Data Dubai

Dream Bay

Dream BayCancelled2% builtDLD data through 25 Nov 2026

Updated 25 Nov 2026 · latest DLD registrations 25 Nov 2026 · DLD project registry and registered sales · trailing 12 months Nov 2025 – Oct 2026

Ask an AI about Dream Bay: ChatGPT · Claude · Perplexity

Dream Bay is a project by Pan Global Development L.L.C, recorded at 2% complete at its last Dubai Land Department inspection. Fewer than 5 sales registered here in the last 12 months, so no median is published. Registry facts come from DLD; prices are registered transactions, not asking prices.

Median sale price
—
not enough sales
DLD verified
Median price per sqft
—
built residential only
DLD verified
Registered sales
0
all property types · trailing 12 complete months
DLD verified
Off-plan share
—
of registered sales in the window
DLD verified

Source: Registered DLD transactions · Data through 25 Nov 2026 · sample 0 records · outlier-trimmed median, complete months only · Methodology v1.0 ↗

What the DLD registry says about this project

FieldValue
DeveloperPan Global Development L.L.C
StatusCancelled
Construction progress2% — at the last DLD inspection
Registered with DLD8 Nov 2008
Construction started1 Jun 2015
Declared completion31 May 2017 — registry date, not a handover promise
Units in the project0
Escrow agentDubai Islamic Bank (Public Joint Stock Company)
Project number527

Source: DLD project registry (Mashrooi) · Data through 25 Nov 2026 · registry fields as recorded, not developer marketing · Methodology v1.0 ↗

Price per square foot, month by month

No month in this window reached the five registered sales a median needs, so there is nothing to plot.

Source: Registered DLD transactions · Data through 25 Nov 2026 · monthly medians, months with fewer than 5 registered sales are left blank · Methodology v1.0 ↗

Construction, inspection by inspection

The DLD registry holds 4 technical inspections for this project, from 5 Jan 2014 at 1.5% to 9 Jun 2016 at 1.6%. The recorded percentage is the same as at the inspection on 30 Sep 2015: no inspection since then changed it. Inspections are irregular and the percentage is what was recorded at each one, not a live measure of the site.

0%25%50%75%100%declared 2017-05-312014-01-052016-06-09

each dot is one DLD technical inspection; the line between two of them is drawn, not measured; the dashed mark is the completion date declared in the registry

InspectionRecordedChange
9 Jun 20161.6% +0.0 pp
30 Sep 20151.6% +0.0 pp
16 Oct 20141.6% +0.1 pp
5 Jan 20141.5% —

Source: DLD project registry (Mashrooi) — technical inspections · Data through 25 Nov 2026 · percentage as recorded at each inspection; inspections are irregular, and an unchanged value means no new inspection, not that work stopped · Methodology v1.0 ↗

What these numbers do not show

  • Prices from the developer. Nothing here is a price list, a payment plan or availability — these are transactions already registered with DLD.
  • Whether construction is moving. The completion percentage is the figure recorded at the last technical inspection, and inspections are irregular: an unchanged number does not mean work stopped.
  • A handover promise. The declared completion date is a registry field, not a commitment.
  • A reliable price. Only 0 sales registered in the last 12 months here.
  • Asking prices. Everything here is a registered transaction; what a home was listed at is a different number.
  • Off-market and cash-equivalent deals that never reach the registry, and the price actually negotiated before registration.
  • Service charges, chiller fees, agency commission, DLD transfer fees or mortgage costs — none of them are inside these prices.

Nearby projects

10 projects with a page on this site are registered within 1.2 km of Dream Bay. Distance is measured between the coordinates in the DLD project registry.

ProjectDistanceBuiltUnits
Executive Bay B
Finished · Damac Star Properties (L L C)
123 m100%299
Executive Bay A
Finished · Damac Star Properties (L L C)
123 m100%—
Elite Business Bay Residence
Finished · Range 4 Developments L.L.C
123 m100%540
Xl Tower
Finished · Damac Properties Co (L.L.C)
132 m100%165
Sky Bay Hotel
Finished · T F G Real Estate L.L.C
185 m100%711
Business Tower
Finished · Damac Properties Co (L.L.C)
213 m100%166
Ag Tower
Finished · Arabian Gulf Properties
233 m100%590
West Wharef Tower
Finished · Capital Trust Gulf Limited
250 m100%115
Millennium Binghatti Residences Business Bay
Finished · Binghatti Developers Fze
265 m100%246
014 Tower
Finished · District Investment & Development (L.L.C)
317 m100%42

The map loads only when you ask for it (OpenStreetMap, no tracking).

Source: DLD project registry coordinates · Data through 25 Nov 2026 · map © OpenStreetMap contributors · Methodology v1.0 ↗

Where this project sits

Questions about Dream Bay

Who is the developer of Dream Bay?

The Dubai Land Department project registry lists Pan Global Development L.L.C as the developer of Dream Bay.

Is Dream Bay completed?

The DLD registry status of Dream Bay is Cancelled, 2% complete at the last DLD inspection. The declared completion date in the registry is 31 May 2017 — a registry date, not a handover promise.

Who holds the escrow account for Dream Bay?

The escrow agent recorded by DLD for Dream Bay is Dubai Islamic Bank (Public Joint Stock Company).

Where is Dream Bay?

Dream Bay is in Dubai. 10 other projects with a page on this site are registered within 1.2 km; the closest is Executive Bay B, about 123 m away.

Where does this data come from?

From Dubai Land Department open data — the project registry, unit register and registered sales — rebuilt every night. Data through 25 Nov 2026.

Source: DLD project registry, unit register and registered sales · Data through 25 Nov 2026 · answers built from registry fields · Methodology v1.0 ↗

Cite or reuse this data

Machine-readable mirrors of this page: Markdown · JSON · llms.txt. How to cite: “Dream Bay — Data Dubai, Continental Club Property, data through 25 Nov 2026, https://datadubai.ae/projects/dream-bay/”. Reuse is permitted with attribution.