Sky Suites By Peace Homes
Data through 7 Sep 2026 · DLD project registry and registered sales · trailing 12 months Sep 2025 – Aug 2026 · rebuilt daily
Sky Suites By Peace Homes is a project by Peace Homes Signatures Development L.L.C, recorded at 56% complete at its last Dubai Land Department inspection. 53 sales registered in the trailing 12 months at a median AED 1.10M (1 659 AED per square foot). Registry facts come from DLD; prices are registered transactions, not asking prices.
Source: Registered DLD transactions · Data through 7 Sep 2026 · sample 53 records · outlier-trimmed median, complete months only · Methodology v1.0 ↗
What the DLD registry says about this project
| Field | Value | Provenance |
|---|---|---|
| Developer | Peace Homes Signatures Development L.L.C | DLD verified |
| Status | Active | DLD verified |
| Construction progress | 56% — at the last DLD inspection | DLD verified |
| Registered with DLD | 16 Jun 2023 | DLD verified |
| Construction started | 15 Sep 2023 | DLD verified |
| Declared completion | 25 Dec 2025 — registry date, not a handover promise | DLD verified |
| Units in the project | 239 | DLD verified |
| Project area | 15 941 sqm | DLD verified |
| Escrow agent | Mashreq Bank Psc | DLD verified |
| Project number | 2665 | DLD verified |
Source: DLD project registry (Mashrooi) · Data through 7 Sep 2026 · registry fields as recorded, not developer marketing · Methodology v1.0 ↗
Price per square foot, month by month
median interquartile range (middle 50% of transactions)
Source: Registered DLD transactions · Data through 7 Sep 2026 · monthly medians, months with fewer than 5 registered sales are left blank; the line stops at Jul 2026: in the 1 months since, no month reached the five registered sales a median needs (1 in total) · Methodology v1.0 ↗
Construction, inspection by inspection
The DLD registry holds 6 technical inspections for this project, from 15 May 2023 at 2.9% to 27 Jul 2026 at 55.5%. Over the inspections since 15 Oct 2025 it moved 3.26 percentage points a month. Inspections are irregular and the percentage is what was recorded at each one, not a live measure of the site.
each dot is one DLD technical inspection; the line between two of them is drawn, not measured; the dashed mark is the completion date declared in the registry
| Inspection | Recorded | Change |
|---|---|---|
| 27 Jul 2026 | 55.5% | +21.5 pp |
| 14 Jan 2026 | 34.0% | +9.0 pp |
| 15 Oct 2025 | 25.1% | +20.2 pp |
| 30 Jun 2024 | 4.8% | +1.6 pp |
| 17 May 2024 | 3.2% | +0.3 pp |
| 15 May 2023 | 2.9% | — |
Source: DLD project registry (Mashrooi) — technical inspections · Data through 7 Sep 2026 · percentage as recorded at each inspection; inspections are irregular, and an unchanged value means no new inspection, not that work stopped · Methodology v1.0 ↗
The same figures as a table
| Month | Sales | Median price | Median AED/sqft | IQR AED/sqft |
|---|---|---|---|---|
| Jul 2026 | 5 | AED 897k | 1 792 | 1 604 – 1 908 |
| Jun 2026 | 4 | — | — | — |
| May 2026 | 0 | — | — | — |
| Apr 2026 | 2 | — | — | — |
| Mar 2026 | 1 | — | — | — |
| Feb 2026 | 5 | AED 850k | 1 652 | 1 395 – 1 655 |
| Jan 2026 | 2 | — | — | — |
| Dec 2025 | 3 | — | — | — |
| Nov 2025 | 13 | AED 1.34M | 1 585 | 1 508 – 1 853 |
| Oct 2025 | 13 | AED 864k | 1 815 | 1 769 – 1 842 |
| Sep 2025 | 4 | — | — | — |
| Aug 2025 | 5 | AED 1.40M | 1 658 | 1 594 – 1 658 |
| Jul 2025 | 2 | — | — | — |
Source: Registered DLD transactions · Data through 7 Sep 2026 · complete months only; the current month is excluded because DLD keeps registering it · Methodology v1.0 ↗
By number of bedrooms
| Homes | Sales | Median price | Median AED/sqft | Median size | Median rent | Gross yield |
|---|---|---|---|---|---|---|
| Studios | 26 | AED 867k | 1 837 | 469 sqft | — | — |
| 1-bedroom apartments | 27 | AED 1.37M | 1 514 | 918 sqft | — | — |
Source: Registered DLD sales and Ejari rental contracts · Data through 7 Sep 2026 · yield shown only where at least 15 rents and 15 ready-home sales support it · Methodology v1.0 ↗
Registered sales by year
median interquartile range (middle 50% of transactions)
| Year | Sales | Median price | Median AED/sqft | Total registered value |
|---|---|---|---|---|
| 2026 | 20 | AED 1.25M | 1 566 | AED 22.91M |
| 2025 | 74 | AED 1.25M | 1 658 | AED 84.99M |
| 2024 | 30 | AED 680k | 777 | AED 25.69M |
| 2023 | 1 | — | — | AED 0 |
| 2016 | 1 | — | — | AED 12.32M |
Source: Registered DLD transactions · Data through 7 Sep 2026 · calendar years; the current year is partial · Methodology v1.0 ↗
Latest registered sales
| Date | Property | Registration | Size | Price | AED/sqft |
|---|---|---|---|---|---|
| 24 Aug 2026 | 1 B/R Hotel Apartment — Sky Suites by Peace Homes | Off-plan | 830 sqft | AED 1 341 545 | 1 616 |
| 30 Jul 2026 | 1 B/R Hotel Apartment — Sky Suites by Peace Homes | Off-plan | 918 sqft | AED 1 152 000 | 1 255 |
| 30 Jul 2026 | Studio Hotel Apartment — Sky Suites by Peace Homes | Off-plan | 470 sqft | AED 897 255 | 1 908 |
| 30 Jul 2026 | Studio Hotel Apartment — Sky Suites by Peace Homes | Off-plan | 468 sqft | AED 895 350 | 1 914 |
| 14 Jul 2026 | 1 B/R Hotel Apartment — Sky Suites by Peace Homes | Off-plan | 830 sqft | AED 1 487 497 | 1 792 |
| 13 Jul 2026 | Studio Hotel Apartment — Sky Suites by Peace Homes | Off-plan | 468 sqft | AED 750 000 | 1 604 |
| 22 Jun 2026 | 1 B/R Hotel Apartment — Sky Suites by Peace Homes | Off-plan | 1 011 sqft | AED 1 450 000 | 1 434 |
| 18 Jun 2026 | Studio Hotel Apartment — Sky Suites by Peace Homes | Off-plan | 472 sqft | AED 893 650 | 1 895 |
| 5 Jun 2026 | 1 B/R Hotel Apartment — Sky Suites by Peace Homes | Off-plan | 1 011 sqft | AED 1 545 898 | 1 529 |
| 5 Jun 2026 | 1 B/R Hotel Apartment — Sky Suites by Peace Homes | Off-plan | 830 sqft | AED 1 254 102 | 1 511 |
| 27 Apr 2026 | 1 B/R Hotel Apartment — Sky Suites by Peace Homes | Off-plan | 829 sqft | AED 1 254 380 | 1 514 |
| 3 Apr 2026 | Studio Hotel Apartment — Sky Suites by Peace Homes | Off-plan | 470 sqft | AED 859 034 | 1 827 |
Source: Registered DLD transactions · Data through 7 Sep 2026 · individual registrations, shown exactly as recorded, without trimming · Methodology v1.0 ↗
What these numbers do not show
- Prices from the developer. Nothing here is a price list, a payment plan or availability — these are transactions already registered with DLD.
- Whether construction is moving. The completion percentage is the figure recorded at the last technical inspection, and inspections are irregular: an unchanged number does not mean work stopped.
- A handover promise. The declared completion date is a registry field, not a commitment.
- Asking prices. Everything here is a registered transaction; what a home was listed at is a different number.
- Off-market and cash-equivalent deals that never reach the registry, and the price actually negotiated before registration.
- Service charges, chiller fees, agency commission, DLD transfer fees or mortgage costs — none of them are inside these prices.
Where this project sits
For AI agents and researchers
Machine-readable mirrors of this page: Markdown · JSON · llms.txt. How to cite: “Sky Suites By Peace Homes — Dubai Data, Continental Club Property, data through 7 Sep 2026, https://datadubai.ae/projects/sky-suites-by-peace-homes/”. Reuse is permitted with attribution.