Creek Beach - Orchid
Updated 24 Nov 2026 · latest DLD registrations 24 Nov 2026 · DLD project registry and registered sales · trailing 12 months Nov 2025 – Oct 2026
Ask an AI about Creek Beach - Orchid: ChatGPT · Claude · Perplexity
Creek Beach - Orchid is a project by Dubai Creek Harbour L.L.C, recorded at 100% complete at its last Dubai Land Department inspection. 23 sales registered in the trailing 12 months at a median AED 1.70M (2 128 AED per square foot). Registry facts come from DLD; prices are registered transactions, not asking prices.
Source: Registered DLD transactions · Data through 24 Nov 2026 · sample 23 records · outlier-trimmed median, complete months only · Methodology v1.0 ↗
What the DLD registry says about this project
| Field | Value |
|---|---|
| Developer | Dubai Creek Harbour L.L.C |
| Status | Finished |
| Construction progress | 100% — at the last DLD inspection |
| Registered with DLD | 5 Apr 2022 |
| Construction started | 5 Mar 2022 |
| Declared completion | 30 Sep 2025 — registry date, not a handover promise |
| Units in the project | 208 |
| Project area | 308 934 sqm |
| Escrow agent | Dubai Islamic Bank (Public Joint Stock Company) |
| Project number | 2383 |
Source: DLD project registry (Mashrooi) · Data through 24 Nov 2026 · registry fields as recorded, not developer marketing · Methodology v1.0 ↗
Price per square foot, month by month
median interquartile range (middle 50% of transactions)
Source: Registered DLD transactions · Data through 24 Nov 2026 · monthly medians, months with fewer than 5 registered sales are left blank; the line stops at Feb 2026: in the 8 months since, no month reached the five registered sales a median needs (8 in total) · Methodology v1.0 ↗
Construction, inspection by inspection
The DLD registry holds 6 technical inspections for this project, from 13 Jan 2023 at 9.8% to 10 Oct 2024 at 100.0%. The last inspection recorded it complete. Inspections are irregular and the percentage is what was recorded at each one, not a live measure of the site.
each dot is one DLD technical inspection; the line between two of them is drawn, not measured; the dashed mark is the completion date declared in the registry
| Inspection | Recorded | Change |
|---|---|---|
| 10 Oct 2024 | 100.0% | +5.4 pp |
| 18 Sep 2024 | 94.6% | +14.5 pp |
| 7 Mar 2024 | 80.1% | +38.3 pp |
| 4 Oct 2023 | 41.8% | +11.4 pp |
| 12 Jun 2023 | 30.4% | +20.6 pp |
| 13 Jan 2023 | 9.8% | — |
Source: DLD project registry (Mashrooi) — technical inspections · Data through 24 Nov 2026 · percentage as recorded at each inspection; inspections are irregular, and an unchanged value means no new inspection, not that work stopped · Methodology v1.0 ↗
By number of bedrooms
| Homes | Sales | Median price | Median AED/sqft | Median size | Median rent | Gross yield |
|---|---|---|---|---|---|---|
| 1-bedroom apartments low sample (13) | 13 | AED 1.55M | 2 144 | 689 sqft | — | — |
| 2-bedroom apartments low sample (5) | 5 | AED 2.30M | 2 283 | 1 007 sqft | — | — |
| 3-bedroom apartments low sample (5) | 5 | AED 3.23M | 2 117 | 1 559 sqft | — | — |
Source: Registered DLD sales and Ejari rental contracts · Data through 24 Nov 2026 · yield shown only where at least 15 rents and 15 ready-home sales support it · Methodology v1.0 ↗
Latest registered sales
| Date | Property | Registration | Size | Price | AED/sqft |
|---|---|---|---|---|---|
| 3 Nov 2026 | 3 B/R Flat — Orchid at Creek Beach Building 1 | Ready | 1 550 sqft | AED 2 900 000 | 1 871 |
| 18 Sep 2026 | 1 B/R Flat — Orchid at Creek Beach Building 2 | Ready | 672 sqft | AED 1 440 000 | 2 144 |
| 1 Sep 2026 | 1 B/R Flat — Orchid at Creek Beach Building 1 | Ready | 689 sqft | AED 1 550 000 | 2 249 |
| 31 Jul 2026 | 1 B/R Flat — Orchid at Creek Beach Building 2 | Ready | 729 sqft | AED 1 500 000 | 2 058 |
| 23 Jul 2026 | 1 B/R Flat — Orchid at Creek Beach Building 1 | Ready | 725 sqft | AED 1 620 000 | 2 235 |
| 9 Jul 2026 | 1 B/R Flat — Orchid at Creek Beach Building 2 | Ready | 672 sqft | AED 1 420 000 | 2 114 |
| 12 Jun 2026 | 1 B/R Flat — Orchid at Creek Beach Building 1 | Ready | 919 sqft | AED 1 850 000 | 2 012 |
| 8 Jun 2026 | 1 B/R Flat — Orchid at Creek Beach Building 1 | Ready | 689 sqft | AED 1 410 000 | 2 046 |
| 5 Mar 2026 | 2 B/R Flat — Orchid at Creek Beach Building 2 | Ready | 1 154 sqft | AED 2 450 000 | 2 123 |
| 17 Feb 2026 | 1 B/R Flat — Orchid at Creek Beach Building 2 | Ready | 1 128 sqft | AED 1 800 000 | 1 596 |
| 17 Feb 2026 | 1 B/R Flat — Orchid at Creek Beach Building 2 | Ready | 672 sqft | AED 1 700 000 | 2 529 |
| 10 Feb 2026 | 1 B/R Flat — Orchid at Creek Beach Building 1 | Ready | 690 sqft | AED 1 650 000 | 2 392 |
| 9 Feb 2026 | 3 B/R Flat — Orchid at Creek Beach Building 2 | Ready | 1 649 sqft | AED 3 230 000 | 1 959 |
| 2 Feb 2026 | 1 B/R Flat — Orchid at Creek Beach Building 2 | Ready | 666 sqft | AED 1 550 000 | 2 326 |
| 27 Jan 2026 | 3 B/R Flat — Orchid at Creek Beach Building 1 | Ready | 1 518 sqft | AED 3 230 000 | 2 128 |
| 26 Jan 2026 | 2 B/R Flat — Orchid at Creek Beach Building 1 | Ready | 1 002 sqft | AED 2 400 000 | 2 394 |
| 22 Jan 2026 | 2 B/R Flat — Orchid at Creek Beach Building 2 | Ready | 1 154 sqft | AED 2 300 000 | 1 993 |
| 13 Jan 2026 | 1 B/R Flat — Orchid at Creek Beach Building 2 | Ready | 672 sqft | AED 1 490 000 | 2 216 |
| 7 Jan 2026 | 3 B/R Flat — Orchid at Creek Beach Building 1 | Ready | 1 559 sqft | AED 3 300 000 | 2 117 |
| 9 Dec 2025 | 2 B/R Flat — Orchid at Creek Beach Building 1 | Ready | 1 007 sqft | AED 2 300 000 | 2 283 |
| 24 Nov 2025 | 3 B/R Flat — Orchid at Creek Beach Building 1 | Ready | 1 550 sqft | AED 3 400 000 | 2 194 |
| 17 Nov 2025 | 1 B/R Flat — Orchid at Creek Beach Building 2 | Ready | 739 sqft | AED 1 520 000 | 2 056 |
| 13 Nov 2025 | 2 B/R Flat — Orchid at Creek Beach Building 2 | Ready | 694 sqft | AED 1 600 000 | 2 305 |
| 12 Nov 2025 | 3 B/R Flat — Orchid at Creek Beach Building 2 | Ready | 1 649 sqft | AED 2 850 000 | 1 728 |
Source: Registered DLD transactions · Data through 24 Nov 2026 · individual registrations, shown exactly as recorded, without trimming · Methodology v1.0 ↗
Every registration, on request
The full DLD record for Creek Beach - Orchid: every registered sale, mortgage and gift, and every Ejari rent contract. It loads only when you ask; filter, sort and download it as CSV.
Registered sales by year
registered sales per calendar year; the current year is incomplete
By month
registered sales per month, Nov 2025 – Oct 2026
| Year | Sales | Median price | Median AED/sqft | Total registered value |
|---|---|---|---|---|
| 2026 | 18 | AED 1.68M | 2 125 | AED 35.89M |
| 2025 | 55 | AED 1.65M | 2 129 | AED 112.80M |
| 2024 | 40 | AED 1.43M | 1 880 | AED 69.82M |
| 2023 | 13 | AED 1.25M | 1 748 | AED 17.97M |
| 2022 | 206 | AED 1.27M | 1 723 | AED 319.87M |
Source: Registered DLD transactions · Data through 24 Nov 2026 · calendar years; the current year is partial · Methodology v1.0 ↗
Price and sales, month by month
| Month | Sales | Median price | Median AED/sqft | IQR AED/sqft |
|---|---|---|---|---|
| Feb 2026 | 5 | AED 1.70M | 2 326 | 1 959 – 2 392 |
| Jan 2026 | 5 | AED 2.40M | 2 128 | 2 117 – 2 216 |
| Dec 2025 | 1 | — | — | — |
| Nov 2025 | 4 | — | — | — |
| Oct 2025 | 4 | — | — | — |
| Sep 2025 | 2 | — | — | — |
| Aug 2025 | 7 | AED 1.65M | 2 194 | 2 151 – 2 272 |
| Jul 2025 | 2 | — | — | — |
| Jun 2025 | 3 | — | — | — |
| May 2025 | 4 | — | — | — |
| Apr 2025 | 8 | AED 1.94M | 2 070 | 1 903 – 2 169 |
| Mar 2025 | 7 | AED 1.55M | 2 140 | 1 781 – 2 157 |
| Feb 2025 | 7 | AED 2.15M | 2 064 | 1 940 – 2 110 |
Source: Registered DLD transactions · Data through 24 Nov 2026 · complete months only; the current month is excluded because DLD keeps registering it · Methodology v1.0 ↗
Buildings in this project
Source: Registered DLD transactions · Data through 24 Nov 2026 · outlier-trimmed median, complete months only · Methodology v1.0 ↗
What these numbers do not show
- Prices from the developer. Nothing here is a price list, a payment plan or availability — these are transactions already registered with DLD.
- Whether construction is moving. The completion percentage is the figure recorded at the last technical inspection, and inspections are irregular: an unchanged number does not mean work stopped.
- A handover promise. The declared completion date is a registry field, not a commitment.
- Asking prices. Everything here is a registered transaction; what a home was listed at is a different number.
- Off-market and cash-equivalent deals that never reach the registry, and the price actually negotiated before registration.
- Service charges, chiller fees, agency commission, DLD transfer fees or mortgage costs — none of them are inside these prices.
Where this project sits
More projects in Dubai Creek Harbour
Questions about Creek Beach - Orchid
Who is the developer of Creek Beach - Orchid?
The Dubai Land Department project registry lists Dubai Creek Harbour L.L.C as the developer of Creek Beach - Orchid.
Is Creek Beach - Orchid completed?
The DLD registry status of Creek Beach - Orchid is Finished, 100% complete at the last DLD inspection. The declared completion date in the registry is 30 Sep 2025 — a registry date, not a handover promise.
How many homes are in Creek Beach - Orchid?
The DLD registry records 208 units in Creek Beach - Orchid.
What is the price per square foot in Creek Beach - Orchid?
Over the last 12 complete months the median registered sale in Creek Beach - Orchid was AED 1.70M, or AED 2 128 per sqft, from 23 registered sales. These are DLD registrations, not asking prices.
Who holds the escrow account for Creek Beach - Orchid?
The escrow agent recorded by DLD for Creek Beach - Orchid is Dubai Islamic Bank (Public Joint Stock Company).
Where is Creek Beach - Orchid?
Creek Beach - Orchid is in the Dubai Creek Harbour community.
Where does this data come from?
From Dubai Land Department open data — the project registry, unit register and registered sales — rebuilt every night. Data through 24 Nov 2026.
Source: DLD project registry, unit register and registered sales · Data through 24 Nov 2026 · answers built from registry fields · Methodology v1.0 ↗