Time 3
Updated 25 Nov 2026 · latest DLD registrations 25 Nov 2026 · DLD project registry and registered sales · trailing 12 months Nov 2025 – Oct 2026
Ask an AI about Time 3: ChatGPT · Claude · Perplexity
Time 3 is a project by Time Properties, recorded at 47% complete at its last Dubai Land Department inspection. 12 sales registered in the trailing 12 months at a median AED 921k (1 128 AED per square foot). Registry facts come from DLD; prices are registered transactions, not asking prices.
Source: Registered DLD transactions · Data through 25 Nov 2026 · sample 12 records · outlier-trimmed median, complete months only · Methodology v1.0 ↗
What the DLD registry says about this project
| Field | Value |
|---|---|
| Developer | Time Properties |
| Status | Active |
| Construction progress | 47% — at the last DLD inspection |
| Registered with DLD | 20 Aug 2024 |
| Construction started | 1 Aug 2024 |
| Declared completion | 1 Aug 2027 — registry date, not a handover promise |
| Units in the project | 288 |
| Project area | 21 766 sqm |
| Escrow agent | Emirates Islamic Bank P.J.S.C. |
| Project number | 3155 |
Source: DLD project registry (Mashrooi) · Data through 25 Nov 2026 · registry fields as recorded, not developer marketing · Methodology v1.0 ↗
Price per square foot, month by month
median interquartile range (middle 50% of transactions)
Source: Registered DLD transactions · Data through 25 Nov 2026 · monthly medians, months with fewer than 5 registered sales are left blank; the line stops at Jun 2025: in the 16 months since, no month reached the five registered sales a median needs (18 in total) · Methodology v1.0 ↗
Construction, inspection by inspection
The DLD registry holds 5 technical inspections for this project, from 26 Jul 2024 at 0.0% to 24 Aug 2026 at 47.1%. Over the inspections since 15 Apr 2025 it moved 2.72 percentage points a month. Inspections are irregular and the percentage is what was recorded at each one, not a live measure of the site.
each dot is one DLD technical inspection; the line between two of them is drawn, not measured; the dashed mark is the completion date declared in the registry
| Inspection | Recorded | Change |
|---|---|---|
| 24 Aug 2026 | 47.1% | +14.4 pp |
| 27 Mar 2026 | 32.7% | +11.5 pp |
| 5 Nov 2025 | 21.2% | +18.3 pp |
| 15 Apr 2025 | 2.9% | +2.9 pp |
| 26 Jul 2024 | 0.0% | — |
Source: DLD project registry (Mashrooi) — technical inspections · Data through 25 Nov 2026 · percentage as recorded at each inspection; inspections are irregular, and an unchanged value means no new inspection, not that work stopped · Methodology v1.0 ↗
Homes and registered off-plan sales
The DLD unit register lists 288 homes in Time 3, and 266 off-plan sale registrations have been recorded since September 2024, as of 24 Nov 2026. After 2.2 years of sales, resales make up a growing part of those registrations, so we do not turn them into an unsold count.
| Homes | In unit register | Registered sales |
|---|---|---|
| Studios | 51 | 48 |
| 1 bedroom | 186 | 169 |
| 2 bedrooms | 34 | 33 |
| 3 bedrooms | 17 | 16 |
Source: DLD unit register and registered off-plan sales · Data through 24 Nov 2026 · 'Sell - Pre registration' registrations include resales before completion, so the gap is a floor, not the developer's availability · Methodology v1.0 ↗
Homes without a registered sale in all Dubai off-plan projects →
By number of bedrooms
| Homes | Sales | Median price | Median AED/sqft | Median size | Median rent | Gross yield |
|---|---|---|---|---|---|---|
| 1-bedroom apartments low sample (12) | 12 | AED 921k | 1 128 | 800 sqft | — | — |
Source: Registered DLD sales and Ejari rental contracts · Data through 25 Nov 2026 · yield shown only where at least 15 rents and 15 ready-home sales support it · Methodology v1.0 ↗
Latest registered sales
| Date | Property | Registration | Size | Price | AED/sqft |
|---|---|---|---|---|---|
| 27 Oct 2026 | 1 B/R Flat | Off-plan | 835 sqft | AED 740 000 | 886 |
| 26 Oct 2026 | 1 B/R Flat | Off-plan | 799 sqft | AED 850 000 | 1 064 |
| 12 May 2026 | 1 B/R Flat | Off-plan | 799 sqft | AED 959 330 | 1 201 |
| 28 Apr 2026 | 1 B/R Flat | Off-plan | 742 sqft | AED 739 000 | 996 |
| 25 Mar 2026 | 1 B/R Flat | Off-plan | 673 sqft | AED 665 000 | 989 |
| 10 Mar 2026 | 1 B/R Flat | Off-plan | 800 sqft | AED 931 200 | 1 163 |
| 4 Mar 2026 | 1 B/R Flat | Off-plan | 802 sqft | AED 973 170 | 1 214 |
| 13 Feb 2026 | 1 B/R Flat | Off-plan | 813 sqft | AED 753 000 | 926 |
| 10 Feb 2026 | 1 B/R Flat | Off-plan | 835 sqft | AED 916 650 | 1 098 |
| 2 Feb 2026 | 1 B/R Flat | Off-plan | 787 sqft | AED 925 900 | 1 176 |
| 5 Jan 2026 | 1 B/R Flat | Off-plan | 799 sqft | AED 931 410 | 1 166 |
| 12 Dec 2025 | 1 B/R Flat | Off-plan | 802 sqft | AED 928 855 | 1 158 |
Source: Registered DLD transactions · Data through 25 Nov 2026 · individual registrations, shown exactly as recorded, without trimming · Methodology v1.0 ↗
Every registration, on request
The full DLD record for Time 3: every registered sale, mortgage and gift. It loads only when you ask; filter, sort and download it as CSV.
Registered sales by year
registered sales per calendar year; the current year is incomplete
By month
registered sales per month, Jul 2025 – Jun 2026
| Year | Sales | Median price | Median AED/sqft | Total registered value |
|---|---|---|---|---|
| 2026 | 11 | AED 917k | 1 098 | AED 9.38M |
| 2025 | 102 | AED 827k | 1 027 | AED 86.02M |
| 2024 | 153 | AED 753k | 972 | AED 116.38M |
Source: Registered DLD transactions · Data through 25 Nov 2026 · calendar years; the current year is partial · Methodology v1.0 ↗
Price and sales, month by month
| Month | Sales | Median price | Median AED/sqft | IQR AED/sqft |
|---|---|---|---|---|
| Jun 2025 | 17 | AED 1.15M | 1 007 | 981 – 1 082 |
| May 2025 | 6 | AED 720k | — | — |
| Apr 2025 | 8 | AED 1.01M | 994 | 988 – 1 007 |
| Mar 2025 | 5 | AED 791k | 997 | 992 – 1 016 |
| Feb 2025 | 22 | AED 789k | 1 022 | 975 – 1 077 |
| Jan 2025 | 32 | AED 772k | 1 012 | 963 – 1 246 |
| Dec 2024 | 45 | AED 764k | 987 | 949 – 1 011 |
| Nov 2024 | 57 | AED 750k | 974 | 929 – 1 043 |
| Oct 2024 | 46 | AED 740k | 961 | 927 – 1 048 |
Source: Registered DLD transactions · Data through 25 Nov 2026 · complete months only; the current month is excluded because DLD keeps registering it · Methodology v1.0 ↗
What these numbers do not show
- Prices from the developer. Nothing here is a price list, a payment plan or availability — these are transactions already registered with DLD.
- Whether construction is moving. The completion percentage is the figure recorded at the last technical inspection, and inspections are irregular: an unchanged number does not mean work stopped.
- A handover promise. The declared completion date is a registry field, not a commitment.
- A reliable price. Only 12 sales registered in the last 12 months here.
- Asking prices. Everything here is a registered transaction; what a home was listed at is a different number.
- Off-market and cash-equivalent deals that never reach the registry, and the price actually negotiated before registration.
- Service charges, chiller fees, agency commission, DLD transfer fees or mortgage costs — none of them are inside these prices.
Where this project sits
More projects in Dubai Land Residence Complex
Questions about Time 3
Who is the developer of Time 3?
The Dubai Land Department project registry lists Time Properties as the developer of Time 3.
Is Time 3 completed?
The DLD registry status of Time 3 is Active, 47% complete at the last DLD inspection. The declared completion date in the registry is 1 Aug 2027 — a registry date, not a handover promise.
How many homes are in Time 3?
The DLD registry records 288 units in Time 3. The split by number of bedrooms is in the unit register table on this page.
What is the price per square foot in Time 3?
Over the last 12 complete months the median registered sale in Time 3 was AED 921k, or AED 1 128 per sqft, from 12 registered sales. These are DLD registrations, not asking prices.
Who holds the escrow account for Time 3?
The escrow agent recorded by DLD for Time 3 is Emirates Islamic Bank P.J.S.C..
Where is Time 3?
Time 3 is in the Dubai Land Residence Complex community.
Where does this data come from?
From Dubai Land Department open data — the project registry, unit register and registered sales — rebuilt every night. Data through 25 Nov 2026.
Source: DLD project registry, unit register and registered sales · Data through 25 Nov 2026 · answers built from registry fields · Methodology v1.0 ↗
Put this project on your website
Paste this code into any page to show the price-per-sqft chart and the latest registered sales for Time 3. It updates every night by itself and always carries the source line and a link back here — that link is the only condition of reuse. Preview · data API and other embeds.