Paramount Hotel-Jumeirah Waterfront
Updated 24 Nov 2026 · latest DLD registrations 24 Nov 2026 · DLD project registry and registered sales · trailing 12 months Nov 2025 – Oct 2026
Ask an AI about Paramount Hotel-Jumeirah Waterfront: ChatGPT · Claude · Perplexity
Paramount Hotel-Jumeirah Waterfront is a project by Damac Development(L L C), recorded at 7% complete at its last Dubai Land Department inspection. Fewer than 5 sales registered here in the last 12 months, so no median is published. Registry facts come from DLD; prices are registered transactions, not asking prices.
Source: Registered DLD transactions · Data through 24 Nov 2026 · sample 0 records · outlier-trimmed median, complete months only · Methodology v1.0 ↗
What the DLD registry says about this project
| Field | Value |
|---|---|
| Developer | Damac Development(L L C) |
| Status | Cancelled |
| Construction progress | 7% — at the last DLD inspection |
| Registered with DLD | 6 Aug 2013 |
| Construction started | 10 Jan 2014 |
| Declared completion | 25 Dec 2017 — registry date, not a handover promise |
| Units in the project | 0 |
| Escrow agent | Abu Dhabi Islamic Bank |
| Project number | 1361 |
Source: DLD project registry (Mashrooi) · Data through 24 Nov 2026 · registry fields as recorded, not developer marketing · Methodology v1.0 ↗
Price per square foot, month by month
No month in this window reached the five registered sales a median needs, so there is nothing to plot.
Source: Registered DLD transactions · Data through 24 Nov 2026 · monthly medians, months with fewer than 5 registered sales are left blank · Methodology v1.0 ↗
Construction, inspection by inspection
The DLD registry holds 4 technical inspections for this project, from 13 May 2014 at 0.2% to 16 Nov 2015 at 7.0%. Since 16 Apr 2015 the recorded percentage has moved 0.60 percentage points a month. Inspections are irregular and the percentage is what was recorded at each one, not a live measure of the site.
each dot is one DLD technical inspection; the line between two of them is drawn, not measured; the dashed mark is the completion date declared in the registry
| Inspection | Recorded | Change |
|---|---|---|
| 16 Nov 2015 | 7.0% | +1.0 pp |
| 31 Aug 2015 | 6.0% | +3.2 pp |
| 16 Apr 2015 | 2.8% | +2.6 pp |
| 13 May 2014 | 0.2% | — |
Source: DLD project registry (Mashrooi) — technical inspections · Data through 24 Nov 2026 · percentage as recorded at each inspection; inspections are irregular, and an unchanged value means no new inspection, not that work stopped · Methodology v1.0 ↗
What these numbers do not show
- Prices from the developer. Nothing here is a price list, a payment plan or availability — these are transactions already registered with DLD.
- Whether construction is moving. The completion percentage is the figure recorded at the last technical inspection, and inspections are irregular: an unchanged number does not mean work stopped.
- A handover promise. The declared completion date is a registry field, not a commitment.
- A reliable price. Only 0 sales registered in the last 12 months here.
- Asking prices. Everything here is a registered transaction; what a home was listed at is a different number.
- Off-market and cash-equivalent deals that never reach the registry, and the price actually negotiated before registration.
- Service charges, chiller fees, agency commission, DLD transfer fees or mortgage costs — none of them are inside these prices.
Nearby projects
3 projects with a page on this site are registered within 1.2 km of Paramount Hotel-Jumeirah Waterfront. Distance is measured between the coordinates in the DLD project registry.
| Project | Distance | Built |
|---|---|---|
| Verde(Residences) Cancelled · Eta Star Property Developers L.L.C |
120 m | 6% |
| The Anwa By Omniyat Finished · Anwa Real Estate Development L.L.C |
289 m | 100% |
| Amwaj Tower Cancelled · Mena Capital Investment (L.L.C) |
454 m | 0% |
The map loads only when you ask for it (OpenStreetMap, no tracking).
Source: DLD project registry coordinates · Data through 24 Nov 2026 · map © OpenStreetMap contributors · Methodology v1.0 ↗
Where this project sits
More projects by Damac Development(L L C)
Questions about Paramount Hotel-Jumeirah Waterfront
Who is the developer of Paramount Hotel-Jumeirah Waterfront?
The Dubai Land Department project registry lists Damac Development(L L C) as the developer of Paramount Hotel-Jumeirah Waterfront.
Is Paramount Hotel-Jumeirah Waterfront completed?
The DLD registry status of Paramount Hotel-Jumeirah Waterfront is Cancelled, 7% complete at the last DLD inspection. The declared completion date in the registry is 25 Dec 2017 — a registry date, not a handover promise.
Who holds the escrow account for Paramount Hotel-Jumeirah Waterfront?
The escrow agent recorded by DLD for Paramount Hotel-Jumeirah Waterfront is Abu Dhabi Islamic Bank.
Where is Paramount Hotel-Jumeirah Waterfront?
Paramount Hotel-Jumeirah Waterfront is in Dubai. 3 other projects with a page on this site are registered within 1.2 km; the closest is Verde(Residences), about 120 m away.
Where does this data come from?
From Dubai Land Department open data — the project registry, unit register and registered sales — rebuilt every night. Data through 24 Nov 2026.
Source: DLD project registry, unit register and registered sales · Data through 24 Nov 2026 · answers built from registry fields · Methodology v1.0 ↗
Cite or reuse this data
Machine-readable mirrors of this page: Markdown · JSON · llms.txt. How to cite: “Paramount Hotel-Jumeirah Waterfront — Data Dubai, Continental Club Property, data through 24 Nov 2026, https://datadubai.ae/projects/paramount-hotel-jumeirah-waterfront/”. Reuse is permitted with attribution.