Data Dubai

Damac Hills - Rockwood

Damac Hills - RockwoodFinished100% built177 homesDLD data through 24 Nov 2026

Updated 24 Nov 2026 · latest DLD registrations 24 Nov 2026 · DLD project registry and registered sales · trailing 12 months Nov 2025 – Oct 2026

Ask an AI about Damac Hills - Rockwood: ChatGPT · Claude · Perplexity

Damac Hills - Rockwood is a project by Damac Crescent Properties, recorded at 100% complete at its last Dubai Land Department inspection. 15 sales registered in the trailing 12 months at a median AED 3.85M. Registry facts come from DLD; prices are registered transactions, not asking prices.

Median sale price
AED 3.85M +15.1% y/y
≈ US$ 1.05M · typical range AED 3.48M – AED 4.28M
DLD verified
Median price per sqft
—
built residential only
DLD verified
Registered sales
15 +25.0% y/y
all property types · trailing 12 complete months
DLD verified
Off-plan share
0.0%
of registered sales in the window
DLD verified

Source: Registered DLD transactions · Data through 24 Nov 2026 · sample 15 records · outlier-trimmed median, complete months only · Methodology v1.0 ↗

What the DLD registry says about this project

FieldValue
DeveloperDamac Crescent Properties
StatusFinished
Construction progress100% — at the last DLD inspection
Registered with DLD21 Nov 2013
Construction started1 Nov 2014
Declared completion14 Feb 2018 — registry date, not a handover promise
Units in the project177
Project area49 376 sqm
Escrow agentAbu Dhabi Commercial Bank
Project number1396

Source: DLD project registry (Mashrooi) · Data through 24 Nov 2026 · registry fields as recorded, not developer marketing · Methodology v1.0 ↗

Price per square foot, month by month

No month in this window reached the five registered sales a median needs, so there is nothing to plot.

Source: Registered DLD transactions · Data through 24 Nov 2026 · monthly medians, months with fewer than 5 registered sales are left blank · Methodology v1.0 ↗

Construction, inspection by inspection

The DLD registry holds 9 technical inspections for this project, from 13 Jan 2015 at 5.6% to 14 Feb 2018 at 100.0%. The last inspection recorded it complete. Inspections are irregular and the percentage is what was recorded at each one, not a live measure of the site.

0%25%50%75%100%declared 2018-02-142015-01-132018-02-14

each dot is one DLD technical inspection; the line between two of them is drawn, not measured; the dashed mark is the completion date declared in the registry

InspectionRecordedChange
14 Feb 2018100.0% +1.7 pp
2 Oct 201798.3% +0.9 pp
19 Jun 201797.4% +3.3 pp
14 Mar 201794.0% +30.8 pp
21 Dec 201663.2% +26.5 pp
26 Jul 201636.8% +16.6 pp
15 Mar 201620.2% +8.2 pp
1 Nov 201512.0% +6.4 pp
13 Jan 20155.6% —

Source: DLD project registry (Mashrooi) — technical inspections · Data through 24 Nov 2026 · percentage as recorded at each inspection; inspections are irregular, and an unchanged value means no new inspection, not that work stopped · Methodology v1.0 ↗

Latest registered sales

DatePropertyRegistrationSizePriceAED/sqft
25 Sep 2026VillaReady 2 723 sqftAED 3 525 000 —
7 Sep 2026VillaReady 2 997 sqftAED 3 750 000 —
22 Jul 2026VillaReady 3 607 sqftAED 4 550 000 —
20 Jul 2026VillaReady 2 833 sqftAED 3 900 000 —
4 Jun 2026VillaReady 3 185 sqftAED 3 950 000 —
25 May 2026VillaReady 3 052 sqftAED 4 000 000 —
20 May 2026VillaReady 2 723 sqftAED 3 330 000 —
19 Feb 2026VillaReady 2 723 sqftAED 3 400 000 —
17 Feb 2026VillaReady 3 074 sqftAED 3 850 000 —
2 Feb 2026VillaReady 4 844 sqftAED 6 500 000 —
21 Jan 2026VillaReady 2 723 sqftAED 4 600 000 —
15 Jan 2026VillaReady 2 723 sqftAED 3 475 000 —
26 Dec 2025VillaReady 2 819 sqftAED 3 490 000 —
24 Dec 2025VillaReady 2 723 sqftAED 3 400 000 —
23 Dec 2025VillaReady 4 844 sqftAED 6 850 000 —

Source: Registered DLD transactions · Data through 24 Nov 2026 · individual registrations, shown exactly as recorded, without trimming · Methodology v1.0 ↗

Every registration, on request

The full DLD record for Damac Hills - Rockwood: every registered sale, mortgage and gift, and every Ejari rent contract. It loads only when you ask; filter, sort and download it as CSV.

Registered sales by year

01020302015201620172018201920202021202220232024202520260102030201620182020202220242026

registered sales per calendar year; the current year is incomplete

By month

0123NovDecJanFebMarAprMayJunJulAugSepOct0123DecFebAprJunAugOct

registered sales per month, Nov 2025 – Oct 2026

YearSalesMedian priceMedian AED/sqftTotal registered value
202612AED 3.88M —AED 48.83M
202511AED 3.40M —AED 41.50M
202424AED 3.11M —AED 80.35M
202331AED 2.75M —AED 89.49M
202221AED 2.20M —AED 52.20M
202116AED 1.91M —AED 33.49M
202016AED 1.66M —AED 29.20M
201916AED 1.61M —AED 27.71M
201818AED 1.80M —AED 38.10M
201721AED 2.41M —AED 50.81M
20166AED 2.21M —AED 13.31M
201511AED 2.35M —AED 28.03M

Source: Registered DLD transactions · Data through 24 Nov 2026 · calendar years; the current year is partial · Methodology v1.0 ↗

Rent by year, 2018–2026

100k150k200k201820192020202120222023202420252026100k150k200k201820212024

3-bed villa: median annual rent, AED, of new and renewed Ejari contracts by start year; band = middle half of contracts

Median annual rent, AED thousand
Year3-bed villa
2026 YTD 180k
2025 192k
2024 178k
2023 140k
2022 121k
2021 105k
2020 100k
2019 105k
2018 120k

Source: Ejari rental contracts and registered DLD sales · Data through 24 Nov 2026 · median annual rent per year a contract starts, shown from 15 contracts; yield = median rent ÷ median ready-home price of the same year and home type, from 15 of each · Methodology v1.0 ↗

What these numbers do not show

  • Prices from the developer. Nothing here is a price list, a payment plan or availability — these are transactions already registered with DLD.
  • Whether construction is moving. The completion percentage is the figure recorded at the last technical inspection, and inspections are irregular: an unchanged number does not mean work stopped.
  • A handover promise. The declared completion date is a registry field, not a commitment.
  • A reliable price. Only 15 sales registered in the last 12 months here.
  • Asking prices. Everything here is a registered transaction; what a home was listed at is a different number.
  • Off-market and cash-equivalent deals that never reach the registry, and the price actually negotiated before registration.
  • Service charges, chiller fees, agency commission, DLD transfer fees or mortgage costs — none of them are inside these prices.

Nearby projects

10 projects with a page on this site are registered within 1.2 km of Damac Hills - Rockwood. Distance is measured between the coordinates in the DLD project registry.

ProjectDistanceBuiltUnits
Damac Hills - Rochester
Finished · Damac Crescent Properties
331 m100%128
Damac Hills - Longview
Finished · Damac Crescent Properties
405 m100%57
Damac Hills - Phoenix
Finished · Damac Crescent Properties
421 m100%54
Damac Hills - Richmond
Finished · Damac Crescent Properties
447 m100%118
Damac Hills - The Flora
Finished · Damac Crescent Properties
531 m100%67
Damac Hills - The Turf
Finished · Damac Crescent Properties
550 m100%64
Damac Hills- Pelham
Finished · Damac Crescent Properties
587 m100%173
Damac Hills - Loreto
Finished · Damac Crescent Properties
606 m100%504
Damac Hills - Calero
Finished · Damac Crescent Properties
608 m100%16
Damac Hills - Topanga
Finished · Damac Crescent Properties
669 m100%142

The map loads only when you ask for it (OpenStreetMap, no tracking).

Source: DLD project registry coordinates · Data through 24 Nov 2026 · map © OpenStreetMap contributors · Methodology v1.0 ↗

Where this project sits

More projects in DAMAC HILLS

Questions about Damac Hills - Rockwood

Who is the developer of Damac Hills - Rockwood?

The Dubai Land Department project registry lists Damac Crescent Properties as the developer of Damac Hills - Rockwood.

Is Damac Hills - Rockwood completed?

The DLD registry status of Damac Hills - Rockwood is Finished, 100% complete at the last DLD inspection. The declared completion date in the registry is 14 Feb 2018 — a registry date, not a handover promise.

How many homes are in Damac Hills - Rockwood?

The DLD registry records 177 units in Damac Hills - Rockwood.

What is the price per square foot in Damac Hills - Rockwood?

Too few sales were registered in Damac Hills - Rockwood in the last 12 months to publish a median; earlier registered sales are shown in the charts on this page.

Who holds the escrow account for Damac Hills - Rockwood?

The escrow agent recorded by DLD for Damac Hills - Rockwood is Abu Dhabi Commercial Bank.

Where is Damac Hills - Rockwood?

Damac Hills - Rockwood is in the DAMAC HILLS community. 10 other projects with a page on this site are registered within 1.2 km; the closest is Damac Hills - Rochester, about 331 m away.

Where does this data come from?

From Dubai Land Department open data — the project registry, unit register and registered sales — rebuilt every night. Data through 24 Nov 2026.

Source: DLD project registry, unit register and registered sales · Data through 24 Nov 2026 · answers built from registry fields · Methodology v1.0 ↗

Cite or reuse this data

Machine-readable mirrors of this page: Markdown · JSON · llms.txt. How to cite: “Damac Hills - Rockwood — Data Dubai, Continental Club Property, data through 24 Nov 2026, https://datadubai.ae/projects/damac-hills-rockwood/”. Reuse is permitted with attribution.