Time 2
Updated 24 Nov 2026 · latest DLD registrations 24 Nov 2026 · DLD project registry and registered sales · trailing 12 months Nov 2025 – Oct 2026
Ask an AI about Time 2: ChatGPT · Claude · Perplexity
Time 2 is a project by Time Properties, recorded at 87% complete at its last Dubai Land Department inspection. 31 sales registered in the trailing 12 months at a median AED 760k (995 AED per square foot). Registry facts come from DLD; prices are registered transactions, not asking prices.
Source: Registered DLD transactions · Data through 24 Nov 2026 · sample 31 records · outlier-trimmed median, complete months only · Methodology v1.0 ↗
What the DLD registry says about this project
| Field | Value |
|---|---|
| Developer | Time Properties |
| Status | Active |
| Construction progress | 87% — at the last DLD inspection |
| Registered with DLD | 9 Feb 2023 |
| Construction started | 1 Jan 2023 |
| Declared completion | 1 Jun 2026 — registry date, not a handover promise |
| Units in the project | 304 |
| Project area | 20 538 sqm |
| Escrow agent | Emirates Islamic Bank P.J.S.C. |
| Project number | 2541 |
Source: DLD project registry (Mashrooi) · Data through 24 Nov 2026 · registry fields as recorded, not developer marketing · Methodology v1.0 ↗
Price per square foot, month by month
median interquartile range (middle 50% of transactions)
Source: Registered DLD transactions · Data through 24 Nov 2026 · monthly medians, months with fewer than 5 registered sales are left blank; the line stops at Jul 2026: in the 3 months since, no month reached the five registered sales a median needs (9 in total) · Methodology v1.0 ↗
Construction, inspection by inspection
The DLD registry holds 8 technical inspections for this project, from 20 Dec 2022 at 0.0% to 28 Apr 2026 at 87.1%. Over the inspections since 8 Nov 2024 it moved 3.19 percentage points a month. Inspections are irregular and the percentage is what was recorded at each one, not a live measure of the site.
each dot is one DLD technical inspection; the line between two of them is drawn, not measured; the dashed mark is the completion date declared in the registry
| Inspection | Recorded | Change |
|---|---|---|
| 28 Apr 2026 | 87.1% | +15.0 pp |
| 8 Dec 2025 | 72.1% | +12.8 pp |
| 31 Jul 2025 | 59.3% | +14.1 pp |
| 25 Feb 2025 | 45.2% | +14.2 pp |
| 8 Nov 2024 | 31.0% | +8.8 pp |
| 4 Jun 2024 | 22.2% | +4.2 pp |
| 14 Mar 2024 | 18.0% | +18.0 pp |
| 20 Dec 2022 | 0.0% | — |
Source: DLD project registry (Mashrooi) — technical inspections · Data through 24 Nov 2026 · percentage as recorded at each inspection; inspections are irregular, and an unchanged value means no new inspection, not that work stopped · Methodology v1.0 ↗
Homes and registered off-plan sales
Off-plan sale registrations in Time 2 (360) already equal 100% of the 304 homes in the DLD unit register, as of 23 Nov 2026. Few homes, if any, are left without a registered sale — the count includes resales, so a small number may still be unsold.
| Homes | In unit register | Registered sales |
|---|---|---|
| Studios | 71 | 83 |
| 1 bedroom | 199 | 240 |
| 2 bedrooms | 24 | 26 |
| 3 bedrooms | 10 | 11 |
Source: DLD unit register and registered off-plan sales · Data through 23 Nov 2026 · 'Sell - Pre registration' registrations include resales before completion, so the gap is a floor, not the developer's availability · Methodology v1.0 ↗
Homes without a registered sale in all Dubai off-plan projects →
By number of bedrooms
| Homes | Sales | Median price | Median AED/sqft | Median size | Median rent | Gross yield |
|---|---|---|---|---|---|---|
| Studios insufficient data | 3 | — | — | — | — | — |
| 1-bedroom apartments | 25 | AED 750k | 995 | 764 sqft | — | — |
| 2-bedroom apartments insufficient data | 2 | — | — | — | — | — |
| 3-bedroom apartments insufficient data | 1 | — | — | — | — | — |
Source: Registered DLD sales and Ejari rental contracts · Data through 24 Nov 2026 · yield shown only where at least 15 rents and 15 ready-home sales support it · Methodology v1.0 ↗
Latest registered sales
| Date | Property | Registration | Size | Price | AED/sqft |
|---|---|---|---|---|---|
| 18 Nov 2026 | 1 B/R Flat | Off-plan | 764 sqft | AED 750 000 | 981 |
| 16 Nov 2026 | Studio Flat | Off-plan | 326 sqft | AED 450 000 | 1 382 |
| 10 Nov 2026 | Studio Flat | Off-plan | 326 sqft | AED 475 000 | 1 459 |
| 12 Oct 2026 | 1 B/R Flat | Off-plan | 753 sqft | AED 765 000 | 1 016 |
| 6 Oct 2026 | Studio Flat | Off-plan | 330 sqft | AED 490 000 | 1 485 |
| 6 Oct 2026 | 2 B/R Flat | Off-plan | 1 148 sqft | AED 1 070 000 | 932 |
| 2 Oct 2026 | 1 B/R Flat | Off-plan | 774 sqft | AED 780 000 | 1 008 |
| 18 Sep 2026 | 1 B/R Flat | Off-plan | 754 sqft | AED 725 000 | 962 |
| 8 Sep 2026 | 1 B/R Flat | Off-plan | 751 sqft | AED 730 000 | 972 |
| 1 Sep 2026 | 1 B/R Flat | Off-plan | 795 sqft | AED 760 000 | 956 |
| 25 Aug 2026 | 1 B/R Flat | Off-plan | 767 sqft | AED 725 000 | 946 |
| 21 Aug 2026 | 1 B/R Flat | Off-plan | 759 sqft | AED 720 000 | 949 |
| 29 Jul 2026 | 1 B/R Flat | Off-plan | 764 sqft | AED 790 000 | 1 034 |
| 27 Jul 2026 | 2 B/R Flat | Off-plan | 1 042 sqft | AED 925 000 | 887 |
| 20 Jul 2026 | 1 B/R Flat | Off-plan | 753 sqft | AED 735 000 | 976 |
| 15 Jul 2026 | 1 B/R Flat | Off-plan | 767 sqft | AED 765 000 | 998 |
| 13 Jul 2026 | 1 B/R Flat | Off-plan | 749 sqft | AED 785 000 | 1 049 |
| 16 Jun 2026 | 1 B/R Flat | Off-plan | 774 sqft | AED 770 000 | 995 |
| 15 Jun 2026 | 1 B/R Flat | Off-plan | 774 sqft | AED 652 000 | 843 |
| 9 Jun 2026 | Studio Flat | Off-plan | 317 sqft | AED 405 000 | 1 277 |
| 2 Jun 2026 | 1 B/R Flat | Off-plan | 764 sqft | AED 730 000 | 955 |
| 22 May 2026 | 1 B/R Flat | Off-plan | 751 sqft | AED 750 000 | 999 |
| 18 May 2026 | 1 B/R Flat | Off-plan | 768 sqft | AED 770 000 | 1 003 |
| 15 May 2026 | 1 B/R Flat | Off-plan | 774 sqft | AED 770 000 | 995 |
Source: Registered DLD transactions · Data through 24 Nov 2026 · individual registrations, shown exactly as recorded, without trimming · Methodology v1.0 ↗
Every registration, on request
The full DLD record for Time 2: every registered sale, mortgage and gift. It loads only when you ask; filter, sort and download it as CSV.
Registered sales by year
registered sales per calendar year; the current year is incomplete
By month
registered sales per month, Nov 2025 – Oct 2026
| Year | Sales | Median price | Median AED/sqft | Total registered value |
|---|---|---|---|---|
| 2026 | 26 | AED 760k | 995 | AED 19.03M |
| 2025 | 25 | AED 715k | 1 038 | AED 13.74M |
| 2024 | 28 | AED 685k | 905 | AED 15.34M |
| 2023 | 279 | AED 626k | 825 | AED 148.56M |
| 2020 | 1 | — | — | AED 3.52M |
| 2018 | 1 | — | — | AED 18.81M |
| 2014 | 1 | — | — | AED 21.92M |
Source: Registered DLD transactions · Data through 24 Nov 2026 · calendar years; the current year is partial · Methodology v1.0 ↗
Price and sales, month by month
| Month | Sales | Median price | Median AED/sqft | IQR AED/sqft |
|---|---|---|---|---|
| Jul 2026 | 5 | AED 785k | 998 | 976 – 1 034 |
| Jun 2026 | 3 | — | — | — |
| May 2026 | 3 | — | — | — |
| Apr 2026 | 1 | — | — | — |
| Mar 2026 | 2 | — | — | — |
| Feb 2026 | 1 | — | — | — |
| Jan 2026 | 1 | — | — | — |
| Dec 2025 | 2 | — | — | — |
| Nov 2025 | 2 | — | — | — |
| Oct 2025 | 2 | — | — | — |
| Sep 2025 | 2 | — | — | — |
| Aug 2025 | 1 | — | — | — |
| Jul 2025 | 5 | AED 670k | — | — |
Source: Registered DLD transactions · Data through 24 Nov 2026 · complete months only; the current month is excluded because DLD keeps registering it · Methodology v1.0 ↗
What these numbers do not show
- Prices from the developer. Nothing here is a price list, a payment plan or availability — these are transactions already registered with DLD.
- Whether construction is moving. The completion percentage is the figure recorded at the last technical inspection, and inspections are irregular: an unchanged number does not mean work stopped.
- A handover promise. The declared completion date is a registry field, not a commitment.
- Asking prices. Everything here is a registered transaction; what a home was listed at is a different number.
- Off-market and cash-equivalent deals that never reach the registry, and the price actually negotiated before registration.
- Service charges, chiller fees, agency commission, DLD transfer fees or mortgage costs — none of them are inside these prices.
Where this project sits
More projects in Dubai Land Residence Complex
Questions about Time 2
Who is the developer of Time 2?
The Dubai Land Department project registry lists Time Properties as the developer of Time 2.
Is Time 2 completed?
The DLD registry status of Time 2 is Active, 87% complete at the last DLD inspection. The declared completion date in the registry is 1 Jun 2026 — a registry date, not a handover promise.
How many homes are in Time 2?
The DLD registry records 304 units in Time 2. The split by number of bedrooms is in the unit register table on this page.
What is the price per square foot in Time 2?
Over the last 12 complete months the median registered sale in Time 2 was AED 760k, or AED 995 per sqft, from 31 registered sales. These are DLD registrations, not asking prices.
Who holds the escrow account for Time 2?
The escrow agent recorded by DLD for Time 2 is Emirates Islamic Bank P.J.S.C..
Where is Time 2?
Time 2 is in the Dubai Land Residence Complex community.
Where does this data come from?
From Dubai Land Department open data — the project registry, unit register and registered sales — rebuilt every night. Data through 24 Nov 2026.
Source: DLD project registry, unit register and registered sales · Data through 24 Nov 2026 · answers built from registry fields · Methodology v1.0 ↗
Put this project on your website
Paste this code into any page to show the price-per-sqft chart and the latest registered sales for Time 2. It updates every night by itself and always carries the source line and a link back here — that link is the only condition of reuse. Preview · data API and other embeds.