Creek Beach - Rosewater
Updated 24 Nov 2026 · latest DLD registrations 24 Nov 2026 · DLD project registry and registered sales · trailing 12 months Nov 2025 – Oct 2026
Ask an AI about Creek Beach - Rosewater: ChatGPT · Claude · Perplexity
Creek Beach - Rosewater is a project by Dubai Creek Harbour L.L.C, recorded at 100% complete at its last Dubai Land Department inspection. 38 sales registered in the trailing 12 months at a median AED 2.58M (2 231 AED per square foot). Registry facts come from DLD; prices are registered transactions, not asking prices.
Source: Registered DLD transactions · Data through 24 Nov 2026 · sample 38 records · outlier-trimmed median, complete months only · Methodology v1.0 ↗
What the DLD registry says about this project
| Field | Value |
|---|---|
| Developer | Dubai Creek Harbour L.L.C |
| Status | Finished |
| Construction progress | 100% — at the last DLD inspection |
| Registered with DLD | 28 Oct 2019 |
| Construction started | 1 Apr 2020 |
| Declared completion | 31 Mar 2023 — registry date, not a handover promise |
| Units in the project | 211 |
| Project area | 310 998 sqm |
| Escrow agent | Mashreq Bank Psc |
| Project number | 2193 |
Source: DLD project registry (Mashrooi) · Data through 24 Nov 2026 · registry fields as recorded, not developer marketing · Methodology v1.0 ↗
Price per square foot, month by month
median interquartile range (middle 50% of transactions)
Source: Registered DLD transactions · Data through 24 Nov 2026 · monthly medians, months with fewer than 5 registered sales are left blank; the line stops at Apr 2026: in the 6 months since, no month reached the five registered sales a median needs (11 in total) · Methodology v1.0 ↗
Construction, inspection by inspection
The DLD registry holds 8 technical inspections for this project, from 20 May 2022 at 4.0% to 7 Nov 2024 at 100.0%. The last inspection recorded it complete. Inspections are irregular and the percentage is what was recorded at each one, not a live measure of the site.
each dot is one DLD technical inspection; the line between two of them is drawn, not measured; the dashed mark is the completion date declared in the registry
| Inspection | Recorded | Change |
|---|---|---|
| 7 Nov 2024 | 100.0% | +4.9 pp |
| 17 Sep 2024 | 95.1% | +29.9 pp |
| 6 Mar 2024 | 65.2% | +28.2 pp |
| 4 Oct 2023 | 37.0% | +11.2 pp |
| 14 Jun 2023 | 25.8% | +15.0 pp |
| 26 Jan 2023 | 10.8% | +6.5 pp |
| 13 Oct 2022 | 4.3% | +0.2 pp |
| 20 May 2022 | 4.0% | — |
Source: DLD project registry (Mashrooi) — technical inspections · Data through 24 Nov 2026 · percentage as recorded at each inspection; inspections are irregular, and an unchanged value means no new inspection, not that work stopped · Methodology v1.0 ↗
By number of bedrooms
| Homes | Sales | Median price | Median AED/sqft | Median size | Median rent | Gross yield |
|---|---|---|---|---|---|---|
| 1-bedroom apartments low sample (7) | 7 | AED 1.70M | 2 375 | 716 sqft | — | — |
| 2-bedroom apartments | 20 | AED 2.43M | 2 162 | 1 091 sqft | — | — |
| 3-bedroom apartments low sample (11) | 11 | AED 4.45M | 2 116 | 1 784 sqft | — | — |
Source: Registered DLD sales and Ejari rental contracts · Data through 24 Nov 2026 · yield shown only where at least 15 rents and 15 ready-home sales support it · Methodology v1.0 ↗
Latest registered sales
| Date | Property | Registration | Size | Price | AED/sqft |
|---|---|---|---|---|---|
| 19 Oct 2026 | 2 B/R Flat — Rosewater at Creek Beach Building 3 | Ready | 1 080 sqft | AED 2 350 000 | 2 177 |
| 16 Oct 2026 | 2 B/R Flat — Rosewater at Creek Beach Building 1 | Ready | 1 087 sqft | AED 2 280 000 | 2 097 |
| 3 Sep 2026 | 2 B/R Flat — Rosewater at Creek Beach Building 2 | Ready | 1 118 sqft | AED 2 400 000 | 2 146 |
| 13 Aug 2026 | 2 B/R Flat — Rosewater at Creek Beach Building 1 | Ready | 1 087 sqft | AED 2 300 000 | 2 116 |
| 7 Aug 2026 | 2 B/R Flat — Rosewater at Creek Beach Building 3 | Ready | 1 134 sqft | AED 2 300 000 | 2 028 |
| 21 Jul 2026 | 3 B/R Flat — Rosewater at Creek Beach Building 1 | Ready | 2 245 sqft | AED 4 750 000 | 2 116 |
| 8 Jul 2026 | 2 B/R Flat — Rosewater at Creek Beach Building 3 | Ready | 1 134 sqft | AED 1 950 000 | 1 719 |
| 29 Jun 2026 | 2 B/R Flat — Rosewater at Creek Beach Building 1 | Ready | 1 091 sqft | AED 2 300 000 | 2 108 |
| 23 Jun 2026 | 2 B/R Flat — Rosewater at Creek Beach Building 2 | Ready | 1 092 sqft | AED 2 625 000 | 2 405 |
| 21 May 2026 | 3 B/R Flat — Rosewater at Creek Beach Building 1 | Ready | 2 546 sqft | AED 4 450 000 | 1 748 |
| 11 May 2026 | 3 B/R Flat — Rosewater at Creek Beach Building 3 | Ready | 1 748 sqft | AED 3 450 000 | 1 974 |
| 29 Apr 2026 | 3 B/R Flat — Rosewater at Creek Beach Building 1 | Ready | 1 613 sqft | AED 4 489 888 | 2 783 |
| 21 Apr 2026 | 1 B/R Flat — Rosewater at Creek Beach Building 3 | Ready | 714 sqft | AED 1 600 000 | 2 240 |
| 16 Apr 2026 | 3 B/R Flat — Rosewater at Creek Beach Building 1 | Ready | 1 784 sqft | AED 4 750 000 | 2 662 |
| 15 Apr 2026 | 2 B/R Flat — Rosewater at Creek Beach Building 2 | Ready | 1 606 sqft | AED 3 230 000 | 2 011 |
| 14 Apr 2026 | 2 B/R Flat — Rosewater at Creek Beach Building 1 | Ready | 1 303 sqft | AED 3 250 000 | 2 494 |
| 13 Apr 2026 | 2 B/R Flat — Rosewater at Creek Beach Building 3 | Ready | 1 079 sqft | AED 2 100 000 | 1 946 |
| 7 Apr 2026 | 3 B/R Flat — Rosewater at Creek Beach Building 2 | Ready | 2 232 sqft | AED 4 168 357 | 1 868 |
| 6 Apr 2026 | 1 B/R Flat — Rosewater at Creek Beach Building 1 | Ready | 717 sqft | AED 1 750 888 | 2 441 |
| 24 Mar 2026 | 2 B/R Flat — Rosewater at Creek Beach Building 3 | Ready | 1 080 sqft | AED 2 600 000 | 2 408 |
| 12 Mar 2026 | 1 B/R Flat — Rosewater at Creek Beach Building 2 | Ready | 718 sqft | AED 1 665 000 | 2 319 |
| 9 Mar 2026 | 2 B/R Flat — Rosewater at Creek Beach Building 2 | Ready | 1 063 sqft | AED 2 995 000 | 2 817 |
| 19 Feb 2026 | 1 B/R Flat — Rosewater at Creek Beach Building 1 | Ready | 716 sqft | AED 1 730 000 | 2 415 |
| 16 Feb 2026 | 2 B/R Flat — Rosewater at Creek Beach Building 2 | Ready | 1 093 sqft | AED 2 670 000 | 2 443 |
Source: Registered DLD transactions · Data through 24 Nov 2026 · individual registrations, shown exactly as recorded, without trimming · Methodology v1.0 ↗
Every registration, on request
The full DLD record for Creek Beach - Rosewater: every registered sale, mortgage and gift, and every Ejari rent contract. It loads only when you ask; filter, sort and download it as CSV.
Registered sales by year
registered sales per calendar year; the current year is incomplete
By month
registered sales per month, Nov 2025 – Oct 2026
| Year | Sales | Median price | Median AED/sqft | Total registered value |
|---|---|---|---|---|
| 2026 | 33 | AED 2.60M | 2 239 | AED 95.13M |
| 2025 | 37 | AED 2.30M | 2 140 | AED 84.06M |
| 2024 | 21 | AED 2.04M | 1 853 | AED 42.38M |
| 2023 | 16 | AED 1.69M | 1 783 | AED 32.09M |
| 2022 | 212 | AED 1.98M | 1 823 | AED 447.00M |
Source: Registered DLD transactions · Data through 24 Nov 2026 · calendar years; the current year is partial · Methodology v1.0 ↗
Price and sales, month by month
| Month | Sales | Median price | Median AED/sqft | IQR AED/sqft |
|---|---|---|---|---|
| Apr 2026 | 8 | AED 3.24M | 2 340 | 1 995 – 2 536 |
| Mar 2026 | 3 | — | — | — |
| Feb 2026 | 7 | AED 2.38M | 2 297 | 2 199 – 2 395 |
| Jan 2026 | 4 | — | — | — |
| Dec 2025 | 3 | — | — | — |
| Nov 2025 | 2 | — | — | — |
| Oct 2025 | 5 | AED 2.45M | 2 270 | 2 255 – 2 320 |
| Sep 2025 | 3 | — | — | — |
| Aug 2025 | 3 | — | — | — |
| Jul 2025 | 2 | — | — | — |
| Jun 2025 | 4 | — | — | — |
| May 2025 | 6 | AED 2.25M | 2 155 | 2 061 – 2 256 |
| Apr 2025 | 5 | AED 1.55M | 2 135 | 2 059 – 2 163 |
Source: Registered DLD transactions · Data through 24 Nov 2026 · complete months only; the current month is excluded because DLD keeps registering it · Methodology v1.0 ↗
Buildings in this project
Source: Registered DLD transactions · Data through 24 Nov 2026 · outlier-trimmed median, complete months only · Methodology v1.0 ↗
What these numbers do not show
- Prices from the developer. Nothing here is a price list, a payment plan or availability — these are transactions already registered with DLD.
- Whether construction is moving. The completion percentage is the figure recorded at the last technical inspection, and inspections are irregular: an unchanged number does not mean work stopped.
- A handover promise. The declared completion date is a registry field, not a commitment.
- Asking prices. Everything here is a registered transaction; what a home was listed at is a different number.
- Off-market and cash-equivalent deals that never reach the registry, and the price actually negotiated before registration.
- Service charges, chiller fees, agency commission, DLD transfer fees or mortgage costs — none of them are inside these prices.
Where this project sits
More projects in Dubai Creek Harbour
Questions about Creek Beach - Rosewater
Who is the developer of Creek Beach - Rosewater?
The Dubai Land Department project registry lists Dubai Creek Harbour L.L.C as the developer of Creek Beach - Rosewater.
Is Creek Beach - Rosewater completed?
The DLD registry status of Creek Beach - Rosewater is Finished, 100% complete at the last DLD inspection. The declared completion date in the registry is 31 Mar 2023 — a registry date, not a handover promise.
How many homes are in Creek Beach - Rosewater?
The DLD registry records 211 units in Creek Beach - Rosewater.
What is the price per square foot in Creek Beach - Rosewater?
Over the last 12 complete months the median registered sale in Creek Beach - Rosewater was AED 2.58M, or AED 2 231 per sqft, from 38 registered sales. These are DLD registrations, not asking prices.
Who holds the escrow account for Creek Beach - Rosewater?
The escrow agent recorded by DLD for Creek Beach - Rosewater is Mashreq Bank Psc.
Where is Creek Beach - Rosewater?
Creek Beach - Rosewater is in the Dubai Creek Harbour community.
Where does this data come from?
From Dubai Land Department open data — the project registry, unit register and registered sales — rebuilt every night. Data through 24 Nov 2026.
Source: DLD project registry, unit register and registered sales · Data through 24 Nov 2026 · answers built from registry fields · Methodology v1.0 ↗