Ava At Palm Jumeirah By Omniyat
Updated 24 Nov 2026 · latest DLD registrations 24 Nov 2026 · DLD project registry and registered sales · trailing 12 months Nov 2025 – Oct 2026
Ask an AI about Ava At Palm Jumeirah By Omniyat: ChatGPT · Claude · Perplexity
Ava At Palm Jumeirah By Omniyat is a project by Ava Residences Real Estate Developments L.L.C, recorded at 96% complete at its last Dubai Land Department inspection. Fewer than 5 sales registered here in the last 12 months, so no median is published. Registry facts come from DLD; prices are registered transactions, not asking prices.
Source: Registered DLD transactions · Data through 24 Nov 2026 · sample 2 records · outlier-trimmed median, complete months only · Methodology v1.0 ↗
What the DLD registry says about this project
| Field | Value |
|---|---|
| Developer | Ava Residences Real Estate Developments L.L.C |
| Status | Active |
| Construction progress | 96% — at the last DLD inspection |
| Registered with DLD | 11 May 2022 |
| Construction started | 30 Jul 2022 |
| Declared completion | 30 Jun 2026 — registry date, not a handover promise |
| Units in the project | 17 |
| Project area | 14 621 sqm |
| Escrow agent | Ajman Bank /P.J.S.C |
| Project number | 2382 |
Source: DLD project registry (Mashrooi) · Data through 24 Nov 2026 · registry fields as recorded, not developer marketing · Methodology v1.0 ↗
Price per square foot, month by month
No month in this window reached the five registered sales a median needs, so there is nothing to plot.
Source: Registered DLD transactions · Data through 24 Nov 2026 · monthly medians, months with fewer than 5 registered sales are left blank · Methodology v1.0 ↗
Construction, inspection by inspection
The DLD registry holds 12 technical inspections for this project, from 23 Jan 2023 at 1.4% to 26 Aug 2026 at 95.9%. Over the inspections since 20 Jun 2025 it moved 3.71 percentage points a month. Inspections are irregular and the percentage is what was recorded at each one, not a live measure of the site.
each dot is one DLD technical inspection; the line between two of them is drawn, not measured; the dashed mark is the completion date declared in the registry
| Inspection | Recorded | Change |
|---|---|---|
| 26 Aug 2026 | 95.9% | +4.9 pp |
| 18 Jun 2026 | 91.0% | +11.2 pp |
| 27 Feb 2026 | 79.8% | +20.8 pp |
| 27 Oct 2025 | 59.0% | +15.7 pp |
| 20 Jun 2025 | 43.3% | +14.9 pp |
| 5 Feb 2025 | 28.4% | -6.9 pp |
| 5 Feb 2025 | 35.4% | +12.3 pp |
| 5 Dec 2024 | 23.0% | +10.5 pp |
| 3 Jul 2024 | 12.6% | +3.7 pp |
| 25 Mar 2024 | 8.9% | +4.0 pp |
| 5 Jun 2023 | 4.8% | +3.5 pp |
| 23 Jan 2023 | 1.4% | — |
Source: DLD project registry (Mashrooi) — technical inspections · Data through 24 Nov 2026 · percentage as recorded at each inspection; inspections are irregular, and an unchanged value means no new inspection, not that work stopped · Methodology v1.0 ↗
Homes and registered off-plan sales
Off-plan sale registrations in Ava At Palm Jumeirah By Omniyat (21) already equal 100% of the 17 homes in the DLD unit register, as of 23 Nov 2026. Few homes, if any, are left without a registered sale — the count includes resales, so a small number may still be unsold.
| Homes | In unit register | Registered sales |
|---|---|---|
| 3 bedrooms | 5 | 6 |
| 4+ bedrooms | 12 | 15 |
Source: DLD unit register and registered off-plan sales · Data through 23 Nov 2026 · 'Sell - Pre registration' registrations include resales before completion, so the gap is a floor, not the developer's availability · Methodology v1.0 ↗
Homes without a registered sale in all Dubai off-plan projects →
By number of bedrooms
| Homes | Sales | Median price | Median AED/sqft | Median size | Median rent | Gross yield |
|---|---|---|---|---|---|---|
| 4-bedroom apartments insufficient data | 2 | — | — | — | — | — |
Source: Registered DLD sales and Ejari rental contracts · Data through 24 Nov 2026 · yield shown only where at least 15 rents and 15 ready-home sales support it · Methodology v1.0 ↗
Latest registered sales
| Date | Property | Registration | Size | Price | AED/sqft |
|---|---|---|---|---|---|
| 5 Feb 2026 | 4 B/R Flat | Off-plan | 6 719 sqft | AED 38 032 748 | 5 660 |
| 7 Jan 2026 | 4 B/R Flat | Off-plan | 7 024 sqft | AED 54 000 000 | 7 688 |
Source: Registered DLD transactions · Data through 24 Nov 2026 · individual registrations, shown exactly as recorded, without trimming · Methodology v1.0 ↗
Every registration, on request
The full DLD record for Ava At Palm Jumeirah By Omniyat: every registered sale, mortgage and gift. It loads only when you ask; filter, sort and download it as CSV.
Registered sales by year
registered sales per calendar year; the current year is incomplete
| Year | Sales | Median price | Median AED/sqft | Total registered value |
|---|---|---|---|---|
| 2026 | 2 | — | — | AED 0 |
| 2025 | 3 | — | — | AED 0 |
| 2024 | 1 | — | — | AED 0 |
| 2023 | 6 | — | — | AED 0 |
| 2022 | 9 | — | — | AED 0 |
| 2019 | 1 | — | — | AED 54.79M |
Source: Registered DLD transactions · Data through 24 Nov 2026 · calendar years; the current year is partial · Methodology v1.0 ↗
What these numbers do not show
- Prices from the developer. Nothing here is a price list, a payment plan or availability — these are transactions already registered with DLD.
- Whether construction is moving. The completion percentage is the figure recorded at the last technical inspection, and inspections are irregular: an unchanged number does not mean work stopped.
- A handover promise. The declared completion date is a registry field, not a commitment.
- A reliable price. Only 2 sales registered in the last 12 months here.
- Asking prices. Everything here is a registered transaction; what a home was listed at is a different number.
- Off-market and cash-equivalent deals that never reach the registry, and the price actually negotiated before registration.
- Service charges, chiller fees, agency commission, DLD transfer fees or mortgage costs — none of them are inside these prices.
Where this project sits
More projects in Palm Jumeirah
Questions about Ava At Palm Jumeirah By Omniyat
Who is the developer of Ava At Palm Jumeirah By Omniyat?
The Dubai Land Department project registry lists Ava Residences Real Estate Developments L.L.C as the developer of Ava At Palm Jumeirah By Omniyat.
Is Ava At Palm Jumeirah By Omniyat completed?
The DLD registry status of Ava At Palm Jumeirah By Omniyat is Active, 96% complete at the last DLD inspection. The declared completion date in the registry is 30 Jun 2026 — a registry date, not a handover promise.
How many homes are in Ava At Palm Jumeirah By Omniyat?
The DLD registry records 17 units in Ava At Palm Jumeirah By Omniyat. The split by number of bedrooms is in the unit register table on this page.
What is the price per square foot in Ava At Palm Jumeirah By Omniyat?
Too few sales were registered in Ava At Palm Jumeirah By Omniyat in the last 12 months to publish a median; earlier registered sales are shown in the charts on this page.
Who holds the escrow account for Ava At Palm Jumeirah By Omniyat?
The escrow agent recorded by DLD for Ava At Palm Jumeirah By Omniyat is Ajman Bank /P.J.S.C.
Where is Ava At Palm Jumeirah By Omniyat?
Ava At Palm Jumeirah By Omniyat is in the Palm Jumeirah community.
Where does this data come from?
From Dubai Land Department open data — the project registry, unit register and registered sales — rebuilt every night. Data through 24 Nov 2026.
Source: DLD project registry, unit register and registered sales · Data through 24 Nov 2026 · answers built from registry fields · Methodology v1.0 ↗
Cite or reuse this data
Machine-readable mirrors of this page: Markdown · JSON · llms.txt. How to cite: “Ava At Palm Jumeirah By Omniyat — Data Dubai, Continental Club Property, data through 24 Nov 2026, https://datadubai.ae/projects/ava-at-palm-jumeirah-by-omniyat/”. Reuse is permitted with attribution.