Trinity By Karma is a project by Karma Realty Developers L.L.C, recorded at 31% complete at its last Dubai Land Department inspection. 19 sales registered in the trailing 12 months at a median AED 1.44M (1 362 AED per square foot). Registry facts come from DLD; prices are registered transactions, not asking prices.
Source: Registered DLD transactions · Data through 24 Nov 2026 · sample 19 records · outlier-trimmed median, complete months only · Methodology v1.0 ↗
What the DLD registry says about this project
| Field | Value |
|---|---|
| Developer | Karma Realty Developers L.L.C |
| Status | Active |
| Construction progress | 31% — at the last DLD inspection |
| Registered with DLD | 8 Mar 2024 |
| Construction started | 1 Jul 2024 |
| Declared completion | 1 Dec 2026 — registry date, not a handover promise |
| Units in the project | 309 |
| Project area | 29 244 sqm |
| Escrow agent | First Abu Dhabi Bank P.J.S.C. |
| Project number | 2933 |
Source: DLD project registry (Mashrooi) · Data through 24 Nov 2026 · registry fields as recorded, not developer marketing · Methodology v1.0 ↗
Price per square foot, month by month
median interquartile range (middle 50% of transactions)
Source: Registered DLD transactions · Data through 24 Nov 2026 · monthly medians, months with fewer than 5 registered sales are left blank; the line stops at Apr 2026: in the 6 months since, no month reached the five registered sales a median needs (4 in total) · Methodology v1.0 ↗
Construction, inspection by inspection
The DLD registry holds 7 technical inspections for this project, from 22 Jan 2024 at 0.0% to 30 Sep 2026 at 30.9%. Over the inspections since 2 Sep 2025 it moved 1.33 percentage points a month. Inspections are irregular and the percentage is what was recorded at each one, not a live measure of the site.
each dot is one DLD technical inspection; the line between two of them is drawn, not measured; the dashed mark is the completion date declared in the registry
| Inspection | Recorded | Change |
|---|---|---|
| 30 Sep 2026 | 30.9% | +8.6 pp |
| 6 May 2026 | 22.2% | +4.3 pp |
| 6 Jan 2026 | 17.9% | +4.2 pp |
| 2 Sep 2025 | 13.7% | +12.1 pp |
| 13 Mar 2025 | 1.6% | +1.6 pp |
| 12 Nov 2024 | 0.0% | +0.0 pp |
| 22 Jan 2024 | 0.0% | — |
Source: DLD project registry (Mashrooi) — technical inspections · Data through 24 Nov 2026 · percentage as recorded at each inspection; inspections are irregular, and an unchanged value means no new inspection, not that work stopped · Methodology v1.0 ↗
Homes and registered off-plan sales
Off-plan sale registrations in Trinity By Karma (302) already equal 98% of the 309 homes in the DLD unit register, as of 23 Nov 2026. Few homes, if any, are left without a registered sale — the count includes resales, so a small number may still be unsold.
| Homes | In unit register | Registered sales |
|---|---|---|
| 1 bedroom | 236 | 238 |
| 2 bedrooms | 66 | 59 |
| 3 bedrooms | 7 | 5 |
Source: DLD unit register and registered off-plan sales · Data through 23 Nov 2026 · 'Sell - Pre registration' registrations include resales before completion, so the gap is a floor, not the developer's availability · Methodology v1.0 ↗
Homes without a registered sale in all Dubai off-plan projects →
By number of bedrooms
| Homes | Sales | Median price | Median AED/sqft | Median size | Median rent | Gross yield |
|---|---|---|---|---|---|---|
| 1-bedroom apartments low sample (10) | 10 | AED 1.11M | 1 382 | 777 sqft | — | — |
| 2-bedroom apartments low sample (9) | 9 | AED 2.00M | 1 203 | 1 705 sqft | — | — |
Source: Registered DLD sales and Ejari rental contracts · Data through 24 Nov 2026 · yield shown only where at least 15 rents and 15 ready-home sales support it · Methodology v1.0 ↗
Latest registered sales
| Date | Property | Registration | Size | Price | AED/sqft |
|---|---|---|---|---|---|
| 11 Jun 2026 | 2 B/R Flat | Off-plan | 1 713 sqft | AED 1 892 803 | 1 105 |
| 11 Jun 2026 | 2 B/R Flat | Off-plan | 1 263 sqft | AED 1 783 488 | 1 412 |
| 11 Jun 2026 | 2 B/R Flat | Off-plan | 2 008 sqft | AED 2 218 700 | 1 105 |
| 1 Jun 2026 | 2 B/R Flat | Off-plan | 1 705 sqft | AED 2 051 446 | 1 203 |
| 27 Apr 2026 | 1 B/R Flat | Off-plan | 751 sqft | AED 1 112 535 | 1 481 |
| 23 Apr 2026 | 2 B/R Flat | Off-plan | 1 735 sqft | AED 2 000 017 | 1 153 |
| 20 Apr 2026 | 2 B/R Flat | Off-plan | 1 069 sqft | AED 1 716 860 | 1 605 |
| 2 Apr 2026 | 1 B/R Flat | Off-plan | 762 sqft | AED 1 037 106 | 1 362 |
| 2 Apr 2026 | 1 B/R Flat | Off-plan | 775 sqft | AED 1 082 285 | 1 396 |
| 9 Feb 2026 | 2 B/R Flat | Off-plan | 1 817 sqft | AED 2 105 719 | 1 159 |
| 22 Jan 2026 | 1 B/R Flat | Off-plan | 779 sqft | AED 1 086 444 | 1 394 |
| 22 Jan 2026 | 1 B/R Flat | Off-plan | 809 sqft | AED 1 103 805 | 1 364 |
| 22 Jan 2026 | 1 B/R Flat | Off-plan | 859 sqft | AED 1 176 832 | 1 369 |
| 31 Dec 2025 | 2 B/R Flat | Off-plan | 1 585 sqft | AED 2 070 575 | 1 307 |
| 24 Dec 2025 | 1 B/R Flat | Off-plan | 772 sqft | AED 1 170 000 | 1 515 |
| 9 Dec 2025 | 1 B/R Flat | Off-plan | 785 sqft | AED 1 147 025 | 1 461 |
| 24 Nov 2025 | 1 B/R Flat | Off-plan | 772 sqft | AED 1 043 000 | 1 351 |
| 21 Nov 2025 | 2 B/R Flat | Off-plan | 1 556 sqft | AED 2 000 000 | 1 285 |
| 20 Nov 2025 | 1 B/R Flat | Off-plan | 1 181 sqft | AED 1 444 356 | 1 223 |
Source: Registered DLD transactions · Data through 24 Nov 2026 · individual registrations, shown exactly as recorded, without trimming · Methodology v1.0 ↗
Every registration, on request
The full DLD record for Trinity By Karma: every registered sale, mortgage and gift. It loads only when you ask; filter, sort and download it as CSV.
Registered sales by year
registered sales per calendar year; the current year is incomplete
By month
registered sales per month, Nov 2025 – Oct 2026
| Year | Sales | Median price | Median AED/sqft | Total registered value |
|---|---|---|---|---|
| 2026 | 13 | AED 1.72M | 1 364 | AED 20.37M |
| 2025 | 44 | AED 1.40M | 1 307 | AED 66.78M |
| 2024 | 245 | AED 1.17M | 1 333 | AED 302.94M |
| 2023 | 1 | — | — | AED 16.37M |
Source: Registered DLD transactions · Data through 24 Nov 2026 · calendar years; the current year is partial · Methodology v1.0 ↗
Price and sales, month by month
| Month | Sales | Median price | Median AED/sqft | IQR AED/sqft |
|---|---|---|---|---|
| Apr 2026 | 5 | AED 1.11M | 1 396 | 1 362 – 1 481 |
| Mar 2026 | 0 | — | — | — |
| Feb 2026 | 1 | — | — | — |
| Jan 2026 | 3 | — | — | — |
| Dec 2025 | 3 | — | — | — |
| Nov 2025 | 3 | — | — | — |
| Oct 2025 | 1 | — | — | — |
| Sep 2025 | 0 | — | — | — |
| Aug 2025 | 2 | — | — | — |
| Jul 2025 | 0 | — | — | — |
| Jun 2025 | 2 | — | — | — |
| May 2025 | 4 | — | — | — |
| Apr 2025 | 9 | AED 1.30M | 1 335 | 1 159 – 1 526 |
Source: Registered DLD transactions · Data through 24 Nov 2026 · complete months only; the current month is excluded because DLD keeps registering it · Methodology v1.0 ↗
What these numbers do not show
- Prices from the developer. Nothing here is a price list, a payment plan or availability — these are transactions already registered with DLD.
- Whether construction is moving. The completion percentage is the figure recorded at the last technical inspection, and inspections are irregular: an unchanged number does not mean work stopped.
- A handover promise. The declared completion date is a registry field, not a commitment.
- A reliable price. Only 19 sales registered in the last 12 months here.
- Asking prices. Everything here is a registered transaction; what a home was listed at is a different number.
- Off-market and cash-equivalent deals that never reach the registry, and the price actually negotiated before registration.
- Service charges, chiller fees, agency commission, DLD transfer fees or mortgage costs — none of them are inside these prices.
Where this project sits
More projects in Arjan
Questions about Trinity By Karma
Who is the developer of Trinity By Karma?
The Dubai Land Department project registry lists Karma Realty Developers L.L.C as the developer of Trinity By Karma.
Is Trinity By Karma completed?
The DLD registry status of Trinity By Karma is Active, 31% complete at the last DLD inspection. The declared completion date in the registry is 1 Dec 2026 — a registry date, not a handover promise.
How many homes are in Trinity By Karma?
The DLD registry records 309 units in Trinity By Karma. The split by number of bedrooms is in the unit register table on this page.
What is the price per square foot in Trinity By Karma?
Over the last 12 complete months the median registered sale in Trinity By Karma was AED 1.44M, or AED 1 362 per sqft, from 19 registered sales. These are DLD registrations, not asking prices.
Who holds the escrow account for Trinity By Karma?
The escrow agent recorded by DLD for Trinity By Karma is First Abu Dhabi Bank P.J.S.C..
Where is Trinity By Karma?
Trinity By Karma is in the Arjan community.
Where does this data come from?
From Dubai Land Department open data — the project registry, unit register and registered sales — rebuilt every night. Data through 24 Nov 2026.
Source: DLD project registry, unit register and registered sales · Data through 24 Nov 2026 · answers built from registry fields · Methodology v1.0 ↗
Put this project on your website
Paste this code into any page to show the price-per-sqft chart and the latest registered sales for Trinity By Karma. It updates every night by itself and always carries the source line and a link back here — that link is the only condition of reuse. Preview · data API and other embeds.