Data Dubai

Verde(Residences)

Verde(Residences)Cancelled6% builtDLD data through 24 Nov 2026

Updated 24 Nov 2026 · latest DLD registrations 24 Nov 2026 · DLD project registry and registered sales · trailing 12 months Nov 2025 – Oct 2026

Ask an AI about Verde(Residences): ChatGPT · Claude · Perplexity

Verde(Residences) is a project by Eta Star Property Developers L.L.C, recorded at 6% complete at its last Dubai Land Department inspection. Fewer than 5 sales registered here in the last 12 months, so no median is published. Registry facts come from DLD; prices are registered transactions, not asking prices.

Median sale price
—
not enough sales
DLD verified
Median price per sqft
—
built residential only
DLD verified
Registered sales
0
all property types · trailing 12 complete months
DLD verified
Off-plan share
—
of registered sales in the window
DLD verified

Source: Registered DLD transactions · Data through 24 Nov 2026 · sample 0 records · outlier-trimmed median, complete months only · Methodology v1.0 ↗

What the DLD registry says about this project

FieldValue
DeveloperEta Star Property Developers L.L.C
StatusCancelled
Construction progress6% — at the last DLD inspection
Registered with DLD8 Nov 2008
Construction started5 Nov 2008
Declared completion1 Oct 2012 — registry date, not a handover promise
Units in the project0
Escrow agentEmirates Nbd Bank (P.J.S.C)
Project number89

Source: DLD project registry (Mashrooi) · Data through 24 Nov 2026 · registry fields as recorded, not developer marketing · Methodology v1.0 ↗

Price per square foot, month by month

No month in this window reached the five registered sales a median needs, so there is nothing to plot.

Source: Registered DLD transactions · Data through 24 Nov 2026 · monthly medians, months with fewer than 5 registered sales are left blank · Methodology v1.0 ↗

Construction, inspection by inspection

The DLD registry holds 2 technical inspections for this project, from 30 Nov 2015 at 5.7% to 20 Jul 2017 at 5.7%. Inspections are irregular and the percentage is what was recorded at each one, not a live measure of the site.

0%25%50%75%100%declared 2012-10-012015-11-302017-07-20

each dot is one DLD technical inspection; the line between two of them is drawn, not measured; the dashed mark is the completion date declared in the registry

InspectionRecordedChange
20 Jul 20175.7% +0.0 pp
30 Nov 20155.7% —

Source: DLD project registry (Mashrooi) — technical inspections · Data through 24 Nov 2026 · percentage as recorded at each inspection; inspections are irregular, and an unchanged value means no new inspection, not that work stopped · Methodology v1.0 ↗

What these numbers do not show

  • Prices from the developer. Nothing here is a price list, a payment plan or availability — these are transactions already registered with DLD.
  • Whether construction is moving. The completion percentage is the figure recorded at the last technical inspection, and inspections are irregular: an unchanged number does not mean work stopped.
  • A handover promise. The declared completion date is a registry field, not a commitment.
  • A reliable price. Only 0 sales registered in the last 12 months here.
  • Asking prices. Everything here is a registered transaction; what a home was listed at is a different number.
  • Off-market and cash-equivalent deals that never reach the registry, and the price actually negotiated before registration.
  • Service charges, chiller fees, agency commission, DLD transfer fees or mortgage costs — none of them are inside these prices.

Nearby projects

3 projects with a page on this site are registered within 1.2 km of Verde(Residences). Distance is measured between the coordinates in the DLD project registry.

ProjectDistanceBuiltUnits
Paramount Hotel-Jumeirah Waterfront
Cancelled · Damac Development(L L C)
120 m7%—
The Anwa By Omniyat
Finished · Anwa Real Estate Development L.L.C
171 m100%233
Amwaj Tower
Cancelled · Mena Capital Investment (L.L.C)
360 m0%—

The map loads only when you ask for it (OpenStreetMap, no tracking).

Source: DLD project registry coordinates · Data through 24 Nov 2026 · map © OpenStreetMap contributors · Methodology v1.0 ↗

Where this project sits

Questions about Verde(Residences)

Who is the developer of Verde(Residences)?

The Dubai Land Department project registry lists Eta Star Property Developers L.L.C as the developer of Verde(Residences).

Is Verde(Residences) completed?

The DLD registry status of Verde(Residences) is Cancelled, 6% complete at the last DLD inspection. The declared completion date in the registry is 1 Oct 2012 — a registry date, not a handover promise.

Who holds the escrow account for Verde(Residences)?

The escrow agent recorded by DLD for Verde(Residences) is Emirates Nbd Bank (P.J.S.C).

Where is Verde(Residences)?

Verde(Residences) is in Dubai. 3 other projects with a page on this site are registered within 1.2 km; the closest is Paramount Hotel-Jumeirah Waterfront, about 120 m away.

Where does this data come from?

From Dubai Land Department open data — the project registry, unit register and registered sales — rebuilt every night. Data through 24 Nov 2026.

Source: DLD project registry, unit register and registered sales · Data through 24 Nov 2026 · answers built from registry fields · Methodology v1.0 ↗

Cite or reuse this data

Machine-readable mirrors of this page: Markdown · JSON · llms.txt. How to cite: “Verde(Residences) — Data Dubai, Continental Club Property, data through 24 Nov 2026, https://datadubai.ae/projects/verde-residences/”. Reuse is permitted with attribution.