Port De La Mer - Le Pont
Updated 24 Nov 2026 · latest DLD registrations 24 Nov 2026 · DLD project registry and registered sales · trailing 12 months Nov 2025 – Oct 2026
Ask an AI about Port De La Mer - Le Pont: ChatGPT · Claude · Perplexity
Port De La Mer - Le Pont is a project by Pdlm Residential L.L.C, recorded at 100% complete at its last Dubai Land Department inspection. 12 sales registered in the trailing 12 months at a median AED 2.38M (3 004 AED per square foot). Registry facts come from DLD; prices are registered transactions, not asking prices.
Source: Registered DLD transactions · Data through 24 Nov 2026 · sample 12 records · outlier-trimmed median, complete months only · Methodology v1.0 ↗
What the DLD registry says about this project
| Field | Value |
|---|---|
| Developer | Pdlm Residential L.L.C |
| Status | Finished |
| Construction progress | 100% — at the last DLD inspection |
| Registered with DLD | 9 Apr 2019 |
| Construction started | 19 Jun 2019 |
| Declared completion | 20 Jul 2022 — registry date, not a handover promise |
| Units in the project | 155 |
| Project area | 18 776 sqm |
| Escrow agent | Dubai Islamic Bank (Public Joint Stock Company) |
| Project number | 2153 |
Source: DLD project registry (Mashrooi) · Data through 24 Nov 2026 · registry fields as recorded, not developer marketing · Methodology v1.0 ↗
Price per square foot, month by month
median interquartile range (middle 50% of transactions)
Source: Registered DLD transactions · Data through 24 Nov 2026 · monthly medians, months with fewer than 5 registered sales are left blank; the line stops at Apr 2025: in the 18 months since, no month reached the five registered sales a median needs (18 in total) · Methodology v1.0 ↗
Construction, inspection by inspection
The DLD registry holds 5 technical inspections for this project, from 22 Dec 2019 at 2.6% to 20 Jul 2022 at 100.0%. The last inspection recorded it complete. Inspections are irregular and the percentage is what was recorded at each one, not a live measure of the site.
each dot is one DLD technical inspection; the line between two of them is drawn, not measured; the dashed mark is the completion date declared in the registry
| Inspection | Recorded | Change |
|---|---|---|
| 20 Jul 2022 | 100.0% | +40.0 pp |
| 16 Dec 2021 | 60.0% | +27.5 pp |
| 5 Jul 2021 | 32.6% | +26.1 pp |
| 16 Apr 2020 | 6.5% | +3.9 pp |
| 22 Dec 2019 | 2.6% | — |
Source: DLD project registry (Mashrooi) — technical inspections · Data through 24 Nov 2026 · percentage as recorded at each inspection; inspections are irregular, and an unchanged value means no new inspection, not that work stopped · Methodology v1.0 ↗
By number of bedrooms
| Homes | Sales | Median price | Median AED/sqft | Median size | Median rent | Gross yield |
|---|---|---|---|---|---|---|
| 1-bedroom apartments low sample (10) | 10 | AED 2.37M | 2 959 | 805 sqft | — | — |
| 2-bedroom apartments insufficient data | 1 | — | — | — | — | — |
| 3-bedroom apartments insufficient data | 1 | — | — | — | — | — |
Source: Registered DLD sales and Ejari rental contracts · Data through 24 Nov 2026 · yield shown only where at least 15 rents and 15 ready-home sales support it · Methodology v1.0 ↗
Latest registered sales
| Date | Property | Registration | Size | Price | AED/sqft |
|---|---|---|---|---|---|
| 11 Nov 2026 | 1 B/R Flat — Le Pont - Building 2 | Ready | 789 sqft | AED 2 150 000 | 2 725 |
| 3 Aug 2026 | 1 B/R Flat — Le Pont - Building 3 | Ready | 815 sqft | AED 38 439 | 47 |
| 9 Jun 2026 | 1 B/R Flat — Le Pont - Building 3 | Ready | 815 sqft | AED 2 300 000 | 2 821 |
| 8 Jun 2026 | 1 B/R Flat — Le Pont - Building 3 | Ready | 823 sqft | AED 1 850 000 | 2 247 |
| 8 Apr 2026 | 3 B/R Flat — Le Pont - Building 1 | Ready | 2 436 sqft | AED 9 350 000 | 3 838 |
| 12 Feb 2026 | 1 B/R Flat — Le Pont - Building 3 | Ready | 789 sqft | AED 2 360 000 | 2 992 |
| 19 Jan 2026 | 1 B/R Flat — Le Pont - Building 2 | Ready | 789 sqft | AED 2 380 000 | 3 017 |
| 30 Dec 2025 | 1 B/R Flat — Le Pont - Building 3 | Ready | 815 sqft | AED 52 485 | 64 |
| 16 Dec 2025 | 2 B/R Flat — Le Pont - Building 3 | Ready | 1 213 sqft | AED 4 500 000 | 3 710 |
| 12 Dec 2025 | 1 B/R Flat — Le Pont - Building 2 | Ready | 791 sqft | AED 2 500 000 | 3 160 |
| 20 Nov 2025 | 1 B/R Flat — Le Pont - Building 3 | Ready | 794 sqft | AED 2 325 000 | 2 927 |
| 19 Nov 2025 | 1 B/R Flat — Le Pont - Building 3 | Ready | 823 sqft | AED 2 400 000 | 2 915 |
| 3 Nov 2025 | 1 B/R Flat — Le Pont - Building 1 | Ready | 788 sqft | AED 2 400 000 | 3 046 |
Source: Registered DLD transactions · Data through 24 Nov 2026 · individual registrations, shown exactly as recorded, without trimming · Methodology v1.0 ↗
Every registration, on request
The full DLD record for Port De La Mer - Le Pont: every registered sale, mortgage and gift, and every Ejari rent contract. It loads only when you ask; filter, sort and download it as CSV.
Registered sales by year
registered sales per calendar year; the current year is incomplete
By month
registered sales per month, May 2025 – Apr 2026
| Year | Sales | Median price | Median AED/sqft | Total registered value |
|---|---|---|---|---|
| 2026 | 6 | — | 2 992 | AED 8.89M |
| 2025 | 22 | AED 2.50M | 3 125 | AED 47.64M |
| 2024 | 19 | AED 2.78M | 2 672 | AED 51.62M |
| 2023 | 51 | AED 2.50M | 2 707 | AED 151.27M |
| 2022 | 129 | AED 2.26M | 2 424 | AED 409.12M |
| 2021 | 55 | AED 2.00M | 2 003 | AED 151.13M |
| 2020 | 20 | AED 2.45M | 2 189 | AED 43.94M |
| 2019 | 97 | AED 1.75M | 1 783 | AED 195.82M |
Source: Registered DLD transactions · Data through 24 Nov 2026 · calendar years; the current year is partial · Methodology v1.0 ↗
Rent and gross yield by year, 2023–2026
| Year | 1-bed flat | 2-bed flat | Gross yield |
|---|---|---|---|
| 2026 YTD | 123k | 190k | — |
| 2025 | 130k | 195k | — |
| 2024 | 129k | 200k | — |
| 2023 | 122k | 200k | 5.72% |
Source: Ejari rental contracts and registered DLD sales · Data through 24 Nov 2026 · median annual rent per year a contract starts, shown from 15 contracts; yield = median rent ÷ median ready-home price of the same year and home type, from 15 of each · Methodology v1.0 ↗
Price and sales, month by month
| Month | Sales | Median price | Median AED/sqft | IQR AED/sqft |
|---|---|---|---|---|
| Apr 2025 | 5 | AED 2.50M | 3 147 | 3 022 – 3 222 |
| Mar 2025 | 0 | — | — | — |
| Feb 2025 | 0 | — | — | — |
| Jan 2025 | 0 | — | — | — |
| Dec 2024 | 1 | — | — | — |
| Nov 2024 | 1 | — | — | — |
| Oct 2024 | 1 | — | — | — |
| Sep 2024 | 2 | — | — | — |
| Aug 2024 | 2 | — | — | — |
| Jul 2024 | 2 | — | — | — |
| Jun 2024 | 3 | — | — | — |
| May 2024 | 0 | — | — | — |
| Apr 2024 | 2 | — | — | — |
Source: Registered DLD transactions · Data through 24 Nov 2026 · complete months only; the current month is excluded because DLD keeps registering it · Methodology v1.0 ↗
Buildings in this project
| Building (DLD name) | Sales | Median price | Median AED/sqft | Off-plan |
|---|---|---|---|---|
| Le Pont - Building 3 low sample (8) | 8 | AED 2.34M | 2 921 | 0.0% |
| Le Pont - Building 2 insufficient data | 2 | — | — | 0.0% |
| Le Pont - Building 1 insufficient data | 2 | — | — | 0.0% |
Source: Registered DLD transactions · Data through 24 Nov 2026 · outlier-trimmed median, complete months only · Methodology v1.0 ↗
What these numbers do not show
- Prices from the developer. Nothing here is a price list, a payment plan or availability — these are transactions already registered with DLD.
- Whether construction is moving. The completion percentage is the figure recorded at the last technical inspection, and inspections are irregular: an unchanged number does not mean work stopped.
- A handover promise. The declared completion date is a registry field, not a commitment.
- A reliable price. Only 12 sales registered in the last 12 months here.
- Asking prices. Everything here is a registered transaction; what a home was listed at is a different number.
- Off-market and cash-equivalent deals that never reach the registry, and the price actually negotiated before registration.
- Service charges, chiller fees, agency commission, DLD transfer fees or mortgage costs — none of them are inside these prices.
Where this project sits
More projects in LA MER
Questions about Port De La Mer - Le Pont
Who is the developer of Port De La Mer - Le Pont?
The Dubai Land Department project registry lists Pdlm Residential L.L.C as the developer of Port De La Mer - Le Pont.
Is Port De La Mer - Le Pont completed?
The DLD registry status of Port De La Mer - Le Pont is Finished, 100% complete at the last DLD inspection. The declared completion date in the registry is 20 Jul 2022 — a registry date, not a handover promise.
How many homes are in Port De La Mer - Le Pont?
The DLD registry records 155 units in Port De La Mer - Le Pont.
What is the price per square foot in Port De La Mer - Le Pont?
Over the last 12 complete months the median registered sale in Port De La Mer - Le Pont was AED 2.38M, or AED 3 004 per sqft, from 12 registered sales. These are DLD registrations, not asking prices.
Who holds the escrow account for Port De La Mer - Le Pont?
The escrow agent recorded by DLD for Port De La Mer - Le Pont is Dubai Islamic Bank (Public Joint Stock Company).
Where is Port De La Mer - Le Pont?
Port De La Mer - Le Pont is in the LA MER community.
Where does this data come from?
From Dubai Land Department open data — the project registry, unit register and registered sales — rebuilt every night. Data through 24 Nov 2026.
Source: DLD project registry, unit register and registered sales · Data through 24 Nov 2026 · answers built from registry fields · Methodology v1.0 ↗