The Anwa By Omniyat

The Anwa By OmniyatFinished100% built233 homesDLD data through 24 Nov 2026

Updated 24 Nov 2026 · latest DLD registrations 24 Nov 2026 · DLD project registry and registered sales · trailing 12 months Nov 2025 – Oct 2026

Ask an AI about The Anwa By Omniyat: ChatGPT · Claude · Perplexity

The Anwa By Omniyat is a project by Anwa Real Estate Development L.L.C, recorded at 100% complete at its last Dubai Land Department inspection. 26 sales registered in the trailing 12 months at a median AED 1.84M (1 986 AED per square foot). Registry facts come from DLD; prices are registered transactions, not asking prices.

Median sale price
AED 1.84M -33.5% y/y
≈ US$ 502k · typical range AED 1.65M – AED 2.48M
DLD verified
Median price per sqft
AED 1 986/sqft -4.6% y/y
typical range 1 800 – 2 138 AED/sqft
DLD verified
Registered sales
26 -50.0% y/y
all property types · trailing 12 complete months
DLD verified
Off-plan share
0.0%
of registered sales in the window
DLD verified

Source: Registered DLD transactions · Data through 24 Nov 2026 · sample 26 records · outlier-trimmed median, complete months only · Methodology v1.0 ↗

What the DLD registry says about this project

FieldValue
DeveloperAnwa Real Estate Development L.L.C
StatusFinished
Construction progress100% — at the last DLD inspection
Registered with DLD1 Mar 2015
Construction started1 Nov 2014
Declared completion13 Dec 2021 — registry date, not a handover promise
Units in the project233
Project area26 280 sqm
Escrow agentCommercial Bank Of Dubai(Psc)
Project number1636

Source: DLD project registry (Mashrooi) · Data through 24 Nov 2026 · registry fields as recorded, not developer marketing · Methodology v1.0 ↗

Price per square foot, month by month

1 5002 0002 500May 2022Nov 2022May 2023Nov 2023May 2024Nov 2024May 2025Nov 2025May 20261 5002 0002 500May 2022Nov 2023May 2025

median   interquartile range (middle 50% of transactions)

Source: Registered DLD transactions · Data through 24 Nov 2026 · monthly medians, months with fewer than 5 registered sales are left blank; the line stops at Dec 2025: in the 10 months since, no month reached the five registered sales a median needs (12 in total) · Methodology v1.0 ↗

Construction, inspection by inspection

The DLD registry holds 16 technical inspections for this project, from 5 Oct 2015 at 10.0% to 13 Dec 2021 at 100.0%. The last inspection recorded it complete. Inspections are irregular and the percentage is what was recorded at each one, not a live measure of the site.

0%25%50%75%100%declared 2021-12-132015-10-052021-12-13

each dot is one DLD technical inspection; the line between two of them is drawn, not measured; the dashed mark is the completion date declared in the registry

InspectionRecordedChange
13 Dec 2021100.0% +2.9 pp
1 Nov 202197.1% +1.8 pp
22 Sep 202195.3% +5.3 pp
8 Jul 202190.1% +6.9 pp
9 Mar 202183.2% +11.7 pp
17 Sep 202071.5% +3.0 pp
21 Apr 202068.5% +12.9 pp
29 Jan 201955.5% +11.5 pp
25 Jul 201844.0% +6.0 pp
29 Apr 201838.1% +7.8 pp
18 Jan 201830.3% +7.0 pp
27 Sep 201723.3% +1.4 pp
26 Jul 201721.9% +0.1 pp
12 Dec 201621.8% +5.0 pp
26 May 201616.8% +6.8 pp
5 Oct 201510.0% —

Source: DLD project registry (Mashrooi) — technical inspections · Data through 24 Nov 2026 · percentage as recorded at each inspection; inspections are irregular, and an unchanged value means no new inspection, not that work stopped · Methodology v1.0 ↗

By number of bedrooms

HomesSalesMedian priceMedian AED/sqftMedian sizeMedian rentGross yield
Studios low sample (6) 6AED 1.15M 2 326 477 sqft — —
1-bedroom apartments low sample (10) 10AED 1.70M 1 949 921 sqft — —
2-bedroom apartments low sample (8) 8AED 2.50M 1 767 1 385 sqft — —
3-bedroom apartments insufficient data 2— — — — —

Source: Registered DLD sales and Ejari rental contracts · Data through 24 Nov 2026 · yield shown only where at least 15 rents and 15 ready-home sales support it · Methodology v1.0 ↗

Latest registered sales

DatePropertyRegistrationSizePriceAED/sqft
29 Oct 20263 B/R FlatReady 1 893 sqftAED 4 014 273 2 120
29 Oct 20262 B/R FlatReady 1 357 sqftAED 2 220 000 1 635
26 Oct 20262 B/R FlatReady 1 355 sqftAED 2 900 000 2 140
16 Apr 20262 B/R FlatReady 1 385 sqftAED 2 900 000 2 094
7 Apr 20261 B/R FlatReady 946 sqftAED 1 900 000 2 008
23 Mar 2026Studio FlatReady 439 sqftAED 1 175 000 2 679
16 Mar 2026Studio FlatReady 565 sqftAED 1 200 000 2 125
12 Mar 20262 B/R FlatReady 1 385 sqftAED 2 372 605 1 713
20 Feb 20262 B/R FlatReady 1 362 sqftAED 3 198 000 2 348
28 Jan 20262 B/R FlatReady 1 390 sqftAED 2 406 357 1 731
28 Jan 2026Studio FlatReady 515 sqftAED 903 870 1 756
28 Jan 20262 B/R FlatReady 1 443 sqftAED 2 502 563 1 735
24 Dec 2025Studio FlatReady 566 sqftAED 1 205 000 2 130
17 Dec 2025Studio FlatReady 436 sqftAED 1 100 000 2 521
16 Dec 20251 B/R FlatReady 853 sqftAED 1 675 000 1 964
12 Dec 20251 B/R FlatReady 976 sqftAED 2 250 080 2 305
11 Dec 20251 B/R FlatReady 994 sqftAED 1 789 291 1 800
11 Dec 20251 B/R FlatReady 920 sqftAED 1 656 759 1 800
11 Dec 20251 B/R FlatReady 922 sqftAED 1 659 669 1 800
11 Dec 20252 B/R FlatReady 1 393 sqftAED 2 506 848 1 800
11 Dec 20251 B/R FlatReady 915 sqftAED 1 646 885 1 800
20 Nov 20251 B/R FlatReady 1 003 sqftAED 2 200 000 2 193
19 Nov 20253 B/R FlatReady 1 894 sqftAED 3 406 872 1 799
14 Nov 2025Studio FlatReady 439 sqftAED 1 120 000 2 553

Source: Registered DLD transactions · Data through 24 Nov 2026 · individual registrations, shown exactly as recorded, without trimming · Methodology v1.0 ↗

Every registration, on request

The full DLD record for The Anwa By Omniyat: every registered sale, mortgage and gift, and every Ejari rent contract. It loads only when you ask; filter, sort and download it as CSV.

Registered sales by year

05010020152016201720192022202320242025202605010020152017202220242026

registered sales per calendar year; the current year is incomplete

By month

0258NovDecJanFebMarAprMayJunJulAugSepOct0258DecFebAprJunAugOct

registered sales per month, Nov 2025 – Oct 2026

YearSalesMedian priceMedian AED/sqftTotal registered value
202612AED 2.39M 2 051AED 27.69M
202562AED 2.41M 2 081AED 160.04M
202427AED 2.60M 1 878AED 72.27M
202364AED 2.09M 1 808AED 145.50M
202270AED 1.87M 1 725AED 137.82M
20192— —AED 4.28M
20171— —AED 964k
201622AED 2.66M 2 200AED 57.92M
201597AED 1.82M 1 857AED 267.99M

Source: Registered DLD transactions · Data through 24 Nov 2026 · calendar years; the current year is partial · Methodology v1.0 ↗

Rent and gross yield by year, 2022–2026

Median annual rent, AED thousand
Year1-bed flat2-bed flatGross yield
2026 YTD 95k135k—
2025 100k140k4.83%
2024 94k135k—
2023 85k130k5.13%
2022 76k125k4.94%

Source: Ejari rental contracts and registered DLD sales · Data through 24 Nov 2026 · median annual rent per year a contract starts, shown from 15 contracts; yield = median rent ÷ median ready-home price of the same year and home type, from 15 of each · Methodology v1.0 ↗

Price and sales, month by month

MonthSalesMedian priceMedian AED/sqftIQR AED/sqft
Dec 20259 AED 1.66M1 800 1 800 – 2 130
Nov 20255 AED 1.73M2 015 1 935 – 2 193
Oct 20253 —— —
Sep 20253 —— —
Aug 202513 AED 2.70M1 949 1 772 – 1 973
Jul 202511 AED 3.12M2 248 2 169 – 2 288
Jun 20254 —— —
May 20252 —— —
Apr 20252 —— —
Mar 20253 —— —
Feb 20253 —— —
Jan 20253 —— —
Dec 20243 —— —

Source: Registered DLD transactions · Data through 24 Nov 2026 · complete months only; the current month is excluded because DLD keeps registering it · Methodology v1.0 ↗

What these numbers do not show

  • Prices from the developer. Nothing here is a price list, a payment plan or availability — these are transactions already registered with DLD.
  • Whether construction is moving. The completion percentage is the figure recorded at the last technical inspection, and inspections are irregular: an unchanged number does not mean work stopped.
  • A handover promise. The declared completion date is a registry field, not a commitment.
  • Asking prices. Everything here is a registered transaction; what a home was listed at is a different number.
  • Off-market and cash-equivalent deals that never reach the registry, and the price actually negotiated before registration.
  • Service charges, chiller fees, agency commission, DLD transfer fees or mortgage costs — none of them are inside these prices.

Nearby projects

3 projects with a page on this site are registered within 1.2 km of The Anwa By Omniyat. Distance is measured between the coordinates in the DLD project registry.

ProjectDistanceBuiltUnits
Verde(Residences)
Cancelled · Eta Star Property Developers L.L.C
171 m6%—
Amwaj Tower
Cancelled · Mena Capital Investment (L.L.C)
226 m0%—
Paramount Hotel-Jumeirah Waterfront
Cancelled · Damac Development(L L C)
289 m7%—

The map loads only when you ask for it (OpenStreetMap, no tracking).

Source: DLD project registry coordinates · Data through 24 Nov 2026 · map © OpenStreetMap contributors · Methodology v1.0 ↗

Where this project sits

More projects in Dubai Maritime City

Questions about The Anwa By Omniyat

Who is the developer of The Anwa By Omniyat?

The Dubai Land Department project registry lists Anwa Real Estate Development L.L.C as the developer of The Anwa By Omniyat.

Is The Anwa By Omniyat completed?

The DLD registry status of The Anwa By Omniyat is Finished, 100% complete at the last DLD inspection. The declared completion date in the registry is 13 Dec 2021 — a registry date, not a handover promise.

How many homes are in The Anwa By Omniyat?

The DLD registry records 233 units in The Anwa By Omniyat.

What is the price per square foot in The Anwa By Omniyat?

Over the last 12 complete months the median registered sale in The Anwa By Omniyat was AED 1.84M, or AED 1 986 per sqft, from 26 registered sales. These are DLD registrations, not asking prices.

Who holds the escrow account for The Anwa By Omniyat?

The escrow agent recorded by DLD for The Anwa By Omniyat is Commercial Bank Of Dubai(Psc).

Where is The Anwa By Omniyat?

The Anwa By Omniyat is in the Dubai Maritime City community. 3 other projects with a page on this site are registered within 1.2 km; the closest is Verde(Residences), about 171 m away.

Where does this data come from?

From Dubai Land Department open data — the project registry, unit register and registered sales — rebuilt every night. Data through 24 Nov 2026.

Source: DLD project registry, unit register and registered sales · Data through 24 Nov 2026 · answers built from registry fields · Methodology v1.0 ↗