Piazza Roma
Data through 12 Nov 2026 · DLD project registry and registered sales · trailing 12 months Nov 2025 – Oct 2026 · rebuilt daily
Piazza Roma is a project by Island Oasis Properties, recorded at 0% complete at its last Dubai Land Department inspection. 62 sales registered in the trailing 12 months at a median AED 7.12M. Registry facts come from DLD; prices are registered transactions, not asking prices.
Source: Registered DLD transactions · Data through 12 Nov 2026 · sample 62 records · outlier-trimmed median, complete months only · Methodology v1.0 ↗
What the DLD registry says about this project
| Field | Value |
|---|---|
| Developer | Island Oasis Properties |
| Status | Active |
| Construction progress | 0% — at the last DLD inspection |
| Registered with DLD | 23 Feb 2026 |
| Construction started | 30 Jul 2026 |
| Declared completion | 30 Jun 2030 — registry date, not a handover promise |
| Units in the project | 336 |
| Project area | 74 727 sqm |
| Escrow agent | Abu Dhabi Commercial Bank |
| Project number | 4379 |
Source: DLD project registry (Mashrooi) · Data through 12 Nov 2026 · registry fields as recorded, not developer marketing · Methodology v1.0 ↗
Price per square foot, month by month
No month in this window reached the five registered sales a median needs, so there is nothing to plot.
Source: Registered DLD transactions · Data through 12 Nov 2026 · monthly medians, months with fewer than 5 registered sales are left blank · Methodology v1.0 ↗
Construction, inspection by inspection
The DLD registry holds 2 technical inspections for this project, from 3 Feb 2026 at 0.0% to 18 Aug 2026 at 0.2%. Since 3 Feb 2026 the recorded percentage has moved 0.03 percentage points a month. Inspections are irregular and the percentage is what was recorded at each one, not a live measure of the site.
each dot is one DLD technical inspection; the line between two of them is drawn, not measured; the dashed mark is the completion date declared in the registry
| Inspection | Recorded | Change |
|---|---|---|
| 18 Aug 2026 | 0.2% | +0.2 pp |
| 3 Feb 2026 | 0.0% | — |
Source: DLD project registry (Mashrooi) — technical inspections · Data through 12 Nov 2026 · percentage as recorded at each inspection; inspections are irregular, and an unchanged value means no new inspection, not that work stopped · Methodology v1.0 ↗
Latest registered sales
| Date | Property | Registration | Size | Price | AED/sqft |
|---|---|---|---|---|---|
| 28 Oct 2026 | Office — PIAZZA ROMA | Off-plan | 2 516 sqft | AED 7 233 300 | — |
| 28 Oct 2026 | Office — PIAZZA ROMA | Off-plan | 2 515 sqft | AED 7 230 480 | — |
| 28 Oct 2026 | Office — PIAZZA ROMA | Off-plan | 2 133 sqft | AED 6 633 580 | — |
| 28 Oct 2026 | Office — PIAZZA ROMA | Off-plan | 2 495 sqft | AED 6 999 240 | — |
| 28 Oct 2026 | Office — PIAZZA ROMA | Off-plan | 2 508 sqft | AED 7 034 960 | — |
| 27 Oct 2026 | Office — PIAZZA ROMA | Off-plan | 2 318 sqft | AED 6 774 580 | — |
| 27 Oct 2026 | Office — PIAZZA ROMA | Off-plan | 2 175 sqft | AED 6 723 900 | — |
| 27 Oct 2026 | Office — PIAZZA ROMA | Off-plan | 2 175 sqft | AED 6 723 900 | — |
| 26 Oct 2026 | Office — PIAZZA ROMA | Off-plan | 2 269 sqft | AED 6 711 750 | — |
| 23 Oct 2026 | Office — PIAZZA ROMA | Off-plan | 2 109 sqft | AED 7 032 000 | — |
| 19 Oct 2026 | Office — PIAZZA ROMA | Off-plan | 2 495 sqft | AED 7 173 140 | — |
| 19 Oct 2026 | Office — PIAZZA ROMA | Off-plan | 2 318 sqft | AED 6 936 260 | — |
Source: Registered DLD transactions · Data through 12 Nov 2026 · individual registrations, shown exactly as recorded, without trimming · Methodology v1.0 ↗
Registered sales by year
median interquartile range (middle 50% of transactions)
| Year | Sales | Median price | Median AED/sqft | Total registered value |
|---|---|---|---|---|
| 2026 | 62 | AED 7.12M | — | AED 443.28M |
Source: Registered DLD transactions · Data through 12 Nov 2026 · calendar years; the current year is partial · Methodology v1.0 ↗
What these numbers do not show
- Prices from the developer. Nothing here is a price list, a payment plan or availability — these are transactions already registered with DLD.
- Whether construction is moving. The completion percentage is the figure recorded at the last technical inspection, and inspections are irregular: an unchanged number does not mean work stopped.
- A handover promise. The declared completion date is a registry field, not a commitment.
- Asking prices. Everything here is a registered transaction; what a home was listed at is a different number.
- Off-market and cash-equivalent deals that never reach the registry, and the price actually negotiated before registration.
- Service charges, chiller fees, agency commission, DLD transfer fees or mortgage costs — none of them are inside these prices.
Where this project sits
More projects in DAMAC Lagoons
Put this project on your website
Paste this code into any page to show the price-per-sqft chart and the latest registered sales for Piazza Roma. It updates every night by itself and always carries the source line and a link back here — that link is the only condition of reuse. Preview · data API and other embeds.