Port De La Mer - Le Soleil
Updated 24 Nov 2026 · latest DLD registrations 24 Nov 2026 · DLD project registry and registered sales · trailing 12 months Nov 2025 – Oct 2026
Ask an AI about Port De La Mer - Le Soleil: ChatGPT · Claude · Perplexity
Port De La Mer - Le Soleil is a project by Pdlm Residential L.L.C, recorded at 100% complete at its last Dubai Land Department inspection. 36 sales registered in the trailing 12 months at a median AED 4.00M (3 162 AED per square foot). Registry facts come from DLD; prices are registered transactions, not asking prices.
Source: Registered DLD transactions · Data through 24 Nov 2026 · sample 36 records · outlier-trimmed median, complete months only · Methodology v1.0 ↗
What the DLD registry says about this project
| Field | Value |
|---|---|
| Developer | Pdlm Residential L.L.C |
| Status | Finished |
| Construction progress | 100% — at the last DLD inspection |
| Registered with DLD | 15 Dec 2021 |
| Construction started | 6 Mar 2021 |
| Declared completion | 8 Dec 2024 — registry date, not a handover promise |
| Units in the project | 184 |
| Project area | 26 246 sqm |
| Escrow agent | Abu Dhabi Commercial Bank |
| Project number | 2332 |
Source: DLD project registry (Mashrooi) · Data through 24 Nov 2026 · registry fields as recorded, not developer marketing · Methodology v1.0 ↗
Price per square foot, month by month
median interquartile range (middle 50% of transactions)
Source: Registered DLD transactions · Data through 24 Nov 2026 · monthly medians, months with fewer than 5 registered sales are left blank; the line stops at Jan 2026: in the 9 months since, no month reached the five registered sales a median needs (14 in total) · Methodology v1.0 ↗
Construction, inspection by inspection
The DLD registry holds 10 technical inspections for this project, from 29 Dec 2022 at 0.0% to 7 Jan 2026 at 100.0%. The last inspection recorded it complete. Inspections are irregular and the percentage is what was recorded at each one, not a live measure of the site.
each dot is one DLD technical inspection; the line between two of them is drawn, not measured; the dashed mark is the completion date declared in the registry
| Inspection | Recorded | Change |
|---|---|---|
| 7 Jan 2026 | 100.0% | +12.1 pp |
| 23 Oct 2025 | 87.9% | +6.2 pp |
| 31 Jul 2025 | 81.7% | +13.1 pp |
| 2 May 2025 | 68.6% | +10.8 pp |
| 7 Feb 2025 | 57.8% | +16.6 pp |
| 21 Sep 2024 | 41.2% | +26.9 pp |
| 6 May 2024 | 14.4% | +7.9 pp |
| 27 Jul 2023 | 6.5% | +2.5 pp |
| 5 Apr 2023 | 3.9% | +3.9 pp |
| 29 Dec 2022 | 0.0% | — |
Source: DLD project registry (Mashrooi) — technical inspections · Data through 24 Nov 2026 · percentage as recorded at each inspection; inspections are irregular, and an unchanged value means no new inspection, not that work stopped · Methodology v1.0 ↗
By number of bedrooms
| Homes | Sales | Median price | Median AED/sqft | Median size | Median rent | Gross yield |
|---|---|---|---|---|---|---|
| 1-bedroom apartments low sample (10) | 10 | AED 2.30M | 2 924 | 793 sqft | — | — |
| 2-bedroom apartments low sample (15) | 15 | AED 4.85M | 3 592 | 1 271 sqft | — | — |
| 3-bedroom apartments low sample (9) | 9 | AED 7.90M | — | 2 133 sqft | — | — |
| 4-bedroom apartments insufficient data | 2 | — | — | — | — | — |
Source: Registered DLD sales and Ejari rental contracts · Data through 24 Nov 2026 · yield shown only where at least 15 rents and 15 ready-home sales support it · Methodology v1.0 ↗
Latest registered sales
| Date | Property | Registration | Size | Price | AED/sqft |
|---|---|---|---|---|---|
| 23 Nov 2026 | 3 B/R Flat — Le Ciel – Building 2 | Ready | 2 022 sqft | AED 8 400 000 | 4 154 |
| 19 Nov 2026 | 1 B/R Flat — Le Ciel – Building 3 | Ready | 787 sqft | AED 2 250 000 | 2 859 |
| 19 Nov 2026 | 2 B/R Flat — Le Ciel – Building 1 | Ready | 1 475 sqft | AED 5 000 000 | 3 390 |
| 16 Nov 2026 | 1 B/R Flat — Le Ciel – Building 3 | Ready | 400 sqft | AED 1 025 000 | 2 565 |
| 30 Oct 2026 | 1 B/R Flat — Le Ciel – Building 3 | Ready | 789 sqft | AED 2 400 000 | 3 043 |
| 29 Oct 2026 | 2 B/R Flat — Le Ciel – Building 1 | Ready | 1 442 sqft | AED 5 700 000 | 3 954 |
| 7 Oct 2026 | 1 B/R Flat — Le Ciel – Building 3 | Ready | 786 sqft | AED 2 300 000 | 2 925 |
| 6 Oct 2026 | 2 B/R Flat — Le Ciel – Building 1 | Ready | 601 sqft | AED 1 550 000 | 2 577 |
| 30 Sep 2026 | 3 B/R Flat — Le Ciel – Building 1 | Ready | 484 sqft | AED 2 025 000 | 4 181 |
| 24 Sep 2026 | 2 B/R Flat — Le Ciel – Building 1 | Ready | 1 302 sqft | AED 5 200 000 | 3 993 |
| 17 Sep 2026 | 3 B/R Flat — Le Ciel – Building 1 | Ready | 2 253 sqft | AED 10 600 000 | 4 704 |
| 12 Aug 2026 | 3 B/R Flat — Le Ciel – Building 1 | Ready | 484 sqft | AED 2 025 000 | 4 181 |
| 31 Jul 2026 | 2 B/R Flat — Le Ciel – Building 1 | Ready | 1 274 sqft | AED 4 600 000 | 3 611 |
| 29 Jun 2026 | 2 B/R Flat — Le Ciel – Building 1 | Ready | 1 271 sqft | AED 4 000 000 | 3 148 |
| 24 Jun 2026 | 1 B/R Flat — Le Ciel – Building 3 | Ready | 797 sqft | AED 1 900 000 | 2 382 |
| 22 May 2026 | 3 B/R Flat — Le Ciel – Building 1 | Ready | 2 133 sqft | AED 8 750 000 | 4 103 |
| 27 Apr 2026 | 3 B/R Flat — Le Ciel – Building 1 | Ready | 2 119 sqft | AED 9 350 000 | 4 412 |
| 27 Mar 2026 | 1 B/R Flat — Le Ciel – Building 3 | Ready | 798 sqft | AED 2 275 000 | 2 852 |
| 13 Mar 2026 | 4 B/R Flat — Le Ciel – Building 1 | Ready | 3 886 sqft | AED 17 500 000 | 4 503 |
| 13 Mar 2026 | 4 B/R Flat — Le Ciel – Building 1 | Ready | 436 sqft | AED 2 000 000 | 4 592 |
| 12 Mar 2026 | 2 B/R Flat — Le Ciel – Building 3 | Ready | 1 248 sqft | AED 4 600 000 | 3 685 |
| 9 Mar 2026 | 2 B/R Flat — Le Ciel – Building 1 | Ready | 1 274 sqft | AED 4 990 000 | 3 917 |
| 6 Mar 2026 | 1 B/R Flat — Le Ciel – Building 3 | Ready | 789 sqft | AED 2 800 000 | 3 550 |
| 2 Mar 2026 | 2 B/R Flat — Le Ciel – Building 1 | Ready | 1 203 sqft | AED 5 000 000 | 4 157 |
Source: Registered DLD transactions · Data through 24 Nov 2026 · individual registrations, shown exactly as recorded, without trimming · Methodology v1.0 ↗
Every registration, on request
The full DLD record for Port De La Mer - Le Soleil: every registered sale, mortgage and gift, and every Ejari rent contract. It loads only when you ask; filter, sort and download it as CSV.
Registered sales by year
registered sales per calendar year; the current year is incomplete
By month
registered sales per month, Nov 2025 – Oct 2026
| Year | Sales | Median price | Median AED/sqft | Total registered value |
|---|---|---|---|---|
| 2026 | 33 | AED 4.29M | 3 176 | AED 108.68M |
| 2025 | 38 | AED 3.44M | 3 238 | AED 154.51M |
| 2024 | 27 | AED 3.95M | 3 149 | AED 92.24M |
| 2023 | 15 | AED 2.45M | 2 608 | AED 54.47M |
| 2022 | 174 | AED 2.98M | 2 518 | AED 618.51M |
Source: Registered DLD transactions · Data through 24 Nov 2026 · calendar years; the current year is partial · Methodology v1.0 ↗
Price and sales, month by month
| Month | Sales | Median price | Median AED/sqft | IQR AED/sqft |
|---|---|---|---|---|
| Jan 2026 | 7 | AED 2.50M | 3 041 | 2 846 – 3 369 |
| Dec 2025 | 1 | — | — | — |
| Nov 2025 | 2 | — | — | — |
| Oct 2025 | 2 | — | — | — |
| Sep 2025 | 0 | — | — | — |
| Aug 2025 | 3 | — | — | — |
| Jul 2025 | 2 | — | — | — |
| Jun 2025 | 3 | — | — | — |
| May 2025 | 6 | AED 2.55M | 3 188 | 3 051 – 3 351 |
| Apr 2025 | 8 | AED 3.29M | 3 299 | 2 890 – 3 541 |
| Mar 2025 | 2 | — | — | — |
| Feb 2025 | 7 | AED 4.95M | 3 818 | 3 554 – 3 960 |
| Jan 2025 | 2 | — | — | — |
Source: Registered DLD transactions · Data through 24 Nov 2026 · complete months only; the current month is excluded because DLD keeps registering it · Methodology v1.0 ↗
Buildings in this project
| Building (DLD name) | Sales | Median price | Median AED/sqft | Off-plan |
|---|---|---|---|---|
| Le Ciel – Building 1 | 24 | AED 4.75M | 3 577 | 8.3% |
| Le Ciel – Building 3 low sample (9) | 9 | AED 2.30M | 2 925 | 0.0% |
| Le Ciel – Building 2 insufficient data | 3 | — | — | 66.7% |
Source: Registered DLD transactions · Data through 24 Nov 2026 · outlier-trimmed median, complete months only · Methodology v1.0 ↗
What these numbers do not show
- Prices from the developer. Nothing here is a price list, a payment plan or availability — these are transactions already registered with DLD.
- Whether construction is moving. The completion percentage is the figure recorded at the last technical inspection, and inspections are irregular: an unchanged number does not mean work stopped.
- A handover promise. The declared completion date is a registry field, not a commitment.
- Asking prices. Everything here is a registered transaction; what a home was listed at is a different number.
- Off-market and cash-equivalent deals that never reach the registry, and the price actually negotiated before registration.
- Service charges, chiller fees, agency commission, DLD transfer fees or mortgage costs — none of them are inside these prices.
Where this project sits
More projects in LA MER
Questions about Port De La Mer - Le Soleil
Who is the developer of Port De La Mer - Le Soleil?
The Dubai Land Department project registry lists Pdlm Residential L.L.C as the developer of Port De La Mer - Le Soleil.
Is Port De La Mer - Le Soleil completed?
The DLD registry status of Port De La Mer - Le Soleil is Finished, 100% complete at the last DLD inspection. The declared completion date in the registry is 8 Dec 2024 — a registry date, not a handover promise.
How many homes are in Port De La Mer - Le Soleil?
The DLD registry records 184 units in Port De La Mer - Le Soleil.
What is the price per square foot in Port De La Mer - Le Soleil?
Over the last 12 complete months the median registered sale in Port De La Mer - Le Soleil was AED 4.00M, or AED 3 162 per sqft, from 36 registered sales. These are DLD registrations, not asking prices.
Who holds the escrow account for Port De La Mer - Le Soleil?
The escrow agent recorded by DLD for Port De La Mer - Le Soleil is Abu Dhabi Commercial Bank.
Where is Port De La Mer - Le Soleil?
Port De La Mer - Le Soleil is in the LA MER community.
Where does this data come from?
From Dubai Land Department open data — the project registry, unit register and registered sales — rebuilt every night. Data through 24 Nov 2026.
Source: DLD project registry, unit register and registered sales · Data through 24 Nov 2026 · answers built from registry fields · Methodology v1.0 ↗