Balqis Residence
Updated 24 Nov 2026 · latest DLD registrations 24 Nov 2026 · DLD project registry and registered sales · trailing 12 months Nov 2025 – Oct 2026
Ask an AI about Balqis Residence: ChatGPT · Claude · Perplexity
Balqis Residence is a project by Balqis Residence Fze, recorded at 100% complete at its last Dubai Land Department inspection. 23 sales registered in the trailing 12 months at a median AED 4.80M (2 162 AED per square foot). Registry facts come from DLD; prices are registered transactions, not asking prices.
Source: Registered DLD transactions · Data through 24 Nov 2026 · sample 23 records · outlier-trimmed median, complete months only · Methodology v1.0 ↗
What the DLD registry says about this project
| Field | Value |
|---|---|
| Developer | Balqis Residence Fze |
| Status | Finished |
| Construction progress | 100% — at the last DLD inspection |
| Registered with DLD | 8 Nov 2008 |
| Construction started | 29 Jun 2008 |
| Declared completion | 30 Oct 2019 — registry date, not a handover promise |
| Units in the project | 398 |
| Project area | 163 564 sqm |
| Escrow agent | Dubai Islamic Bank (Public Joint Stock Company) |
| Project number | 611 |
Source: DLD project registry (Mashrooi) · Data through 24 Nov 2026 · registry fields as recorded, not developer marketing · Methodology v1.0 ↗
Price per square foot, month by month
median interquartile range (middle 50% of transactions)
Source: Registered DLD transactions · Data through 24 Nov 2026 · monthly medians, months with fewer than 5 registered sales are left blank; the line stops at Nov 2025: in the 11 months since, no month reached the five registered sales a median needs (14 in total) · Methodology v1.0 ↗
Construction, inspection by inspection
The DLD registry holds 14 technical inspections for this project, from 25 Sep 2012 at 76.6% to 30 Oct 2019 at 100.0%. The last inspection recorded it complete. Inspections are irregular and the percentage is what was recorded at each one, not a live measure of the site.
each dot is one DLD technical inspection; the line between two of them is drawn, not measured; the dashed mark is the completion date declared in the registry
| Inspection | Recorded | Change |
|---|---|---|
| 30 Oct 2019 | 100.0% | +2.8 pp |
| 1 Jul 2019 | 97.2% | +1.1 pp |
| 4 Feb 2019 | 96.1% | +0.0 pp |
| 4 Feb 2019 | 96.1% | +0.5 pp |
| 24 Sep 2018 | 95.7% | +0.6 pp |
| 13 Feb 2018 | 95.1% | +2.0 pp |
| 20 Sep 2017 | 93.1% | +2.1 pp |
| 13 Feb 2017 | 91.0% | +4.7 pp |
| 3 Oct 2016 | 86.3% | +1.3 pp |
| 3 Sep 2015 | 85.0% | +3.9 pp |
| 3 Mar 2015 | 81.1% | +4.5 pp |
| 1 Oct 2014 | 76.6% | +0.0 pp |
| 12 Feb 2014 | 76.6% | +0.0 pp |
| 25 Sep 2012 | 76.6% | — |
Source: DLD project registry (Mashrooi) — technical inspections · Data through 24 Nov 2026 · percentage as recorded at each inspection; inspections are irregular, and an unchanged value means no new inspection, not that work stopped · Methodology v1.0 ↗
By number of bedrooms
| Homes | Sales | Median price | Median AED/sqft | Median size | Median rent | Gross yield |
|---|---|---|---|---|---|---|
| Studios insufficient data | 2 | — | — | — | — | — |
| 1-bedroom apartments insufficient data | 2 | — | — | — | — | — |
| 2-bedroom apartments low sample (9) | 9 | AED 4.90M | 2 162 | 2 098 sqft | — | — |
| 3-bedroom apartments insufficient data | 4 | — | — | — | — | — |
| 4-bedroom apartments insufficient data | 1 | — | — | — | — | — |
| 5-bedroom apartments insufficient data | 4 | — | — | — | — | — |
Source: Registered DLD sales and Ejari rental contracts · Data through 24 Nov 2026 · yield shown only where at least 15 rents and 15 ready-home sales support it · Methodology v1.0 ↗
Latest registered sales
| Date | Property | Registration | Size | Price | AED/sqft |
|---|---|---|---|---|---|
| 9 Nov 2026 | 2 B/R Flat — 1 | Ready | 2 009 sqft | AED 4 400 000 | 2 190 |
| 26 Oct 2026 | 2 B/R Flat — 2 | Ready | 1 957 sqft | AED 6 450 000 | 3 296 |
| 26 Oct 2026 | 5 B/R Flat — Beach Villas | Ready | 13 913 sqft | AED 55 000 000 | 3 953 |
| 20 Oct 2026 | 2 B/R Flat — 3 | Ready | 2 147 sqft | AED 3 754 844 | 1 749 |
| 22 Sep 2026 | 2 B/R Hotel Apartment — 3 | Ready | 2 070 sqft | AED 3 111 726 | 1 503 |
| 11 Sep 2026 | 2 B/R Flat — 2 | Ready | 3 728 sqft | AED 6 222 800 | 1 669 |
| 26 Aug 2026 | 3 B/R Flat — 2 | Ready | 2 367 sqft | AED 4 999 900 | 2 113 |
| 14 May 2026 | 3 B/R Flat — 1 | Ready | 4 918 sqft | AED 16 825 000 | 3 421 |
| 24 Feb 2026 | 2 B/R Flat — 2 | Ready | 3 728 sqft | AED 6 430 265 | 1 725 |
| 18 Feb 2026 | 3 B/R Flat — 1 | Ready | 2 283 sqft | AED 5 850 000 | 2 563 |
| 16 Feb 2026 | 2 B/R Flat — 2 | Ready | 2 267 sqft | AED 4 900 000 | 2 162 |
| 6 Feb 2026 | 6 B/R Flat — 1 | Ready | 17 359 sqft | AED 34 000 000 | 1 959 |
| 26 Jan 2026 | 5 B/R Flat — Beach Villas | Ready | 13 913 sqft | AED 25 700 000 | 1 847 |
| 8 Dec 2025 | 5 B/R Flat — Garden Villas | Ready | 13 968 sqft | AED 28 300 000 | 2 026 |
| 4 Dec 2025 | 2 B/R Flat — 2 | Ready | 1 965 sqft | AED 4 700 000 | 2 392 |
| 27 Nov 2025 | 2 B/R Flat — 2 | Ready | 1 922 sqft | AED 4 550 000 | 2 368 |
| 25 Nov 2025 | 2 B/R Flat — 1 | Ready | 2 098 sqft | AED 6 500 000 | 3 098 |
| 24 Nov 2025 | 5 B/R Flat — Beach Villas | Ready | 13 913 sqft | AED 32 700 000 | 2 350 |
| 17 Nov 2025 | Studio Hotel Apartment — 3 | Ready | 659 sqft | AED 1 098 982 | 1 668 |
| 17 Nov 2025 | 1 B/R Hotel Apartment — 3 | Ready | 1 260 sqft | AED 2 101 018 | 1 668 |
| 17 Nov 2025 | Studio Hotel Apartment — 3 | Ready | 703 sqft | AED 1 780 000 | 2 533 |
| 14 Nov 2025 | 3 B/R Flat — 3 | Ready | 2 433 sqft | AED 6 180 000 | 2 541 |
| 12 Nov 2025 | 4 B/R Flat — 1 | Ready | 3 361 sqft | AED 9 150 000 | 2 722 |
| 4 Nov 2025 | 1 B/R Hotel Apartment — 3 | Ready | 1 045 sqft | AED 1 283 570 | 1 228 |
Source: Registered DLD transactions · Data through 24 Nov 2026 · individual registrations, shown exactly as recorded, without trimming · Methodology v1.0 ↗
Every registration, on request
The full DLD record for Balqis Residence: every registered sale, mortgage and gift, and every Ejari rent contract. It loads only when you ask; filter, sort and download it as CSV.
Registered sales by year
registered sales per calendar year; the current year is incomplete
By month
registered sales per month, Nov 2025 – Oct 2026
| Year | Sales | Median price | Median AED/sqft | Total registered value |
|---|---|---|---|---|
| 2026 | 12 | AED 5.42M | 2 036 | AED 41.72M |
| 2025 | 38 | AED 4.26M | 2 147 | AED 98.64M |
| 2024 | 47 | AED 3.65M | 1 801 | AED 126.74M |
| 2023 | 70 | AED 2.86M | 1 800 | AED 168.47M |
| 2022 | 87 | AED 2.85M | 1 549 | AED 215.23M |
| 2021 | 61 | AED 2.33M | 1 038 | AED 117.59M |
| 2020 | 29 | AED 1.95M | 888 | AED 57.11M |
| 2019 | 14 | AED 1.84M | 922 | AED 28.31M |
| 2018 | 1 | — | — | AED 4.20M |
| 2016 | 13 | AED 3.90M | 1 792 | AED 50.63M |
| 2015 | 5 | — | 1 750 | AED 14.98M |
| 2014 | 13 | AED 3.31M | 1 875 | AED 31.94M |
Source: Registered DLD transactions · Data through 24 Nov 2026 · calendar years; the current year is partial · Methodology v1.0 ↗
Rent and gross yield by year, 2019–2026
2-bed flat: median annual rent, AED, of new and renewed Ejari contracts by start year; band = middle half of contracts
| Year | 2-bed flat | 3-bed flat | Gross yield |
|---|---|---|---|
| 2026 YTD | 210k | 272k | — |
| 2025 | 220k | 300k | 5.12% |
| 2024 | 220k | 270k | — |
| 2023 | 204k | 250k | 6.49% |
| 2022 | 150k | 165k | 5.13% |
| 2021 | 120k | 150k | 6.43% |
| 2020 | 113k | 144k | — |
| 2019 | 120k | 150k | — |
Source: Ejari rental contracts and registered DLD sales · Data through 24 Nov 2026 · median annual rent per year a contract starts, shown from 15 contracts; yield = median rent ÷ median ready-home price of the same year and home type, from 15 of each · Methodology v1.0 ↗
Price and sales, month by month
| Month | Sales | Median price | Median AED/sqft | IQR AED/sqft |
|---|---|---|---|---|
| Nov 2025 | 7 | AED 2.10M | 2 368 | 1 668 – 2 541 |
| Oct 2025 | 4 | — | 2 147 | 1 766 – 2 223 |
| Sep 2025 | 2 | — | — | — |
| Aug 2025 | 1 | — | — | — |
| Jul 2025 | 0 | — | — | — |
| Jun 2025 | 3 | — | — | — |
| May 2025 | 1 | — | — | — |
| Apr 2025 | 4 | — | 1 812 | 1 701 – 2 363 |
| Mar 2025 | 1 | — | — | — |
| Feb 2025 | 1 | — | — | — |
| Jan 2025 | 0 | — | — | — |
| Dec 2024 | 3 | — | — | — |
| Nov 2024 | 1 | — | — | — |
Source: Registered DLD transactions · Data through 24 Nov 2026 · complete months only; the current month is excluded because DLD keeps registering it · Methodology v1.0 ↗
Buildings in this project
| Building (DLD name) | Sales | Median price | Median AED/sqft | Off-plan |
|---|---|---|---|---|
| Balqis Residence 3 low sample (7) | 7 | AED 2.10M | 1 668 | 0.0% |
| Balqis Residence 2 low sample (7) | 7 | AED 5.00M | 2 162 | 0.0% |
| Balqis Residence 1 low sample (5) | 5 | — | 2 722 | 0.0% |
| Balqis Residence - Beach Villas insufficient data | 3 | — | — | 0.0% |
| Balqis Residence - Garden Villas insufficient data | 1 | — | — | 0.0% |
Source: Registered DLD transactions · Data through 24 Nov 2026 · outlier-trimmed median, complete months only · Methodology v1.0 ↗
What these numbers do not show
- Prices from the developer. Nothing here is a price list, a payment plan or availability — these are transactions already registered with DLD.
- Whether construction is moving. The completion percentage is the figure recorded at the last technical inspection, and inspections are irregular: an unchanged number does not mean work stopped.
- A handover promise. The declared completion date is a registry field, not a commitment.
- Asking prices. Everything here is a registered transaction; what a home was listed at is a different number.
- Off-market and cash-equivalent deals that never reach the registry, and the price actually negotiated before registration.
- Service charges, chiller fees, agency commission, DLD transfer fees or mortgage costs — none of them are inside these prices.
Nearby projects
3 projects with a page on this site are registered within 1.2 km of Balqis Residence. Distance is measured between the coordinates in the DLD project registry.
| Project | Distance | Built |
|---|---|---|
| The 8 Finished · C Fourteen Fze |
500 m | 100% |
| Conrad Palm Jumeirah Cancelled · Al Iltizam Real Estate Development |
748 m | 2% |
| Emerald Palace Kempinski Finished · Sunny Beach Properties Ltd O.F |
995 m | 100% |
The map loads only when you ask for it (OpenStreetMap, no tracking).
Source: DLD project registry coordinates · Data through 24 Nov 2026 · map © OpenStreetMap contributors · Methodology v1.0 ↗
Where this project sits
More projects in Palm Jumeirah
Questions about Balqis Residence
Who is the developer of Balqis Residence?
The Dubai Land Department project registry lists Balqis Residence Fze as the developer of Balqis Residence.
Is Balqis Residence completed?
The DLD registry status of Balqis Residence is Finished, 100% complete at the last DLD inspection. The declared completion date in the registry is 30 Oct 2019 — a registry date, not a handover promise.
How many homes are in Balqis Residence?
The DLD registry records 398 units in Balqis Residence.
What is the price per square foot in Balqis Residence?
Over the last 12 complete months the median registered sale in Balqis Residence was AED 4.80M, or AED 2 162 per sqft, from 23 registered sales. These are DLD registrations, not asking prices.
Who holds the escrow account for Balqis Residence?
The escrow agent recorded by DLD for Balqis Residence is Dubai Islamic Bank (Public Joint Stock Company).
Where is Balqis Residence?
Balqis Residence is in the Palm Jumeirah community. 3 other projects with a page on this site are registered within 1.2 km; the closest is The 8, about 500 m away.
Where does this data come from?
From Dubai Land Department open data — the project registry, unit register and registered sales — rebuilt every night. Data through 24 Nov 2026.
Source: DLD project registry, unit register and registered sales · Data through 24 Nov 2026 · answers built from registry fields · Methodology v1.0 ↗