Data Dubai

The 100

The 100Finished100% built91 homesDLD data through 24 Nov 2026

Updated 24 Nov 2026 · latest DLD registrations 24 Nov 2026 · DLD project registry and registered sales · trailing 12 months Nov 2025 – Oct 2026

Ask an AI about The 100: ChatGPT · Claude · Perplexity

The 100 is a project by The 100 L.L.C-Fz, recorded at 100% complete at its last Dubai Land Department inspection. 6 sales registered in the trailing 12 months at a median AED 2.27M (1 928 AED per square foot). Registry facts come from DLD; prices are registered transactions, not asking prices.

Median sale price
AED 2.27M +9.9% y/y
≈ US$ 618k · typical range AED 2.23M – AED 3.31M
DLD verified
Median price per sqft
AED 1 928/sqft +10.4% y/y
typical range 1 773 – 1 965 AED/sqft
DLD verified
Registered sales
6 -90.0% y/y
all property types · trailing 12 complete months
DLD verified
Off-plan share
0.0%
of registered sales in the window
DLD verified

Source: Registered DLD transactions · Data through 24 Nov 2026 · sample 6 records · outlier-trimmed median, complete months only · Methodology v1.0 ↗

What the DLD registry says about this project

FieldValue
DeveloperThe 100 L.L.C-Fz
StatusFinished
Construction progress100% — at the last DLD inspection
Registered with DLD23 Feb 2024
Construction started18 May 2022
Declared completion19 Mar 2025 — registry date, not a handover promise
Units in the project91
Project area14 007 sqm
Escrow agentAjman Bank /P.J.S.C
Project number2921

Source: DLD project registry (Mashrooi) · Data through 24 Nov 2026 · registry fields as recorded, not developer marketing · Methodology v1.0 ↗

Price per square foot, month by month

Fewer than six months reached the five registered sales a median needs — too few to draw a line that would mean anything.

Source: Registered DLD transactions · Data through 24 Nov 2026 · monthly medians, months with fewer than 5 registered sales are left blank; the line stops at Jun 2025: in the 16 months since, no month reached the five registered sales a median needs (13 in total) · Methodology v1.0 ↗

Construction, inspection by inspection

The DLD registry holds 3 technical inspections for this project, from 12 Feb 2024 at 68.0% to 19 Mar 2025 at 100.0%. The last inspection recorded it complete. Inspections are irregular and the percentage is what was recorded at each one, not a live measure of the site.

0%25%50%75%100%declared 2025-03-192024-02-122025-03-19

each dot is one DLD technical inspection; the line between two of them is drawn, not measured; the dashed mark is the completion date declared in the registry

InspectionRecordedChange
19 Mar 2025100.0% +4.0 pp
7 Oct 202496.0% +28.0 pp
12 Feb 202468.0% —

Source: DLD project registry (Mashrooi) — technical inspections · Data through 24 Nov 2026 · percentage as recorded at each inspection; inspections are irregular, and an unchanged value means no new inspection, not that work stopped · Methodology v1.0 ↗

By number of bedrooms

HomesSalesMedian priceMedian AED/sqftMedian sizeMedian rentGross yield
1-bedroom apartments insufficient data 3— — — — —
2-bedroom apartments insufficient data 2— — — — —
4-bedroom apartments insufficient data 1— — — — —

Source: Registered DLD sales and Ejari rental contracts · Data through 24 Nov 2026 · yield shown only where at least 15 rents and 15 ready-home sales support it · Methodology v1.0 ↗

Latest registered sales

DatePropertyRegistrationSizePriceAED/sqft
28 Oct 20264 B/R Flat — 1Ready 4 293 sqftAED 11 330 000 2 639
22 Dec 20251 B/R Flat — 2Ready 1 292 sqftAED 2 092 471 1 620
18 Dec 20252 B/R Flat — 1Ready 1 762 sqftAED 3 350 000 1 902
20 Nov 20251 B/R Flat — 1Ready 1 131 sqftAED 2 225 000 1 968
6 Nov 20251 B/R Flat — 2Ready 1 162 sqftAED 2 270 000 1 954
4 Nov 20252 B/R Flat — 2Ready 1 912 sqftAED 3 309 330 1 731

Source: Registered DLD transactions · Data through 24 Nov 2026 · individual registrations, shown exactly as recorded, without trimming · Methodology v1.0 ↗

Every registration, on request

The full DLD record for The 100: every registered sale, mortgage and gift, and every Ejari rent contract. It loads only when you ask; filter, sort and download it as CSV.

Registered sales by year

0204060201320212022202320242025202602040602013202120222023202420252026

registered sales per calendar year; the current year is incomplete

By month

0123JulAugSepOctNovDecJanFebMarAprMayJun0123AugOctDecFebAprJun

registered sales per month, Jul 2025 – Jun 2026

YearSalesMedian priceMedian AED/sqftTotal registered value
20261— —AED 0
202533AED 2.08M 1 741AED 92.24M
202470AED 2.23M 1 757AED 194.26M
20231— —AED 27.00M
20221— —AED 27.00M
20211— —AED 5.50M
20131— —AED 9.38M

Source: Registered DLD transactions · Data through 24 Nov 2026 · calendar years; the current year is partial · Methodology v1.0 ↗

Price and sales, month by month

MonthSalesMedian priceMedian AED/sqftIQR AED/sqft
Jun 20255 AED 2.04M1 641 1 614 – 1 740
May 20251 —— —
Apr 20250 —— —
Mar 20251 —— —
Feb 20253 —— —
Jan 202511 AED 2.04M1 734 1 718 – 1 749
Dec 20240 —— —
Nov 202432 AED 2.07M1 749 1 706 – 1 785
Oct 20240 —— —
Sep 20240 —— —
Aug 202424 AED 3.31M1 771 1 728 – 1 802
Jul 20247 AED 2.93M1 735 1 700 – 1 754

Source: Registered DLD transactions · Data through 24 Nov 2026 · complete months only; the current month is excluded because DLD keeps registering it · Methodology v1.0 ↗

Buildings in this project

Building (DLD name)SalesMedian priceMedian AED/sqftOff-plan
The 100 - 2 insufficient data 3— —0.0%
The 100 - 1 insufficient data 3— —0.0%

Source: Registered DLD transactions · Data through 24 Nov 2026 · outlier-trimmed median, complete months only · Methodology v1.0 ↗

What these numbers do not show

  • Prices from the developer. Nothing here is a price list, a payment plan or availability — these are transactions already registered with DLD.
  • Whether construction is moving. The completion percentage is the figure recorded at the last technical inspection, and inspections are irregular: an unchanged number does not mean work stopped.
  • A handover promise. The declared completion date is a registry field, not a commitment.
  • A reliable price. Only 6 sales registered in the last 12 months here.
  • Asking prices. Everything here is a registered transaction; what a home was listed at is a different number.
  • Off-market and cash-equivalent deals that never reach the registry, and the price actually negotiated before registration.
  • Service charges, chiller fees, agency commission, DLD transfer fees or mortgage costs — none of them are inside these prices.

Where this project sits

More projects in Meydan Racecourse Community

Questions about The 100

Who is the developer of The 100?

The Dubai Land Department project registry lists The 100 L.L.C-Fz as the developer of The 100.

Is The 100 completed?

The DLD registry status of The 100 is Finished, 100% complete at the last DLD inspection. The declared completion date in the registry is 19 Mar 2025 — a registry date, not a handover promise.

How many homes are in The 100?

The DLD registry records 91 units in The 100.

What is the price per square foot in The 100?

Over the last 12 complete months the median registered sale in The 100 was AED 2.27M, or AED 1 928 per sqft, from 6 registered sales. These are DLD registrations, not asking prices.

Who holds the escrow account for The 100?

The escrow agent recorded by DLD for The 100 is Ajman Bank /P.J.S.C.

Where is The 100?

The 100 is in the Meydan Racecourse Community community.

Where does this data come from?

From Dubai Land Department open data — the project registry, unit register and registered sales — rebuilt every night. Data through 24 Nov 2026.

Source: DLD project registry, unit register and registered sales · Data through 24 Nov 2026 · answers built from registry fields · Methodology v1.0 ↗

Cite or reuse this data

Machine-readable mirrors of this page: Markdown · JSON · llms.txt. How to cite: “The 100 — Data Dubai, Continental Club Property, data through 24 Nov 2026, https://datadubai.ae/projects/the-100/”. Reuse is permitted with attribution.