Creek Beach - Grove is a project by Dubai Creek Harbour L.L.C, recorded at 100% complete at its last Dubai Land Department inspection. 30 sales registered in the trailing 12 months at a median AED 2.41M (2 099 AED per square foot). Registry facts come from DLD; prices are registered transactions, not asking prices.
Source: Registered DLD transactions · Data through 24 Nov 2026 · sample 30 records · outlier-trimmed median, complete months only · Methodology v1.0 ↗
What the DLD registry says about this project
| Field | Value |
|---|---|
| Developer | Dubai Creek Harbour L.L.C |
| Status | Finished |
| Construction progress | 100% — at the last DLD inspection |
| Registered with DLD | 21 Oct 2019 |
| Construction started | 10 Apr 2020 |
| Declared completion | 30 Jun 2023 — registry date, not a handover promise |
| Units in the project | 269 |
| Project area | 338 596 sqm |
| Escrow agent | Mashreq Bank Psc |
| Project number | 2189 |
Source: DLD project registry (Mashrooi) · Data through 24 Nov 2026 · registry fields as recorded, not developer marketing · Methodology v1.0 ↗
Price per square foot, month by month
median interquartile range (middle 50% of transactions)
Source: Registered DLD transactions · Data through 24 Nov 2026 · monthly medians, months with fewer than 5 registered sales are left blank; the line stops at Feb 2026: in the 8 months since, no month reached the five registered sales a median needs (9 in total) · Methodology v1.0 ↗
Construction, inspection by inspection
The DLD registry holds 7 technical inspections for this project, from 13 Oct 2022 at 3.9% to 7 Nov 2024 at 100.0%. The last inspection recorded it complete. Inspections are irregular and the percentage is what was recorded at each one, not a live measure of the site.
each dot is one DLD technical inspection; the line between two of them is drawn, not measured; the dashed mark is the completion date declared in the registry
| Inspection | Recorded | Change |
|---|---|---|
| 7 Nov 2024 | 100.0% | +4.8 pp |
| 17 Sep 2024 | 95.2% | +25.1 pp |
| 7 Mar 2024 | 70.1% | +26.6 pp |
| 5 Oct 2023 | 43.5% | +13.3 pp |
| 12 Jun 2023 | 30.1% | +19.5 pp |
| 26 Jan 2023 | 10.7% | +6.8 pp |
| 13 Oct 2022 | 3.9% | — |
Source: DLD project registry (Mashrooi) — technical inspections · Data through 24 Nov 2026 · percentage as recorded at each inspection; inspections are irregular, and an unchanged value means no new inspection, not that work stopped · Methodology v1.0 ↗
By number of bedrooms
| Homes | Sales | Median price | Median AED/sqft | Median size | Median rent | Gross yield |
|---|---|---|---|---|---|---|
| 1-bedroom apartments low sample (7) | 7 | AED 1.70M | 2 057 | 802 sqft | — | — |
| 2-bedroom apartments low sample (19) | 19 | AED 2.43M | 2 172 | 1 098 sqft | — | — |
| 3-bedroom apartments insufficient data | 4 | — | — | — | — | — |
Source: Registered DLD sales and Ejari rental contracts · Data through 24 Nov 2026 · yield shown only where at least 15 rents and 15 ready-home sales support it · Methodology v1.0 ↗
Latest registered sales
| Date | Property | Registration | Size | Price | AED/sqft |
|---|---|---|---|---|---|
| 23 Oct 2026 | 2 B/R Flat — Grove at Creek Beach Building 1 | Ready | 1 065 sqft | AED 2 275 000 | 2 136 |
| 22 Oct 2026 | 2 B/R Flat — Grove at Creek Beach Building 5 | Ready | 2 143 sqft | AED 3 430 000 | 1 600 |
| 2 Oct 2026 | 2 B/R Flat — Grove at Creek Beach Building 5 | Ready | 1 087 sqft | AED 2 250 000 | 2 069 |
| 24 Aug 2026 | 2 B/R Flat — Grove at Creek Beach Building 5 | Ready | 1 087 sqft | AED 2 000 000 | 1 839 |
| 25 Jun 2026 | 2 B/R Flat — Grove at Creek Beach Building 1 | Ready | 1 061 sqft | AED 2 350 000 | 2 214 |
| 8 Jun 2026 | 1 B/R Flat — Grove at Creek Beach Building 3 | Ready | 766 sqft | AED 1 600 000 | 2 089 |
| 12 May 2026 | 2 B/R Flat — Grove at Creek Beach Building 2 | Ready | 2 180 sqft | AED 3 750 000 | 1 720 |
| 6 Apr 2026 | 3 B/R Flat — Grove at Creek Beach Building 3 | Ready | 1 880 sqft | AED 4 500 000 | 2 394 |
| 30 Mar 2026 | 2 B/R Flat — Grove at Creek Beach Building 3 | Ready | 1 089 sqft | AED 2 550 000 | 2 341 |
| 26 Feb 2026 | 2 B/R Flat — Grove at Creek Beach Building 1 | Ready | 1 064 sqft | AED 2 465 000 | 2 316 |
| 26 Feb 2026 | 2 B/R Flat — Grove at Creek Beach Building 1 | Ready | 526 sqft | AED 900 000 | 1 712 |
| 23 Feb 2026 | 3 B/R Flat — Grove at Creek Beach Building 3 | Ready | 1 876 sqft | AED 4 120 000 | 2 196 |
| 18 Feb 2026 | 2 B/R Flat — Grove at Creek Beach Building 2 | Ready | 1 211 sqft | AED 2 750 000 | 2 270 |
| 11 Feb 2026 | 3 B/R Flat — Grove at Creek Beach Building 1 | Ready | 1 609 sqft | AED 3 375 000 | 2 098 |
| 9 Feb 2026 | 2 B/R Flat — Grove at Creek Beach Building 1 | Ready | 1 115 sqft | AED 6 970 000 | 6 249 |
| 9 Feb 2026 | 1 B/R Flat — Grove at Creek Beach Building 3 | Ready | 1 203 sqft | AED 1 700 000 | 1 414 |
| 4 Feb 2026 | 1 B/R Flat — Grove at Creek Beach Building 1 | Ready | 716 sqft | AED 1 635 000 | 2 283 |
| 26 Jan 2026 | 2 B/R Flat — Grove at Creek Beach Building 3 | Ready | 1 209 sqft | AED 3 200 000 | 2 647 |
| 22 Jan 2026 | 1 B/R Flat — Grove at Creek Beach Building 3 | Ready | 1 535 sqft | AED 1 720 000 | 1 120 |
| 14 Jan 2026 | 2 B/R Flat — Grove at Creek Beach Building 2 | Ready | 1 143 sqft | AED 2 400 000 | 2 099 |
| 8 Jan 2026 | 2 B/R Flat — Grove at Creek Beach Building 5 | Ready | 1 098 sqft | AED 2 575 000 | 2 345 |
| 15 Dec 2025 | 2 B/R Flat — Grove at Creek Beach Building 5 | Ready | 1 098 sqft | AED 2 430 000 | 2 212 |
| 10 Dec 2025 | 1 B/R Flat — Grove at Creek Beach Building 5 | Ready | 798 sqft | AED 1 740 000 | 2 181 |
| 25 Nov 2025 | 2 B/R Flat — Grove at Creek Beach Building 1 | Ready | 1 115 sqft | AED 1 808 757 | 1 622 |
Source: Registered DLD transactions · Data through 24 Nov 2026 · individual registrations, shown exactly as recorded, without trimming · Methodology v1.0 ↗
Every registration, on request
The full DLD record for Creek Beach - Grove: every registered sale, mortgage and gift, and every Ejari rent contract. It loads only when you ask; filter, sort and download it as CSV.
Registered sales by year
registered sales per calendar year; the current year is incomplete
By month
registered sales per month, Nov 2025 – Oct 2026
| Year | Sales | Median price | Median AED/sqft | Total registered value |
|---|---|---|---|---|
| 2026 | 21 | AED 2.46M | 2 118 | AED 58.52M |
| 2025 | 60 | AED 2.27M | 2 081 | AED 143.85M |
| 2024 | 57 | AED 2.30M | 1 862 | AED 138.08M |
| 2023 | 102 | AED 2.09M | 1 910 | AED 243.72M |
| 2022 | 259 | AED 1.71M | 1 602 | AED 501.48M |
Source: Registered DLD transactions · Data through 24 Nov 2026 · calendar years; the current year is partial · Methodology v1.0 ↗
Price and sales, month by month
| Month | Sales | Median price | Median AED/sqft | IQR AED/sqft |
|---|---|---|---|---|
| Feb 2026 | 8 | AED 2.61M | 2 196 | 1 905 – 2 277 |
| Jan 2026 | 4 | — | — | — |
| Dec 2025 | 2 | — | — | — |
| Nov 2025 | 7 | AED 1.89M | 1 946 | 1 595 – 2 132 |
| Oct 2025 | 2 | — | — | — |
| Sep 2025 | 3 | — | — | — |
| Aug 2025 | 5 | AED 2.45M | 2 288 | 2 024 – 2 308 |
| Jul 2025 | 8 | AED 2.61M | 2 259 | 2 225 – 2 351 |
| Jun 2025 | 5 | AED 2.25M | 2 094 | 2 063 – 2 116 |
| May 2025 | 5 | AED 2.25M | 1 844 | 1 468 – 2 025 |
| Apr 2025 | 5 | AED 2.30M | 2 173 | 1 657 – 2 220 |
| Mar 2025 | 3 | — | — | — |
| Feb 2025 | 9 | AED 1.77M | 1 608 | 1 470 – 1 670 |
Source: Registered DLD transactions · Data through 24 Nov 2026 · complete months only; the current month is excluded because DLD keeps registering it · Methodology v1.0 ↗
Buildings in this project
Source: Registered DLD transactions · Data through 24 Nov 2026 · outlier-trimmed median, complete months only · Methodology v1.0 ↗
What these numbers do not show
- Prices from the developer. Nothing here is a price list, a payment plan or availability — these are transactions already registered with DLD.
- Whether construction is moving. The completion percentage is the figure recorded at the last technical inspection, and inspections are irregular: an unchanged number does not mean work stopped.
- A handover promise. The declared completion date is a registry field, not a commitment.
- Asking prices. Everything here is a registered transaction; what a home was listed at is a different number.
- Off-market and cash-equivalent deals that never reach the registry, and the price actually negotiated before registration.
- Service charges, chiller fees, agency commission, DLD transfer fees or mortgage costs — none of them are inside these prices.
Where this project sits
More projects in Dubai Creek Harbour
Questions about Creek Beach - Grove
Who is the developer of Creek Beach - Grove?
The Dubai Land Department project registry lists Dubai Creek Harbour L.L.C as the developer of Creek Beach - Grove.
Is Creek Beach - Grove completed?
The DLD registry status of Creek Beach - Grove is Finished, 100% complete at the last DLD inspection. The declared completion date in the registry is 30 Jun 2023 — a registry date, not a handover promise.
How many homes are in Creek Beach - Grove?
The DLD registry records 269 units in Creek Beach - Grove.
What is the price per square foot in Creek Beach - Grove?
Over the last 12 complete months the median registered sale in Creek Beach - Grove was AED 2.41M, or AED 2 099 per sqft, from 30 registered sales. These are DLD registrations, not asking prices.
Who holds the escrow account for Creek Beach - Grove?
The escrow agent recorded by DLD for Creek Beach - Grove is Mashreq Bank Psc.
Where is Creek Beach - Grove?
Creek Beach - Grove is in the Dubai Creek Harbour community.
Where does this data come from?
From Dubai Land Department open data — the project registry, unit register and registered sales — rebuilt every night. Data through 24 Nov 2026.
Source: DLD project registry, unit register and registered sales · Data through 24 Nov 2026 · answers built from registry fields · Methodology v1.0 ↗