Executive Bay A
Updated 24 Nov 2026 · latest DLD registrations 24 Nov 2026 · DLD project registry and registered sales · trailing 12 months Nov 2025 – Oct 2026
Ask an AI about Executive Bay A: ChatGPT · Claude · Perplexity
Executive Bay A is a project by Damac Star Properties (L L C), recorded at 100% complete at its last Dubai Land Department inspection. Fewer than 5 sales registered here in the last 12 months, so no median is published. Registry facts come from DLD; prices are registered transactions, not asking prices.
Source: Registered DLD transactions · Data through 24 Nov 2026 · sample 0 records · outlier-trimmed median, complete months only · Methodology v1.0 ↗
What the DLD registry says about this project
| Field | Value |
|---|---|
| Developer | Damac Star Properties (L L C) |
| Status | Finished |
| Construction progress | 100% — at the last DLD inspection |
| Registered with DLD | 8 Nov 2008 |
| Construction started | 1 Mar 2010 |
| Declared completion | 9 Mar 2014 — registry date, not a handover promise |
| Units in the project | 0 |
| Escrow agent | Abu Dhabi Commercial Bank |
| Project number | 446 |
Source: DLD project registry (Mashrooi) · Data through 24 Nov 2026 · registry fields as recorded, not developer marketing · Methodology v1.0 ↗
Price per square foot, month by month
No month in this window reached the five registered sales a median needs, so there is nothing to plot.
Source: Registered DLD transactions · Data through 24 Nov 2026 · monthly medians, months with fewer than 5 registered sales are left blank · Methodology v1.0 ↗
Construction, inspection by inspection
The DLD registry holds 2 technical inspections for this project, from 10 Sep 2013 at 73.0% to 17 Feb 2014 at 95.5%. Over the inspections since 10 Sep 2013 it moved 4.29 percentage points a month. Inspections are irregular and the percentage is what was recorded at each one, not a live measure of the site.
each dot is one DLD technical inspection; the line between two of them is drawn, not measured; the dashed mark is the completion date declared in the registry
| Inspection | Recorded | Change |
|---|---|---|
| 17 Feb 2014 | 95.5% | +22.5 pp |
| 10 Sep 2013 | 73.0% | — |
Source: DLD project registry (Mashrooi) — technical inspections · Data through 24 Nov 2026 · percentage as recorded at each inspection; inspections are irregular, and an unchanged value means no new inspection, not that work stopped · Methodology v1.0 ↗
Every registration, on request
The full DLD record for Executive Bay A: every registered sale, mortgage and gift. It loads only when you ask; filter, sort and download it as CSV.
Buildings in this project
| Building (DLD name) | Sales | Median price | Median AED/sqft | Off-plan |
|---|---|---|---|---|
| Executive Bay-B insufficient data | 0 | — | — | — |
| Executive Bay-A insufficient data | 0 | — | — | — |
Source: Registered DLD transactions · Data through 24 Nov 2026 · outlier-trimmed median, complete months only · Methodology v1.0 ↗
What these numbers do not show
- Prices from the developer. Nothing here is a price list, a payment plan or availability — these are transactions already registered with DLD.
- Whether construction is moving. The completion percentage is the figure recorded at the last technical inspection, and inspections are irregular: an unchanged number does not mean work stopped.
- A handover promise. The declared completion date is a registry field, not a commitment.
- A reliable price. Only 0 sales registered in the last 12 months here.
- Asking prices. Everything here is a registered transaction; what a home was listed at is a different number.
- Off-market and cash-equivalent deals that never reach the registry, and the price actually negotiated before registration.
- Service charges, chiller fees, agency commission, DLD transfer fees or mortgage costs — none of them are inside these prices.
Nearby projects
10 projects with a page on this site are registered within 1.2 km of Executive Bay A. Distance is measured between the coordinates in the DLD project registry.
| Project | Distance | Built |
|---|---|---|
| Executive Bay B Finished · Damac Star Properties (L L C) |
0 m | 100% |
| Dream Bay Cancelled · Pan Global Development L.L.C |
123 m | 2% |
| Sky Bay Hotel Finished · T F G Real Estate L.L.C |
146 m | 100% |
| Elite Business Bay Residence Finished · Range 4 Developments L.L.C |
163 m | 100% |
| Xl Tower Finished · Damac Properties Co (L.L.C) |
254 m | 100% |
| Ag Tower Finished · Arabian Gulf Properties |
302 m | 100% |
| West Wharef Tower Finished · Capital Trust Gulf Limited |
317 m | 100% |
| Business Tower Finished · Damac Properties Co (L.L.C) |
321 m | 100% |
| The Atria Finished · Deyaar Development (P.J.S.C) |
335 m | 100% |
| Millennium Binghatti Residences Business Bay Finished · Binghatti Developers Fze |
368 m | 100% |
The map loads only when you ask for it (OpenStreetMap, no tracking).
Source: DLD project registry coordinates · Data through 24 Nov 2026 · map © OpenStreetMap contributors · Methodology v1.0 ↗
Where this project sits
More projects by Damac Star Properties (L L C)
Questions about Executive Bay A
Who is the developer of Executive Bay A?
The Dubai Land Department project registry lists Damac Star Properties (L L C) as the developer of Executive Bay A.
Is Executive Bay A completed?
The DLD registry status of Executive Bay A is Finished, 100% complete at the last DLD inspection. The declared completion date in the registry is 9 Mar 2014 — a registry date, not a handover promise.
Who holds the escrow account for Executive Bay A?
The escrow agent recorded by DLD for Executive Bay A is Abu Dhabi Commercial Bank.
Where is Executive Bay A?
Executive Bay A is in Dubai. 10 other projects with a page on this site are registered within 1.2 km; the closest is Executive Bay B, about 0 m away.
Where does this data come from?
From Dubai Land Department open data — the project registry, unit register and registered sales — rebuilt every night. Data through 24 Nov 2026.
Source: DLD project registry, unit register and registered sales · Data through 24 Nov 2026 · answers built from registry fields · Methodology v1.0 ↗