LandReady 7 373 sqftAED 29 076 000 —
1 Jul 2026LandReady 18 588 sqftAED 49 098 000 —
1 Jul 2026LandReady 19 702 sqftAED 48 128 000 —
19 Jun 2026LandReady 18 236 sqftAED 52 240 000 —
10 Jun 2026LandReady 7 552 sqftAED 31 242 000 —
10 Jun 2026LandReady 7 373 sqftAED 30 535 000 —
25 May 2026LandReady 7 552 sqftAED 29 521 000 —
25 May 2026LandReady 7 373 sqftAED 31 972 000 —
21 May 2026LandReady 7 552 sqftAED 29 287 000 —
14 May 2026LandReady 20 782 sqftAED 52 834 000 —
14 May 2026LandReady 7 552 sqftAED 31 092 000 —
13 May 2026LandReady 18 971 sqftAED 50 535 000 —
12 May 2026LandReady 7 373 sqftAED 31 370 000 —
12 May 2026LandReady 20 089 sqftAED 48 513 000 —
12 May 2026LandReady 19 665 sqftAED 49 275 000 —
4 May 2026LandReady 21 611 sqftAED 51 250 000 —
4 May 2026LandReady 7 552 sqftAED 31 449 000 —
16 Apr 2026LandReady 7 552 sqftAED 31 343 000 —
16 Apr 2026LandReady 7 373 sqftAED 31 024 000 —
16 Apr 2026LandReady 19 343 sqftAED 51 929 000 —

Source: Registered DLD transactions · Data through 24 Nov 2026 · individual registrations, shown exactly as recorded, without trimming · Methodology v1.0 ↗

Every registration, on request

The full DLD record for Palm Jebel Ali - The Beach And Coral Collection - Frond E: every registered sale, mortgage and gift. It loads only when you ask; filter, sort and download it as CSV.

Registered sales by year

0102030202601020302026

registered sales per calendar year; the current year is incomplete

By month

051015NovDecJanFebMarAprMayJunJulAugSepOct051015DecFebAprJunAugOct

registered sales per month, Nov 2025 – Oct 2026

YearSalesMedian priceMedian AED/sqftTotal registered value
202637AED 31.37M —AED 1.43B

Source: Registered DLD transactions · Data through 24 Nov 2026 · calendar years; the current year is partial · Methodology v1.0 ↗

What these numbers do not show

  • Prices from the developer. Nothing here is a price list, a payment plan or availability — these are transactions already registered with DLD.
  • Whether construction is moving. The completion percentage is the figure recorded at the last technical inspection, and inspections are irregular: an unchanged number does not mean work stopped.
  • A handover promise. The declared completion date is a registry field, not a commitment.
  • Asking prices. Everything here is a registered transaction; what a home was listed at is a different number.
  • Off-market and cash-equivalent deals that never reach the registry, and the price actually negotiated before registration.
  • Service charges, chiller fees, agency commission, DLD transfer fees or mortgage costs — none of them are inside these prices.

Where this project sits

More projects in Palm Jabal Ali

Questions about Palm Jebel Ali - The Beach And Coral Collection - Frond E

Who is the developer of Palm Jebel Ali - The Beach And Coral Collection - Frond E?

The Dubai Land Department project registry lists The Palm - Jebel Ali Co. (L.L.C) as the developer of Palm Jebel Ali - The Beach And Coral Collection - Frond E.

Is Palm Jebel Ali - The Beach And Coral Collection - Frond E completed?

The DLD registry status of Palm Jebel Ali - The Beach And Coral Collection - Frond E is Active, 3% complete at the last DLD inspection. The declared completion date in the registry is 4 Dec 2028 — a registry date, not a handover promise.

How many homes are in Palm Jebel Ali - The Beach And Coral Collection - Frond E?

The DLD registry records 40 units in Palm Jebel Ali - The Beach And Coral Collection - Frond E.

What is the price per square foot in Palm Jebel Ali - The Beach And Coral Collection - Frond E?

Too few sales were registered in Palm Jebel Ali - The Beach And Coral Collection - Frond E in the last 12 months to publish a median; earlier registered sales are shown in the charts on this page.

Who holds the escrow account for Palm Jebel Ali - The Beach And Coral Collection - Frond E?

The escrow agent recorded by DLD for Palm Jebel Ali - The Beach And Coral Collection - Frond E is Mashreq Bank Psc.

Where is Palm Jebel Ali - The Beach And Coral Collection - Frond E?

Palm Jebel Ali - The Beach And Coral Collection - Frond E is in the Palm Jabal Ali community.

Where does this data come from?

From Dubai Land Department open data — the project registry, unit register and registered sales — rebuilt every night. Data through 24 Nov 2026.

Source: DLD project registry, unit register and registered sales · Data through 24 Nov 2026 · answers built from registry fields · Methodology v1.0 ↗

Cite or reuse this data

Machine-readable mirrors of this page: Markdown · JSON · llms.txt. How to cite: “Palm Jebel Ali - The Beach And Coral Collection - Frond E — Data Dubai, Continental Club Property, data through 24 Nov 2026, https://datadubai.ae/projects/palm-jebel-ali-the-beach-and-coral-collection-frond-e/”. Reuse is permitted with attribution.