Jumeirah Gate
Data through 22 Oct 2026 · DLD project registry and registered sales · trailing 12 months Oct 2025 – Sep 2026 · rebuilt daily
Jumeirah Gate is a project by Al Aseel Investments L.L.C, recorded at 100% complete at its last Dubai Land Department inspection. 64 sales registered in the trailing 12 months at a median AED 4.20M (3 831 AED per square foot). Registry facts come from DLD; prices are registered transactions, not asking prices.
Source: Registered DLD transactions · Data through 22 Oct 2026 · sample 64 records · outlier-trimmed median, complete months only · Methodology v1.0 ↗
What the DLD registry says about this project
| Field | Value | Provenance |
|---|---|---|
| Developer | Al Aseel Investments L.L.C | DLD verified |
| Status | Finished | DLD verified |
| Construction progress | 100% — at the last DLD inspection | DLD verified |
| Registered with DLD | 7 Sep 2016 | DLD verified |
| Construction started | 7 Sep 2016 | DLD verified |
| Declared completion | 28 Mar 2021 — registry date, not a handover promise | DLD verified |
| Units in the project | 920 | DLD verified |
| Project area | 220 332 sqm | DLD verified |
| Escrow agent | First Abu Dhabi Bank P.J.S.C. | DLD verified |
| Project number | 1790 | DLD verified |
Source: DLD project registry (Mashrooi) · Data through 22 Oct 2026 · registry fields as recorded, not developer marketing · Methodology v1.0 ↗
Price per square foot, month by month
median interquartile range (middle 50% of transactions)
Source: Registered DLD transactions · Data through 22 Oct 2026 · monthly medians, months with fewer than 5 registered sales are left blank; the line stops at Feb 2026: in the 7 months since, no month reached the five registered sales a median needs (15 in total) · Methodology v1.0 ↗
Construction, inspection by inspection
The DLD registry holds 10 technical inspections for this project, from 19 Apr 2017 at 3.6% to 23 Mar 2021 at 100.0%. The last inspection recorded it complete. Inspections are irregular and the percentage is what was recorded at each one, not a live measure of the site.
each dot is one DLD technical inspection; the line between two of them is drawn, not measured; the dashed mark is the completion date declared in the registry
| Inspection | Recorded | Change |
|---|---|---|
| 23 Mar 2021 | 100.0% | +13.7 pp |
| 21 Oct 2020 | 86.3% | +8.9 pp |
| 2 Jul 2020 | 77.4% | +7.2 pp |
| 22 Jan 2020 | 70.2% | +23.1 pp |
| 10 Jul 2019 | 47.1% | +16.9 pp |
| 31 Jan 2019 | 30.2% | +7.1 pp |
| 24 Sep 2018 | 23.0% | +6.9 pp |
| 9 Apr 2018 | 16.1% | +7.5 pp |
| 23 Nov 2017 | 8.6% | +5.0 pp |
| 19 Apr 2017 | 3.6% | — |
Source: DLD project registry (Mashrooi) — technical inspections · Data through 22 Oct 2026 · percentage as recorded at each inspection; inspections are irregular, and an unchanged value means no new inspection, not that work stopped · Methodology v1.0 ↗
The same figures as a table
| Month | Sales | Median price | Median AED/sqft | IQR AED/sqft |
|---|---|---|---|---|
| Feb 2026 | 6 | AED 3.95M | 3 594 | 3 387 – 3 835 |
| Jan 2026 | 5 | AED 8.00M | — | — |
| Dec 2025 | 11 | AED 6.55M | 3 901 | 3 812 – 5 008 |
| Nov 2025 | 14 | AED 3.65M | 3 831 | 3 761 – 3 965 |
| Oct 2025 | 5 | AED 7.71M | — | — |
| Sep 2025 | 2 | — | — | — |
| Aug 2025 | 2 | — | — | — |
| Jul 2025 | 3 | — | — | — |
| Jun 2025 | 4 | — | — | — |
| May 2025 | 10 | AED 5.38M | 3 997 | 3 980 – 5 184 |
| Apr 2025 | 9 | AED 3.10M | 3 862 | 3 739 – 4 001 |
| Mar 2025 | 11 | AED 6.45M | 3 607 | 3 471 – 5 270 |
| Feb 2025 | 4 | — | — | — |
Source: Registered DLD transactions · Data through 22 Oct 2026 · complete months only; the current month is excluded because DLD keeps registering it · Methodology v1.0 ↗
By number of bedrooms
| Homes | Sales | Median price | Median AED/sqft | Median size | Median rent | Gross yield |
|---|---|---|---|---|---|---|
| 1-bedroom apartments | 26 | AED 2.84M | 3 831 | 742 sqft | — | — |
| 2-bedroom apartments | 23 | AED 6.75M | 3 644 | 1 475 sqft | — | — |
| 3-bedroom apartments low sample (12) | 12 | AED 9.50M | 4 929 | 1 924 sqft | — | — |
| 4-bedroom apartments insufficient data | 1 | — | — | — | — | — |
| 5-bedroom apartments insufficient data | 2 | — | — | — | — | — |
Source: Registered DLD sales and Ejari rental contracts · Data through 22 Oct 2026 · yield shown only where at least 15 rents and 15 ready-home sales support it · Methodology v1.0 ↗
Registered sales by year
median interquartile range (middle 50% of transactions)
| Year | Sales | Median price | Median AED/sqft | Total registered value |
|---|---|---|---|---|
| 2026 | 31 | AED 4.00M | 3 705 | AED 132.45M |
| 2025 | 100 | AED 4.30M | 3 889 | AED 438.12M |
| 2024 | 96 | AED 4.30M | 4 074 | AED 457.70M |
| 2023 | 134 | AED 3.80M | 3 968 | AED 632.40M |
| 2022 | 373 | AED 3.35M | 3 500 | AED 1.57B |
| 2021 | 435 | AED 4.10M | 2 739 | AED 1.74B |
| 2020 | 80 | AED 3.09M | 2 169 | AED 214.97M |
| 2019 | 21 | AED 2.70M | 2 288 | AED 49.71M |
| 2018 | 23 | AED 2.73M | 2 505 | AED 57.24M |
| 2017 | 288 | AED 2.19M | 2 183 | AED 690.36M |
| 2016 | 76 | AED 2.33M | 2 037 | AED 188.56M |
Source: Registered DLD transactions · Data through 22 Oct 2026 · calendar years; the current year is partial · Methodology v1.0 ↗
Latest registered sales
| Date | Property | Registration | Size | Price | AED/sqft |
|---|---|---|---|---|---|
| 18 Sep 2026 | 3 B/R Hotel Apartment — Jumeirah Gate | Ready | 1 920 sqft | AED 5 000 000 | 2 604 |
| 17 Sep 2026 | 1 B/R Hotel Apartment — Jumeirah Gate | Ready | 810 sqft | AED 3 030 000 | 3 742 |
| 9 Sep 2026 | 2 B/R Flat — Jumeirah Gate | Ready | 1 167 sqft | AED 6 000 000 | 5 142 |
| 2 Sep 2026 | 2 B/R Flat — Jumeirah Gate | Ready | 1 149 sqft | AED 3 850 000 | 3 351 |
| 1 Sep 2026 | 1 B/R Hotel Apartment — Jumeirah Gate | Ready | 741 sqft | AED 2 850 000 | 3 848 |
| 27 Aug 2026 | 5 B/R Hotel Apartment — Jumeirah Gate | Ready | 18 102 sqft | AED 86 000 000 | 4 751 |
| 27 Aug 2026 | 2 B/R Hotel Apartment — Jumeirah Gate | Ready | 1 790 sqft | AED 6 000 000 | 3 353 |
| 27 Aug 2026 | 1 B/R Hotel Apartment — Jumeirah Gate | Ready | 810 sqft | AED 3 000 000 | 3 705 |
| 10 Aug 2026 | 1 B/R Flat — Jumeirah Gate | Ready | 742 sqft | AED 2 450 000 | 3 300 |
| 7 Aug 2026 | 2 B/R Flat — Jumeirah Gate | Ready | 1 477 sqft | AED 6 500 000 | 4 400 |
| 13 Jul 2026 | 3 B/R Flat — Jumeirah Gate | Ready | 1 939 sqft | AED 4 343 722 | 2 240 |
| 2 Jul 2026 | 1 B/R Flat — Jumeirah Gate | Ready | 742 sqft | AED 2 400 000 | 3 233 |
Source: Registered DLD transactions · Data through 22 Oct 2026 · individual registrations, shown exactly as recorded, without trimming · Methodology v1.0 ↗
What these numbers do not show
- Prices from the developer. Nothing here is a price list, a payment plan or availability — these are transactions already registered with DLD.
- Whether construction is moving. The completion percentage is the figure recorded at the last technical inspection, and inspections are irregular: an unchanged number does not mean work stopped.
- A handover promise. The declared completion date is a registry field, not a commitment.
- Asking prices. Everything here is a registered transaction; what a home was listed at is a different number.
- Off-market and cash-equivalent deals that never reach the registry, and the price actually negotiated before registration.
- Service charges, chiller fees, agency commission, DLD transfer fees or mortgage costs — none of them are inside these prices.
Where this project sits
For AI agents and researchers
Machine-readable mirrors of this page: Markdown · JSON · llms.txt. How to cite: “Jumeirah Gate — Dubai Data, Continental Club Property, data through 22 Oct 2026, https://datadubai.ae/projects/jumeirah-gate/”. Reuse is permitted with attribution.
Put this project on your website
Paste this code into any page to show the price-per-sqft chart and the latest registered sales for Jumeirah Gate. It updates every night by itself and always carries the source line and a link back here — that link is the only condition of reuse. Preview · data API and other embeds.