Damac Lagoons - Portofino
Data through 22 Oct 2026 · DLD project registry and registered sales · trailing 12 months Oct 2025 – Sep 2026 · rebuilt daily
Damac Lagoons - Portofino is a project by Island Oasis Properties, recorded at 97% complete at its last Dubai Land Department inspection. 127 sales registered in the trailing 12 months at a median AED 2.75M. Registry facts come from DLD; prices are registered transactions, not asking prices.
Source: Registered DLD transactions · Data through 22 Oct 2026 · sample 127 records · outlier-trimmed median, complete months only · Methodology v1.0 ↗
What the DLD registry says about this project
| Field | Value | Provenance |
|---|---|---|
| Developer | Island Oasis Properties | DLD verified |
| Status | Active | DLD verified |
| Construction progress | 97% — at the last DLD inspection | DLD verified |
| Registered with DLD | 31 Jan 2022 | DLD verified |
| Construction started | 24 Apr 2022 | DLD verified |
| Declared completion | 29 Jun 2025 — registry date, not a handover promise | DLD verified |
| Units in the project | 867 | DLD verified |
| Project area | 169 471 sqm | DLD verified |
| Escrow agent | Emirates Nbd Bank (P.J.S.C) | DLD verified |
| Project number | 2356 | DLD verified |
Source: DLD project registry (Mashrooi) · Data through 22 Oct 2026 · registry fields as recorded, not developer marketing · Methodology v1.0 ↗
Price per square foot, month by month
No month in this window reached the five registered sales a median needs, so there is nothing to plot.
Source: Registered DLD transactions · Data through 22 Oct 2026 · monthly medians, months with fewer than 5 registered sales are left blank · Methodology v1.0 ↗
Construction, inspection by inspection
The DLD registry holds 12 technical inspections for this project, from 22 Sep 2022 at 0.1% to 16 Jul 2026 at 97.1%. Over the inspections since 19 Mar 2025 it moved 1.57 percentage points a month. Inspections are irregular and the percentage is what was recorded at each one, not a live measure of the site.
each dot is one DLD technical inspection; the line between two of them is drawn, not measured; the dashed mark is the completion date declared in the registry
| Inspection | Recorded | Change |
|---|---|---|
| 16 Jul 2026 | 97.1% | +0.2 pp |
| 17 Mar 2026 | 96.9% | +6.4 pp |
| 18 Nov 2025 | 90.5% | +9.0 pp |
| 24 Jul 2025 | 81.6% | +9.5 pp |
| 19 Mar 2025 | 72.1% | +1.6 pp |
| 19 Nov 2024 | 70.5% | +10.1 pp |
| 13 Sep 2024 | 60.4% | +24.9 pp |
| 15 Mar 2024 | 35.5% | +26.3 pp |
| 9 Oct 2023 | 9.2% | +6.9 pp |
| 12 Jun 2023 | 2.3% | +2.0 pp |
| 31 Jan 2023 | 0.3% | +0.2 pp |
| 22 Sep 2022 | 0.1% | — |
Source: DLD project registry (Mashrooi) — technical inspections · Data through 22 Oct 2026 · percentage as recorded at each inspection; inspections are irregular, and an unchanged value means no new inspection, not that work stopped · Methodology v1.0 ↗
Registered sales by year
median interquartile range (middle 50% of transactions)
| Year | Sales | Median price | Median AED/sqft | Total registered value |
|---|---|---|---|---|
| 2026 | 101 | AED 2.75M | — | AED 330.25M |
| 2025 | 121 | AED 2.55M | — | AED 440.75M |
| 2024 | 155 | AED 2.10M | — | AED 343.16M |
| 2023 | 136 | AED 1.95M | — | AED 337.39M |
| 2022 | 828 | AED 1.83M | — | AED 2.05B |
Source: Registered DLD transactions · Data through 22 Oct 2026 · calendar years; the current year is partial · Methodology v1.0 ↗
Latest registered sales
| Date | Property | Registration | Size | Price | AED/sqft |
|---|---|---|---|---|---|
| 30 Sep 2026 | Land — DAMAC LAGOONS - PORTOFINO | Ready | 1 550 sqft | AED 2 750 000 | — |
| 28 Sep 2026 | Land — DAMAC LAGOONS - PORTOFINO | Ready | 1 550 sqft | AED 2 750 000 | — |
| 28 Sep 2026 | Land — DAMAC LAGOONS - PORTOFINO | Ready | 1 550 sqft | AED 2 350 000 | — |
| 28 Sep 2026 | Land — DAMAC LAGOONS - PORTOFINO | Ready | 2 364 sqft | AED 3 450 000 | — |
| 28 Sep 2026 | Land — DAMAC LAGOONS - PORTOFINO | Ready | 1 550 sqft | AED 2 710 000 | — |
| 25 Sep 2026 | Land — DAMAC LAGOONS - PORTOFINO | Ready | 1 550 sqft | AED 2 370 000 | — |
| 21 Sep 2026 | Land — DAMAC LAGOONS - PORTOFINO | Ready | 1 550 sqft | AED 2 715 000 | — |
| 18 Sep 2026 | Land — DAMAC LAGOONS - PORTOFINO | Ready | 1 550 sqft | AED 2 400 000 | — |
| 16 Sep 2026 | Land — DAMAC LAGOONS - PORTOFINO | Ready | 1 550 sqft | AED 2 450 000 | — |
| 10 Sep 2026 | Land — DAMAC LAGOONS - PORTOFINO | Ready | 1 636 sqft | AED 2 425 000 | — |
| 10 Sep 2026 | Land — DAMAC LAGOONS - PORTOFINO | Ready | 1 550 sqft | AED 2 583 865 | — |
| 9 Sep 2026 | Land — DAMAC LAGOONS - PORTOFINO | Ready | 1 550 sqft | AED 2 400 000 | — |
Source: Registered DLD transactions · Data through 22 Oct 2026 · individual registrations, shown exactly as recorded, without trimming · Methodology v1.0 ↗
What these numbers do not show
- Prices from the developer. Nothing here is a price list, a payment plan or availability — these are transactions already registered with DLD.
- Whether construction is moving. The completion percentage is the figure recorded at the last technical inspection, and inspections are irregular: an unchanged number does not mean work stopped.
- A handover promise. The declared completion date is a registry field, not a commitment.
- Asking prices. Everything here is a registered transaction; what a home was listed at is a different number.
- Off-market and cash-equivalent deals that never reach the registry, and the price actually negotiated before registration.
- Service charges, chiller fees, agency commission, DLD transfer fees or mortgage costs — none of them are inside these prices.
Where this project sits
More projects in DAMAC Lagoons
For AI agents and researchers
Machine-readable mirrors of this page: Markdown · JSON · llms.txt. How to cite: “Damac Lagoons - Portofino — Dubai Data, Continental Club Property, data through 22 Oct 2026, https://datadubai.ae/projects/damac-lagoons-portofino/”. Reuse is permitted with attribution.