Tomorrow Commercial Tower
Data through 22 Oct 2026 · DLD project registry and registered sales · trailing 12 months Oct 2025 – Sep 2026 · rebuilt daily
Tomorrow Commercial Tower is a project by Tomorrow World Real Estate Development L.L.C, recorded at 70% complete at its last Dubai Land Department inspection. 106 sales registered in the trailing 12 months at a median AED 1.81M. Registry facts come from DLD; prices are registered transactions, not asking prices.
Source: Registered DLD transactions · Data through 22 Oct 2026 · sample 106 records · outlier-trimmed median, complete months only · Methodology v1.0 ↗
What the DLD registry says about this project
| Field | Value | Provenance |
|---|---|---|
| Developer | Tomorrow World Real Estate Development L.L.C | DLD verified |
| Status | Active | DLD verified |
| Construction progress | 70% — at the last DLD inspection | DLD verified |
| Registered with DLD | 7 Aug 2025 | DLD verified |
| Construction started | 1 Oct 2024 | DLD verified |
| Declared completion | 31 Jul 2026 — registry date, not a handover promise | DLD verified |
| Units in the project | 133 | DLD verified |
| Project area | 16 645 sqm | DLD verified |
| Escrow agent | Abu Dhabi Islamic Bank | DLD verified |
| Project number | 3605 | DLD verified |
Source: DLD project registry (Mashrooi) · Data through 22 Oct 2026 · registry fields as recorded, not developer marketing · Methodology v1.0 ↗
Price per square foot, month by month
No month in this window reached the five registered sales a median needs, so there is nothing to plot.
Source: Registered DLD transactions · Data through 22 Oct 2026 · monthly medians, months with fewer than 5 registered sales are left blank · Methodology v1.0 ↗
Construction, inspection by inspection
The DLD registry holds 6 technical inspections for this project, from 16 Jun 2025 at 7.3% to 1 Oct 2026 at 70.0%. Over the inspections since 16 Jun 2025 it moved 4.04 percentage points a month. Inspections are irregular and the percentage is what was recorded at each one, not a live measure of the site.
each dot is one DLD technical inspection; the line between two of them is drawn, not measured; the dashed mark is the completion date declared in the registry
| Inspection | Recorded | Change |
|---|---|---|
| 1 Oct 2026 | 70.0% | +36.8 pp |
| 15 Apr 2026 | 33.2% | +0.0 pp |
| 15 Apr 2026 | 33.2% | +10.6 pp |
| 21 Jan 2026 | 22.6% | +6.6 pp |
| 3 Nov 2025 | 16.0% | +8.7 pp |
| 16 Jun 2025 | 7.3% | — |
Source: DLD project registry (Mashrooi) — technical inspections · Data through 22 Oct 2026 · percentage as recorded at each inspection; inspections are irregular, and an unchanged value means no new inspection, not that work stopped · Methodology v1.0 ↗
Registered sales by year
median interquartile range (middle 50% of transactions)
| Year | Sales | Median price | Median AED/sqft | Total registered value |
|---|---|---|---|---|
| 2026 | 50 | AED 1.93M | — | AED 102.65M |
| 2025 | 58 | AED 1.74M | — | AED 115.09M |
Source: Registered DLD transactions · Data through 22 Oct 2026 · calendar years; the current year is partial · Methodology v1.0 ↗
Latest registered sales
| Date | Property | Registration | Size | Price | AED/sqft |
|---|---|---|---|---|---|
| 28 Sep 2026 | Office — Tomorrow Commercial Tower | Off-plan | 1 053 sqft | AED 1 650 000 | — |
| 26 Aug 2026 | Office — Tomorrow Commercial Tower | Off-plan | 2 247 sqft | AED 3 070 000 | — |
| 25 Aug 2026 | Office — Tomorrow Commercial Tower | Off-plan | 1 505 sqft | AED 1 800 000 | — |
| 24 Aug 2026 | Office — Tomorrow Commercial Tower | Off-plan | 1 053 sqft | AED 2 090 000 | — |
| 27 Jul 2026 | Office — Tomorrow Commercial Tower | Off-plan | 1 131 sqft | AED 1 663 550 | — |
| 16 Jul 2026 | Office — Tomorrow Commercial Tower | Off-plan | 1 505 sqft | AED 2 704 000 | — |
| 15 Jul 2026 | Office — Tomorrow Commercial Tower | Off-plan | 1 184 sqft | AED 2 046 000 | — |
| 14 Jul 2026 | Office — Tomorrow Commercial Tower | Off-plan | 1 184 sqft | AED 1 610 000 | — |
| 14 Jul 2026 | Office — Tomorrow Commercial Tower | Off-plan | 1 507 sqft | AED 2 170 000 | — |
| 14 Jul 2026 | Office — Tomorrow Commercial Tower | Off-plan | 1 271 sqft | AED 1 720 000 | — |
| 8 Jul 2026 | Office — Tomorrow Commercial Tower | Off-plan | 1 505 sqft | AED 2 130 000 | — |
| 7 Jul 2026 | Office — Tomorrow Commercial Tower | Off-plan | 1 253 sqft | AED 1 700 000 | — |
Source: Registered DLD transactions · Data through 22 Oct 2026 · individual registrations, shown exactly as recorded, without trimming · Methodology v1.0 ↗
What these numbers do not show
- Prices from the developer. Nothing here is a price list, a payment plan or availability — these are transactions already registered with DLD.
- Whether construction is moving. The completion percentage is the figure recorded at the last technical inspection, and inspections are irregular: an unchanged number does not mean work stopped.
- A handover promise. The declared completion date is a registry field, not a commitment.
- Asking prices. Everything here is a registered transaction; what a home was listed at is a different number.
- Off-market and cash-equivalent deals that never reach the registry, and the price actually negotiated before registration.
- Service charges, chiller fees, agency commission, DLD transfer fees or mortgage costs — none of them are inside these prices.
Where this project sits
More projects in International City Phase 1
For AI agents and researchers
Machine-readable mirrors of this page: Markdown · JSON · llms.txt. How to cite: “Tomorrow Commercial Tower — Dubai Data, Continental Club Property, data through 22 Oct 2026, https://datadubai.ae/projects/tomorrow-commercial-tower/”. Reuse is permitted with attribution.
Put this project on your website
Paste this code into any page to show the price-per-sqft chart and the latest registered sales for Tomorrow Commercial Tower. It updates every night by itself and always carries the source line and a link back here — that link is the only condition of reuse. Preview · data API and other embeds.