Damac Hills - Silver Springs 2

Damac Hills - Silver Springs 2Finished100% built2 homesDLD data through 24 Nov 2026

Updated 24 Nov 2026 · latest DLD registrations 24 Nov 2026 · DLD project registry and registered sales · trailing 12 months Nov 2025 – Oct 2026

Ask an AI about Damac Hills - Silver Springs 2: ChatGPT · Claude · Perplexity

Damac Hills - Silver Springs 2 is a project by Damac Crescent Properties, recorded at 100% complete at its last Dubai Land Department inspection. Fewer than 5 sales registered here in the last 12 months, so no median is published. Registry facts come from DLD; prices are registered transactions, not asking prices.

Median sale price
—
not enough sales
DLD verified
Median price per sqft
—
built residential only
DLD verified
Registered sales
1
all property types · trailing 12 complete months
DLD verified
Off-plan share
0.0%
of registered sales in the window
DLD verified

Source: Registered DLD transactions · Data through 24 Nov 2026 · sample 1 record · outlier-trimmed median, complete months only · Methodology v1.0 ↗

What the DLD registry says about this project

FieldValue
DeveloperDamac Crescent Properties
StatusFinished
Construction progress100% — at the last DLD inspection
Registered with DLD16 Mar 2017
Construction started13 Jun 2017
Declared completion30 Jun 2019 — registry date, not a handover promise
Units in the project2
Project area900 sqm
Escrow agentAbu Dhabi Commercial Bank
Project number1872

Source: DLD project registry (Mashrooi) · Data through 24 Nov 2026 · registry fields as recorded, not developer marketing · Methodology v1.0 ↗

Price per square foot, month by month

No month in this window reached the five registered sales a median needs, so there is nothing to plot.

Source: Registered DLD transactions · Data through 24 Nov 2026 · monthly medians, months with fewer than 5 registered sales are left blank · Methodology v1.0 ↗

Construction, inspection by inspection

The DLD registry holds 2 technical inspections for this project, from 16 Jan 2019 at 95.2% to 11 Jun 2019 at 100.0%. The last inspection recorded it complete. Inspections are irregular and the percentage is what was recorded at each one, not a live measure of the site.

0%25%50%75%100%declared 2019-06-302019-01-162019-06-11

each dot is one DLD technical inspection; the line between two of them is drawn, not measured; the dashed mark is the completion date declared in the registry

InspectionRecordedChange
11 Jun 2019100.0% +4.8 pp
16 Jan 201995.2% —

Source: DLD project registry (Mashrooi) — technical inspections · Data through 24 Nov 2026 · percentage as recorded at each inspection; inspections are irregular, and an unchanged value means no new inspection, not that work stopped · Methodology v1.0 ↗

Latest registered sales

DatePropertyRegistrationSizePriceAED/sqft
5 Oct 2026LandReady 4 828 sqftAED 6 025 000 —

Source: Registered DLD transactions · Data through 24 Nov 2026 · individual registrations, shown exactly as recorded, without trimming · Methodology v1.0 ↗

Every registration, on request

The full DLD record for Damac Hills - Silver Springs 2: every registered sale, mortgage and gift, and every Ejari rent contract. It loads only when you ask; filter, sort and download it as CSV.

Registered sales by year

0012022202600120222026

registered sales per calendar year; the current year is incomplete

By month

001NovDecJanFebMarAprMayJunJulAugSepOct001DecFebAprJunAugOct

registered sales per month, Nov 2025 – Oct 2026

YearSalesMedian priceMedian AED/sqftTotal registered value
20261— —AED 6.03M
20221— —AED 4.88M

Source: Registered DLD transactions · Data through 24 Nov 2026 · calendar years; the current year is partial · Methodology v1.0 ↗

What these numbers do not show

  • Prices from the developer. Nothing here is a price list, a payment plan or availability — these are transactions already registered with DLD.
  • Whether construction is moving. The completion percentage is the figure recorded at the last technical inspection, and inspections are irregular: an unchanged number does not mean work stopped.
  • A handover promise. The declared completion date is a registry field, not a commitment.
  • A reliable price. Only 1 sales registered in the last 12 months here.
  • Asking prices. Everything here is a registered transaction; what a home was listed at is a different number.
  • Off-market and cash-equivalent deals that never reach the registry, and the price actually negotiated before registration.
  • Service charges, chiller fees, agency commission, DLD transfer fees or mortgage costs — none of them are inside these prices.

Nearby projects

10 projects with a page on this site are registered within 1.2 km of Damac Hills - Silver Springs 2. Distance is measured between the coordinates in the DLD project registry.

ProjectDistanceBuiltUnits
Damac Hills - Silver Springs
Finished · Damac Crescent Properties
259 m100%163
Damac Hills -Whitefield-2
Finished · Damac Crescent Properties
423 m100%12
Damac Hills-Veneto
Finished · Damac Crescent Properties
474 m100%101
Damac Hills - Whitefield
Finished · Damac Crescent Properties
548 m100%58
Damac Hills - Queens Meadow
Finished · Damac Crescent Properties
679 m100%119
Polo Homes
Finished · Emaar Properties (P.J.S.C)
703 m100%2
Damac Hills - The Field
Finished · Damac Crescent Properties
818 m100%134
Damac Hills - Brookfield-1
Finished · Damac Crescent Properties
832 m100%66
Damac Hills - The Flora
Finished · Damac Crescent Properties
867 m100%67
Damac Hills - Piccadilly Green
Finished · Damac Crescent Properties
927 m100%163

The map loads only when you ask for it (OpenStreetMap, no tracking).

Source: DLD project registry coordinates · Data through 24 Nov 2026 · map © OpenStreetMap contributors · Methodology v1.0 ↗

Where this project sits

More projects in DAMAC HILLS

Questions about Damac Hills - Silver Springs 2

Who is the developer of Damac Hills - Silver Springs 2?

The Dubai Land Department project registry lists Damac Crescent Properties as the developer of Damac Hills - Silver Springs 2.

Is Damac Hills - Silver Springs 2 completed?

The DLD registry status of Damac Hills - Silver Springs 2 is Finished, 100% complete at the last DLD inspection. The declared completion date in the registry is 30 Jun 2019 — a registry date, not a handover promise.

How many homes are in Damac Hills - Silver Springs 2?

The DLD registry records 2 units in Damac Hills - Silver Springs 2.

What is the price per square foot in Damac Hills - Silver Springs 2?

Too few sales were registered in Damac Hills - Silver Springs 2 in the last 12 months to publish a median; earlier registered sales are shown in the charts on this page.

Who holds the escrow account for Damac Hills - Silver Springs 2?

The escrow agent recorded by DLD for Damac Hills - Silver Springs 2 is Abu Dhabi Commercial Bank.

Where is Damac Hills - Silver Springs 2?

Damac Hills - Silver Springs 2 is in the DAMAC HILLS community. 10 other projects with a page on this site are registered within 1.2 km; the closest is Damac Hills - Silver Springs, about 259 m away.

Where does this data come from?

From Dubai Land Department open data — the project registry, unit register and registered sales — rebuilt every night. Data through 24 Nov 2026.

Source: DLD project registry, unit register and registered sales · Data through 24 Nov 2026 · answers built from registry fields · Methodology v1.0 ↗

Cite or reuse this data

Machine-readable mirrors of this page: Markdown · JSON · llms.txt. How to cite: “Damac Hills - Silver Springs 2 — Data Dubai, Continental Club Property, data through 24 Nov 2026, https://datadubai.ae/projects/damac-hills-silver-springs-2/”. Reuse is permitted with attribution.