Damac Lagoons - Santorini (2)
Data through 22 Oct 2026 · DLD project registry and registered sales · trailing 12 months Oct 2025 – Sep 2026 · rebuilt daily
Damac Lagoons - Santorini (2) is a project by Island Oasis Properties, recorded at 100% complete at its last Dubai Land Department inspection. 70 sales registered in the trailing 12 months at a median AED 3.35M. Registry facts come from DLD; prices are registered transactions, not asking prices.
Source: Registered DLD transactions · Data through 22 Oct 2026 · sample 70 records · outlier-trimmed median, complete months only · Methodology v1.0 ↗
What the DLD registry says about this project
| Field | Value | Provenance |
|---|---|---|
| Developer | Island Oasis Properties | DLD verified |
| Status | Finished | DLD verified |
| Construction progress | 100% — at the last DLD inspection | DLD verified |
| Registered with DLD | 31 Oct 2021 | DLD verified |
| Construction started | 6 Jan 2022 | DLD verified |
| Declared completion | 29 Jul 2025 — registry date, not a handover promise | DLD verified |
| Units in the project | 388 | DLD verified |
| Project area | 67 031 sqm | DLD verified |
| Escrow agent | Emirates Nbd Bank (P.J.S.C) | DLD verified |
| Project number | 2317 | DLD verified |
Source: DLD project registry (Mashrooi) · Data through 22 Oct 2026 · registry fields as recorded, not developer marketing · Methodology v1.0 ↗
Price per square foot, month by month
No month in this window reached the five registered sales a median needs, so there is nothing to plot.
Source: Registered DLD transactions · Data through 22 Oct 2026 · monthly medians, months with fewer than 5 registered sales are left blank · Methodology v1.0 ↗
Construction, inspection by inspection
The DLD registry holds 10 technical inspections for this project, from 25 May 2022 at 0.4% to 9 Feb 2026 at 100.0%. The last inspection recorded it complete. Inspections are irregular and the percentage is what was recorded at each one, not a live measure of the site.
each dot is one DLD technical inspection; the line between two of them is drawn, not measured; the dashed mark is the completion date declared in the registry
| Inspection | Recorded | Change |
|---|---|---|
| 9 Feb 2026 | 100.0% | +6.4 pp |
| 18 Jun 2025 | 93.6% | +5.8 pp |
| 27 Feb 2025 | 87.8% | +6.3 pp |
| 10 Sep 2024 | 81.6% | +30.0 pp |
| 17 Apr 2024 | 51.6% | +12.9 pp |
| 9 Oct 2023 | 38.7% | +16.2 pp |
| 9 Jun 2023 | 22.5% | +15.1 pp |
| 3 Feb 2023 | 7.4% | +4.3 pp |
| 22 Sep 2022 | 3.1% | +2.6 pp |
| 25 May 2022 | 0.4% | — |
Source: DLD project registry (Mashrooi) — technical inspections · Data through 22 Oct 2026 · percentage as recorded at each inspection; inspections are irregular, and an unchanged value means no new inspection, not that work stopped · Methodology v1.0 ↗
Registered sales by year
median interquartile range (middle 50% of transactions)
| Year | Sales | Median price | Median AED/sqft | Total registered value |
|---|---|---|---|---|
| 2026 | 44 | AED 3.25M | — | AED 147.17M |
| 2025 | 65 | AED 3.10M | — | AED 206.07M |
| 2024 | 47 | AED 2.50M | — | AED 117.97M |
| 2023 | 86 | AED 1.95M | — | AED 182.06M |
| 2022 | 381 | AED 1.75M | — | AED 769.07M |
| 2021 | 17 | AED 2.11M | — | AED 35.06M |
Source: Registered DLD transactions · Data through 22 Oct 2026 · calendar years; the current year is partial · Methodology v1.0 ↗
Latest registered sales
| Date | Property | Registration | Size | Price | AED/sqft |
|---|---|---|---|---|---|
| 29 Sep 2026 | Land — DAMAC LAGOONS - SANTORINI (2) | Ready | 2 364 sqft | AED 3 500 000 | — |
| 28 Sep 2026 | Land — DAMAC LAGOONS - SANTORINI (2) | Ready | 2 315 sqft | AED 4 100 000 | — |
| 28 Sep 2026 | Land — DAMAC LAGOONS - SANTORINI (2) | Ready | 1 550 sqft | AED 3 100 000 | — |
| 22 Sep 2026 | Land — DAMAC LAGOONS - SANTORINI (2) | Ready | 2 364 sqft | AED 3 600 000 | — |
| 9 Sep 2026 | Land — DAMAC LAGOONS - SANTORINI (2) | Ready | 2 364 sqft | AED 3 630 000 | — |
| 25 Aug 2026 | Land — DAMAC LAGOONS - SANTORINI (2) | Ready | 1 550 sqft | AED 3 200 000 | — |
| 21 Aug 2026 | Land — DAMAC LAGOONS - SANTORINI (2) | Ready | 1 550 sqft | AED 2 650 000 | — |
| 19 Aug 2026 | Land — DAMAC LAGOONS - SANTORINI (2) | Ready | 1 550 sqft | AED 2 660 000 | — |
| 19 Aug 2026 | Land — DAMAC LAGOONS - SANTORINI (2) | Ready | 1 550 sqft | AED 3 000 000 | — |
| 14 Aug 2026 | Land — DAMAC LAGOONS - SANTORINI (2) | Ready | 1 550 sqft | AED 3 250 000 | — |
| 13 Aug 2026 | Land — DAMAC LAGOONS - SANTORINI (2) | Ready | 1 550 sqft | AED 3 200 000 | — |
| 22 Jul 2026 | Land — DAMAC LAGOONS - SANTORINI (2) | Ready | 2 364 sqft | AED 3 975 000 | — |
Source: Registered DLD transactions · Data through 22 Oct 2026 · individual registrations, shown exactly as recorded, without trimming · Methodology v1.0 ↗
What these numbers do not show
- Prices from the developer. Nothing here is a price list, a payment plan or availability — these are transactions already registered with DLD.
- Whether construction is moving. The completion percentage is the figure recorded at the last technical inspection, and inspections are irregular: an unchanged number does not mean work stopped.
- A handover promise. The declared completion date is a registry field, not a commitment.
- Asking prices. Everything here is a registered transaction; what a home was listed at is a different number.
- Off-market and cash-equivalent deals that never reach the registry, and the price actually negotiated before registration.
- Service charges, chiller fees, agency commission, DLD transfer fees or mortgage costs — none of them are inside these prices.
Where this project sits
More projects in DAMAC Lagoons
For AI agents and researchers
Machine-readable mirrors of this page: Markdown · JSON · llms.txt. How to cite: “Damac Lagoons - Santorini (2) — Dubai Data, Continental Club Property, data through 22 Oct 2026, https://datadubai.ae/projects/damac-lagoons-santorini-2/”. Reuse is permitted with attribution.
Put this project on your website
Paste this code into any page to show the price-per-sqft chart and the latest registered sales for Damac Lagoons - Santorini (2). It updates every night by itself and always carries the source line and a link back here — that link is the only condition of reuse. Preview · data API and other embeds.