Aura
Data through 7 Sep 2026 · DLD project registry and registered sales · trailing 12 months Sep 2025 – Aug 2026 · rebuilt daily
Aura is a project by Majid Al Futtaim Tilal Al Ghaf Phase A L.L.C, recorded at 100% complete at its last Dubai Land Department inspection. 138 sales registered in the trailing 12 months at a median AED 5.00M (2 566 AED per square foot). Registry facts come from DLD; prices are registered transactions, not asking prices.
Source: Registered DLD transactions · Data through 7 Sep 2026 · sample 138 records · outlier-trimmed median, complete months only · Methodology v1.0 ↗
What the DLD registry says about this project
| Field | Value | Provenance |
|---|---|---|
| Developer | Majid Al Futtaim Tilal Al Ghaf Phase A L.L.C | DLD verified |
| Status | Finished | DLD verified |
| Construction progress | 100% — at the last DLD inspection | DLD verified |
| Registered with DLD | 10 Jun 2021 | DLD verified |
| Construction started | 6 Nov 2021 | DLD verified |
| Declared completion | 31 Aug 2024 — registry date, not a handover promise | DLD verified |
| Units in the project | 540 | DLD verified |
| Project area | 101 196 sqm | DLD verified |
| Escrow agent | Emirates Nbd Bank (P.J.S.C) | DLD verified |
| Project number | 2259 | DLD verified |
Source: DLD project registry (Mashrooi) · Data through 7 Sep 2026 · registry fields as recorded, not developer marketing · Methodology v1.0 ↗
Price per square foot, month by month
median interquartile range (middle 50% of transactions)
Source: Registered DLD transactions · Data through 7 Sep 2026 · monthly medians, months with fewer than 5 registered sales are left blank; the line stops at Jul 2026: in the 1 months since, no month reached the five registered sales a median needs (3 in total) · Methodology v1.0 ↗
Construction, inspection by inspection
The DLD registry holds 13 technical inspections for this project, from 14 Feb 2022 at 0.2% to 10 Oct 2025 at 100.0%. The last inspection recorded it complete. Inspections are irregular and the percentage is what was recorded at each one, not a live measure of the site.
each dot is one DLD technical inspection; the line between two of them is drawn, not measured; the dashed mark is the completion date declared in the registry
| Inspection | Recorded | Change |
|---|---|---|
| 10 Oct 2025 | 100.0% | +1.3 pp |
| 3 Jul 2025 | 98.7% | +1.6 pp |
| 1 May 2025 | 97.1% | +1.5 pp |
| 10 Mar 2025 | 95.5% | +7.4 pp |
| 25 Nov 2024 | 88.2% | +4.7 pp |
| 28 Oct 2024 | 83.5% | +15.7 pp |
| 10 Jul 2024 | 67.8% | +13.5 pp |
| 6 Mar 2024 | 54.3% | +27.8 pp |
| 21 Sep 2023 | 26.4% | +13.8 pp |
| 28 Mar 2023 | 12.7% | +8.5 pp |
| 23 Nov 2022 | 4.1% | +3.0 pp |
| 4 Jul 2022 | 1.2% | +0.9 pp |
| 14 Feb 2022 | 0.2% | — |
Source: DLD project registry (Mashrooi) — technical inspections · Data through 7 Sep 2026 · percentage as recorded at each inspection; inspections are irregular, and an unchanged value means no new inspection, not that work stopped · Methodology v1.0 ↗
The same figures as a table
| Month | Sales | Median price | Median AED/sqft | IQR AED/sqft |
|---|---|---|---|---|
| Jul 2026 | 7 | AED 4.30M | 2 426 | 2 320 – 2 646 |
| Jun 2026 | 8 | AED 4.74M | 2 507 | 2 237 – 2 643 |
| May 2026 | 5 | AED 4.14M | 2 535 | 2 448 – 2 731 |
| Apr 2026 | 10 | AED 5.25M | 2 439 | 2 249 – 2 532 |
| Mar 2026 | 13 | AED 5.30M | 2 638 | 2 441 – 2 813 |
| Feb 2026 | 13 | AED 5.20M | 2 611 | 2 474 – 2 684 |
| Jan 2026 | 7 | AED 5.00M | 2 779 | 2 585 – 2 927 |
| Dec 2025 | 21 | AED 5.00M | 2 591 | 2 436 – 2 779 |
| Nov 2025 | 12 | AED 4.28M | 2 745 | 2 630 – 2 801 |
| Oct 2025 | 23 | AED 4.97M | 2 569 | 2 373 – 2 657 |
| Sep 2025 | 15 | AED 5.00M | 2 495 | 2 415 – 2 581 |
| Aug 2025 | 3 | — | — | — |
| Jul 2025 | 11 | AED 5.85M | 2 260 | 2 097 – 2 475 |
Source: Registered DLD transactions · Data through 7 Sep 2026 · complete months only; the current month is excluded because DLD keeps registering it · Methodology v1.0 ↗
By number of bedrooms
| Homes | Sales | Median price | Median AED/sqft | Median size | Median rent | Gross yield |
|---|---|---|---|---|---|---|
| 3-bedroom apartments | 59 | AED 4.14M | 2 680 | 1 512 sqft | — | — |
| 4-bedroom apartments | 66 | AED 6.09M | 2 441 | 2 408 sqft | — | — |
| 5-bedroom apartments low sample (13) | 13 | AED 6.25M | 2 529 | 2 474 sqft | — | — |
Source: Registered DLD sales and Ejari rental contracts · Data through 7 Sep 2026 · yield shown only where at least 15 rents and 15 ready-home sales support it · Methodology v1.0 ↗
Registered sales by year
median interquartile range (middle 50% of transactions)
| Year | Sales | Median price | Median AED/sqft | Total registered value |
|---|---|---|---|---|
| 2026 | 67 | AED 5.00M | 2 564 | AED 344.90M |
| 2025 | 157 | AED 5.38M | 2 432 | AED 825.28M |
| 2024 | 121 | AED 4.10M | 1 952 | AED 487.00M |
| 2023 | 187 | AED 3.20M | 1 485 | AED 587.71M |
| 2022 | 122 | AED 2.78M | 1 221 | AED 314.86M |
| 2021 | 762 | AED 2.62M | 1 166 | AED 1.88B |
Source: Registered DLD transactions · Data through 7 Sep 2026 · calendar years; the current year is partial · Methodology v1.0 ↗
Latest registered sales
| Date | Property | Registration | Size | Price | AED/sqft |
|---|---|---|---|---|---|
| 19 Aug 2026 | 3 B/R Villa — Aura | Ready | 1 512 sqft | AED 3 940 000 | 2 607 |
| 13 Aug 2026 | 4 B/R Villa — Aura | Ready | 2 506 sqft | AED 6 200 000 | 2 474 |
| 10 Aug 2026 | 4 B/R Villa — Aura | Ready | 2 372 sqft | AED 7 550 000 | 3 183 |
| 10 Aug 2026 | 4 B/R Villa — Aura | Ready | 2 173 sqft | AED 4 840 000 | 2 227 |
| 28 Jul 2026 | 3 B/R Villa — Aura | Ready | 1 525 sqft | AED 3 700 000 | 2 426 |
| 27 Jul 2026 | 4 B/R Villa — Aura | Ready | 2 372 sqft | AED 5 500 000 | 2 319 |
| 22 Jul 2026 | 3 B/R Villa — Aura | Ready | 1 512 sqft | AED 4 000 000 | 2 646 |
| 13 Jul 2026 | 4 B/R Villa — Aura | Ready | 2 398 sqft | AED 4 999 000 | 2 084 |
| 13 Jul 2026 | 3 B/R Villa — Aura | Ready | 1 512 sqft | AED 4 000 000 | 2 646 |
| 9 Jul 2026 | 3 B/R Villa — Aura | Ready | 1 512 sqft | AED 4 300 000 | 2 845 |
| 8 Jul 2026 | 5 B/R Villa — Aura | Ready | 2 370 sqft | AED 5 500 000 | 2 321 |
| 30 Jun 2026 | 4 B/R Villa — Aura | Ready | 2 313 sqft | AED 5 300 000 | 2 291 |
Source: Registered DLD transactions · Data through 7 Sep 2026 · individual registrations, shown exactly as recorded, without trimming · Methodology v1.0 ↗
What these numbers do not show
- Prices from the developer. Nothing here is a price list, a payment plan or availability — these are transactions already registered with DLD.
- Whether construction is moving. The completion percentage is the figure recorded at the last technical inspection, and inspections are irregular: an unchanged number does not mean work stopped.
- A handover promise. The declared completion date is a registry field, not a commitment.
- Asking prices. Everything here is a registered transaction; what a home was listed at is a different number.
- Off-market and cash-equivalent deals that never reach the registry, and the price actually negotiated before registration.
- Service charges, chiller fees, agency commission, DLD transfer fees or mortgage costs — none of them are inside these prices.
Where this project sits
For AI agents and researchers
Machine-readable mirrors of this page: Markdown · JSON · llms.txt. How to cite: “Aura — Dubai Data, Continental Club Property, data through 7 Sep 2026, https://datadubai.ae/projects/aura/”. Reuse is permitted with attribution.