DubaiData

Address Harbour Point

Data through 22 Oct 2026 · DLD project registry and registered sales · trailing 12 months Oct 2025 – Sep 2026 · rebuilt daily

Address Harbour Point is a project by The Lagoons Phase One L.L.C, recorded at 100% complete at its last Dubai Land Department inspection. 63 sales registered in the trailing 12 months at a median AED 3.90M (3 516 AED per square foot). Registry facts come from DLD; prices are registered transactions, not asking prices.

Median sale price
AED 3.90M -1.3%
IQR AED 3.00M – AED 4.78M
DLD verified
Median price per sqft
AED 3 516/sqft +0.8%
IQR 3 112 – 3 938 AED/sqft
DLD verified
Registered sales
63 -45.2%
all property types · trailing 12 complete months
DLD verified
Off-plan share
0.0%
of registered sales in the window
DLD verified

Source: Registered DLD transactions · Data through 22 Oct 2026 · sample 63 records · outlier-trimmed median, complete months only · Methodology v1.0 ↗

What the DLD registry says about this project

FieldValueProvenance
DeveloperThe Lagoons Phase One L.L.C DLD verified
StatusFinished DLD verified
Construction progress100% — at the last DLD inspection DLD verified
Registered with DLD19 Mar 2017 DLD verified
Construction started1 Jun 2017 DLD verified
Declared completion12 Jan 2023 — registry date, not a handover promise DLD verified
Units in the project814 DLD verified
Project area131 330 sqm DLD verified
Escrow agentEmirates Nbd Bank (P.J.S.C) DLD verified
Project number1870 DLD verified

Source: DLD project registry (Mashrooi) · Data through 22 Oct 2026 · registry fields as recorded, not developer marketing · Methodology v1.0 ↗

Price per square foot, month by month

2 0003 0004 000Oct 2021May 2022Dec 2022Jul 2023Feb 2024Sep 2024Apr 2025Nov 2025Jun 2026

median   interquartile range (middle 50% of transactions)

Source: Registered DLD transactions · Data through 22 Oct 2026 · monthly medians, months with fewer than 5 registered sales are left blank; the line stops at Feb 2026: in the 7 months since, no month reached the five registered sales a median needs (21 in total) · Methodology v1.0 ↗

Construction, inspection by inspection

The DLD registry holds 15 technical inspections for this project, from 20 Feb 2018 at 2.3% to 12 Jan 2023 at 100.0%. The last inspection recorded it complete. Inspections are irregular and the percentage is what was recorded at each one, not a live measure of the site.

0%25%50%75%100%declared 2023-01-122018-02-202023-01-12

each dot is one DLD technical inspection; the line between two of them is drawn, not measured; the dashed mark is the completion date declared in the registry

InspectionRecordedChange
12 Jan 2023100.0% +6.0 pp
19 Sep 202294.0% +4.0 pp
23 May 202290.1% +8.0 pp
29 Dec 202182.0% +6.8 pp
20 Oct 202175.2% +12.5 pp
13 Jul 202162.7% +10.9 pp
7 Apr 202151.8% +9.9 pp
30 Dec 202041.9% +8.5 pp
2 Sep 202033.4% +5.7 pp
20 May 202027.7% +7.6 pp
28 Jan 202020.1% +5.6 pp
27 Oct 201914.4% +6.0 pp
17 Jul 20198.4% +2.5 pp
26 Jun 20186.0% +3.7 pp
20 Feb 20182.3% —

Source: DLD project registry (Mashrooi) — technical inspections · Data through 22 Oct 2026 · percentage as recorded at each inspection; inspections are irregular, and an unchanged value means no new inspection, not that work stopped · Methodology v1.0 ↗

The same figures as a table

MonthSalesMedian priceMedian AED/sqftIQR AED/sqft
Feb 202610 AED 3.92M3 603 3 187 – 3 905
Jan 20267 AED 4.30M3 778 3 396 – 3 967
Dec 20255 AED 4.75M3 624 3 444 – 3 809
Nov 20259 AED 3.90M3 431 3 111 – 4 138
Oct 202511 AED 4.25M3 594 3 340 – 3 991
Sep 20253 —— —
Aug 20254 —— —
Jul 20259 AED 2.90M3 714 3 239 – 3 792
Jun 202510 AED 4.12M3 565 3 144 – 3 778
May 202513 AED 3.60M3 204 3 059 – 3 716
Apr 202511 AED 2.90M3 281 3 078 – 3 721
Mar 202510 AED 4.89M3 742 3 168 – 4 079
Feb 202510 AED 3.93M3 564 3 319 – 3 626

Source: Registered DLD transactions · Data through 22 Oct 2026 · complete months only; the current month is excluded because DLD keeps registering it · Methodology v1.0 ↗

By number of bedrooms

HomesSalesMedian priceMedian AED/sqftMedian sizeMedian rentGross yield
1-bedroom apartments low sample (17) 17AED 2.75M 3 556 781 sqft — —
2-bedroom apartments 33AED 4.10M 3 400 1 102 sqft — —
3-bedroom apartments low sample (12) 12AED 6.25M 3 607 1 590 sqft — —
4-bedroom apartments insufficient data 1— — — — —

Source: Registered DLD sales and Ejari rental contracts · Data through 22 Oct 2026 · yield shown only where at least 15 rents and 15 ready-home sales support it · Methodology v1.0 ↗

Registered sales by year

01002002017201820192020202120222023202420252026

median   interquartile range (middle 50% of transactions)

YearSalesMedian priceMedian AED/sqftTotal registered value
202638AED 3.75M 3 497AED 159.81M
2025105AED 4.00M 3 489AED 429.84M
2024148AED 3.85M 3 531AED 582.88M
2023169AED 3.15M 2 980AED 553.85M
2022137AED 2.82M 2 471AED 398.47M
2021169AED 3.47M 2 590AED 620.19M
202042AED 2.62M 2 410AED 112.73M
2019196AED 2.61M 2 492AED 518.62M
2018172AED 2.07M 2 361AED 387.89M
2017105AED 2.07M 2 413AED 234.25M

Source: Registered DLD transactions · Data through 22 Oct 2026 · calendar years; the current year is partial · Methodology v1.0 ↗

Latest registered sales

DatePropertyRegistrationSizePriceAED/sqft
23 Sep 20263 B/R Hotel Apartment — ADDRESS HARBOUR POINTReady 1 598 sqftAED 5 200 000 3 254
21 Sep 20261 B/R Hotel Apartment — ADDRESS HARBOUR POINTReady 787 sqftAED 2 450 000 3 113
17 Sep 20262 B/R Hotel Apartment — ADDRESS HARBOUR POINTReady 1 098 sqftAED 4 390 000 3 997
4 Sep 20261 B/R Hotel Apartment — ADDRESS HARBOUR POINTReady 779 sqftAED 2 200 000 2 826
19 Aug 20263 B/R Hotel Apartment — ADDRESS HARBOUR POINTReady 1 427 sqftAED 5 000 000 3 504
18 Aug 20262 B/R Hotel Apartment — ADDRESS HARBOUR POINTReady 1 078 sqftAED 3 200 000 2 968
13 Aug 20263 B/R Hotel Apartment — ADDRESS HARBOUR POINTReady 1 598 sqftAED 6 800 000 4 256
11 Aug 20264 B/R Hotel Apartment — ADDRESS HARBOUR POINTReady 3 187 sqftAED 12 800 000 4 017
27 Jul 20262 B/R Hotel Apartment — ADDRESS HARBOUR POINTReady 1 101 sqftAED 3 187 500 2 896
23 Jul 20261 B/R Hotel Apartment — ADDRESS HARBOUR POINTReady 779 sqftAED 2 000 000 2 567
20 Jul 20261 B/R Hotel Apartment — ADDRESS HARBOUR POINTReady 772 sqftAED 2 500 000 3 239
9 Jul 20263 B/R Hotel Apartment — ADDRESS HARBOUR POINTReady 1 429 sqftAED 3 200 000 2 239

Source: Registered DLD transactions · Data through 22 Oct 2026 · individual registrations, shown exactly as recorded, without trimming · Methodology v1.0 ↗

What these numbers do not show

  • Prices from the developer. Nothing here is a price list, a payment plan or availability — these are transactions already registered with DLD.
  • Whether construction is moving. The completion percentage is the figure recorded at the last technical inspection, and inspections are irregular: an unchanged number does not mean work stopped.
  • A handover promise. The declared completion date is a registry field, not a commitment.
  • Asking prices. Everything here is a registered transaction; what a home was listed at is a different number.
  • Off-market and cash-equivalent deals that never reach the registry, and the price actually negotiated before registration.
  • Service charges, chiller fees, agency commission, DLD transfer fees or mortgage costs — none of them are inside these prices.

Where this project sits

More projects in Dubai Creek Harbour

For AI agents and researchers

Machine-readable mirrors of this page: Markdown · JSON · llms.txt. How to cite: “Address Harbour Point — Dubai Data, Continental Club Property, data through 22 Oct 2026, https://datadubai.ae/projects/address-harbour-point/”. Reuse is permitted with attribution.

Put this project on your website

Paste this code into any page to show the price-per-sqft chart and the latest registered sales for Address Harbour Point. It updates every night by itself and always carries the source line and a link back here — that link is the only condition of reuse. Preview · data API and other embeds.