Data Dubai

Continental Tower

Continental TowerFinished100% built224 homesDLD data through 24 Nov 2026

Updated 24 Nov 2026 · latest DLD registrations 24 Nov 2026 · DLD project registry and registered sales · trailing 12 months Nov 2025 – Oct 2026

Ask an AI about Continental Tower: ChatGPT · Claude · Perplexity

Continental Tower is a project by Continental Investments Lmd L.L.C, recorded at 100% complete at its last Dubai Land Department inspection. 23 sales registered in the trailing 12 months at a median AED 2.38M (1 684 AED per square foot). Registry facts come from DLD; prices are registered transactions, not asking prices.

Median sale price
AED 2.38M +15.9% y/y
≈ US$ 647k · typical range AED 2.00M – AED 2.61M
DLD verified
Median price per sqft
AED 1 684/sqft -0.2% y/y
typical range 1 602 – 1 914 AED/sqft
DLD verified
Registered sales
23 -25.8% y/y
all property types · trailing 12 complete months
DLD verified
Off-plan share
0.0%
of registered sales in the window
DLD verified

Source: Registered DLD transactions · Data through 24 Nov 2026 · sample 23 records · outlier-trimmed median, complete months only · Methodology v1.0 ↗

What the DLD registry says about this project

FieldValue
DeveloperContinental Investments Lmd L.L.C
StatusFinished
Construction progress100% — at the last DLD inspection
Registered with DLD7 Oct 2013
Construction started9 Jun 2011
Declared completion10 Apr 2017 — registry date, not a handover promise
Units in the project224
Project area26 498 sqm
Escrow agentAbu Dhabi Commercial Bank
Project number1380

Source: DLD project registry (Mashrooi) · Data through 24 Nov 2026 · registry fields as recorded, not developer marketing · Methodology v1.0 ↗

Price per square foot, month by month

Fewer than six months reached the five registered sales a median needs — too few to draw a line that would mean anything.

Source: Registered DLD transactions · Data through 24 Nov 2026 · monthly medians, months with fewer than 5 registered sales are left blank; the line stops at Nov 2024: in the 23 months since, no month reached the five registered sales a median needs (44 in total) · Methodology v1.0 ↗

Construction, inspection by inspection

The DLD registry holds 10 technical inspections for this project, from 1 Apr 2014 at 27.7% to 8 Jun 2017 at 100.0%. The last inspection recorded it complete. Inspections are irregular and the percentage is what was recorded at each one, not a live measure of the site.

0%25%50%75%100%declared 2017-04-102014-04-012017-06-08

each dot is one DLD technical inspection; the line between two of them is drawn, not measured; the dashed mark is the completion date declared in the registry

InspectionRecordedChange
8 Jun 2017100.0% +3.0 pp
15 Jan 201797.0% +1.8 pp
20 Sep 201695.2% +3.2 pp
2 Mar 201692.0% +6.6 pp
7 Dec 201585.4% +12.1 pp
27 Aug 201573.3% +9.2 pp
7 Jun 201564.0% +10.7 pp
3 Feb 201553.3% +17.2 pp
5 Oct 201436.1% +8.4 pp
1 Apr 201427.7% —

Source: DLD project registry (Mashrooi) — technical inspections · Data through 24 Nov 2026 · percentage as recorded at each inspection; inspections are irregular, and an unchanged value means no new inspection, not that work stopped · Methodology v1.0 ↗

By number of bedrooms

HomesSalesMedian priceMedian AED/sqftMedian sizeMedian rentGross yield
1-bedroom apartments low sample (5) 5AED 1.50M 1 708 738 sqft — —
2-bedroom apartments low sample (14) 14AED 2.41M 1 689 1 307 sqft — —
3-bedroom apartments insufficient data 2— — — — —

Source: Registered DLD sales and Ejari rental contracts · Data through 24 Nov 2026 · yield shown only where at least 15 rents and 15 ready-home sales support it · Methodology v1.0 ↗

Latest registered sales

DatePropertyRegistrationSizePriceAED/sqft
17 Nov 20261 B/R FlatReady 725 sqftAED 1 400 000 1 931
8 Oct 20262 B/R FlatReady 1 231 sqftAED 2 050 000 1 665
28 Sep 20261 B/R FlatReady 967 sqftAED 1 550 000 1 602
2 Sep 20262 B/R FlatReady 1 307 sqftAED 2 000 000 1 530
26 Aug 20262 B/R FlatReady 1 306 sqftAED 2 500 000 1 914
24 Aug 20262 B/R FlatReady 1 307 sqftAED 2 510 000 1 920
11 Aug 20262 B/R FlatReady 1 307 sqftAED 2 500 000 1 913
31 Jul 20261 B/R FlatReady 1 143 sqftAED 1 750 000 1 531
20 Jul 20262 B/R FlatReady 1 306 sqftAED 2 200 000 1 684
2 Jul 20261 B/R FlatReady 725 sqftAED 1 300 000 1 793
25 Jun 20263 B/R FlatReady 1 673 sqftAED 2 625 000 1 569
9 Jun 20262 B/R FlatReady 1 605 sqftAED 2 625 000 1 635
22 May 20261 B/R FlatReady 725 sqftAED 1 500 000 2 068
21 May 20262 B/R FlatReady 1 210 sqftAED 2 050 000 1 694
8 May 20261 B/R FlatReady 738 sqftAED 1 260 000 1 708
20 Apr 20262 B/R FlatReady 1 307 sqftAED 2 600 000 1 989
5 Mar 20262 B/R FlatReady 1 227 sqftAED 2 450 000 1 996
20 Feb 20262 B/R FlatReady 1 210 sqftAED 2 000 000 1 652
16 Feb 20263 B/R FlatReady 2 868 sqftAED 4 420 000 1 541
9 Feb 2026ShopReady 2 657 sqftAED 5 500 000 —
9 Feb 2026ShopReady 2 589 sqftAED 5 300 419 —
5 Feb 20262 B/R FlatReady 1 307 sqftAED 2 200 000 1 683
19 Nov 20252 B/R FlatReady 1 227 sqftAED 2 375 000 1 935
3 Nov 20252 B/R FlatReady 1 808 sqftAED 2 800 000 1 549

Source: Registered DLD transactions · Data through 24 Nov 2026 · individual registrations, shown exactly as recorded, without trimming · Methodology v1.0 ↗

Every registration, on request

The full DLD record for Continental Tower: every registered sale, mortgage and gift, and every Ejari rent contract. It loads only when you ask; filter, sort and download it as CSV.

Registered sales by year

01020302015201620172018201920202021202220232024202520260102030201620182020202220242026

registered sales per calendar year; the current year is incomplete

By month

024DecJanFebMarAprMayJunJulAugSepOctNov024JanMarMayJulSepNov

registered sales per month, Dec 2024 – Nov 2025

YearSalesMedian priceMedian AED/sqftTotal registered value
202621AED 2.20M 1 684AED 52.89M
202527AED 2.27M 1 696AED 77.01M
202424AED 2.00M 1 587AED 47.98M
202327AED 1.53M 1 362AED 43.00M
202222AED 1.60M 1 217AED 32.70M
20217AED 950k 1 148AED 7.60M
20209AED 1.15M 956AED 11.12M
20199AED 1.60M 1 145AED 16.57M
201819AED 1.45M 1 344AED 28.26M
201721AED 1.50M 1 502AED 33.02M
201620AED 1.40M 1 439AED 48.96M
201534AED 1.92M 1 644AED 84.24M

Source: Registered DLD transactions · Data through 24 Nov 2026 · calendar years; the current year is partial · Methodology v1.0 ↗

Rent and gross yield by year, 2017–2026

80k100k120k140k201720182019202020212022202320242025202680k100k120k140k2017202020232026

2-bed flat: median annual rent, AED, of new and renewed Ejari contracts by start year; band = middle half of contracts

Median annual rent, AED thousand
Year1-bed flat2-bed flatGross yield
2026 YTD 81k116k—
2025 92k130k5.91%
2024 94k120k5.78%
2023 80k105k5.83%
2022 65k90k—
2021 56k85k—
2020 60k88k—
2019 75k108k—
2018 82k125k—
2017 95k130k—

Source: Ejari rental contracts and registered DLD sales · Data through 24 Nov 2026 · median annual rent per year a contract starts, shown from 15 contracts; yield = median rent ÷ median ready-home price of the same year and home type, from 15 of each · Methodology v1.0 ↗

Price and sales, month by month

MonthSalesMedian priceMedian AED/sqftIQR AED/sqft
Nov 20245 AED 1.88M1 678 1 556 – 1 759
Oct 20243 —— —
Sep 20241 —— —
Aug 20241 —— —
Jul 20242 —— —
Jun 20241 —— —
May 20244 —— —
Apr 20242 —— —
Mar 20240 —— —
Feb 20242 —— —
Jan 20242 —— —
Dec 20230 —— —
Nov 20231 —— —

Source: Registered DLD transactions · Data through 24 Nov 2026 · complete months only; the current month is excluded because DLD keeps registering it · Methodology v1.0 ↗

What these numbers do not show

  • Prices from the developer. Nothing here is a price list, a payment plan or availability — these are transactions already registered with DLD.
  • Whether construction is moving. The completion percentage is the figure recorded at the last technical inspection, and inspections are irregular: an unchanged number does not mean work stopped.
  • A handover promise. The declared completion date is a registry field, not a commitment.
  • Asking prices. Everything here is a registered transaction; what a home was listed at is a different number.
  • Off-market and cash-equivalent deals that never reach the registry, and the price actually negotiated before registration.
  • Service charges, chiller fees, agency commission, DLD transfer fees or mortgage costs — none of them are inside these prices.

Nearby projects

10 projects with a page on this site are registered within 1.2 km of Continental Tower. Distance is measured between the coordinates in the DLD project registry.

ProjectDistanceBuiltUnits
The Atlantic
Finished · Gulf Shores Inc
195 m100%82
Bay Central West & Central Towers
Finished · Bay Central Developments Limited
205 m100%748
Harbour Residences
Finished · Harbor Holdings Limited
216 m100%162
Liv Residence
Finished · L I V Real Estate Development L.L.C
219 m100%190
Dubai Marina Mall
Finished · Emaar Properties (P.J.S.C)
365 m100%651
Park Islands
Finished · Emaar Properties (P.J.S.C)
391 m100%752
Marina Quays
Finished · Emaar Properties (P.J.S.C)
400 m100%450
Trident Grand
Finished · Trident International Holding (Fzco)
470 m100%275
K.P.M Tower
Cancelled · Marina Exclusive Limited
480 m7%—
Dm Marina Plaza
Finished · Emaar Properties (P.J.S.C)
488 m100%170

The map loads only when you ask for it (OpenStreetMap, no tracking).

Source: DLD project registry coordinates · Data through 24 Nov 2026 · map © OpenStreetMap contributors · Methodology v1.0 ↗

Where this project sits

More projects in Dubai Marina

Questions about Continental Tower

Who is the developer of Continental Tower?

The Dubai Land Department project registry lists Continental Investments Lmd L.L.C as the developer of Continental Tower.

Is Continental Tower completed?

The DLD registry status of Continental Tower is Finished, 100% complete at the last DLD inspection. The declared completion date in the registry is 10 Apr 2017 — a registry date, not a handover promise.

How many homes are in Continental Tower?

The DLD registry records 224 units in Continental Tower.

What is the price per square foot in Continental Tower?

Over the last 12 complete months the median registered sale in Continental Tower was AED 2.38M, or AED 1 684 per sqft, from 23 registered sales. These are DLD registrations, not asking prices.

Who holds the escrow account for Continental Tower?

The escrow agent recorded by DLD for Continental Tower is Abu Dhabi Commercial Bank.

Where is Continental Tower?

Continental Tower is in the Dubai Marina community. 10 other projects with a page on this site are registered within 1.2 km; the closest is The Atlantic, about 195 m away.

Where does this data come from?

From Dubai Land Department open data — the project registry, unit register and registered sales — rebuilt every night. Data through 24 Nov 2026.

Source: DLD project registry, unit register and registered sales · Data through 24 Nov 2026 · answers built from registry fields · Methodology v1.0 ↗

Cite or reuse this data

Machine-readable mirrors of this page: Markdown · JSON · llms.txt. How to cite: “Continental Tower — Data Dubai, Continental Club Property, data through 24 Nov 2026, https://datadubai.ae/projects/continental-tower/”. Reuse is permitted with attribution.