Lusin Residences By Ermax Development

Lusin Residences By Ermax DevelopmentActive35% built57 homesDLD data through 24 Nov 2026

Updated 24 Nov 2026 · latest DLD registrations 24 Nov 2026 · DLD project registry and registered sales · trailing 12 months Nov 2025 – Oct 2026

Ask an AI about Lusin Residences By Ermax Development: ChatGPT · Claude · Perplexity

Lusin Residences By Ermax Development is a project by Ermax Development L.L.C, recorded at 35% complete at its last Dubai Land Department inspection. 5 sales registered in the trailing 12 months at a median — (1 246 AED per square foot). Registry facts come from DLD; prices are registered transactions, not asking prices.

Median sale price
—
not enough sales
DLD verified
Median price per sqft
AED 1 246/sqft
typical range 1 232 – 1 269 AED/sqft
DLD verified
Registered sales
5
all property types · trailing 12 complete months
DLD verified
Off-plan share
100.0%
of registered sales in the window
DLD verified

Source: Registered DLD transactions · Data through 24 Nov 2026 · sample 5 records · outlier-trimmed median, complete months only · Methodology v1.0 ↗

What the DLD registry says about this project

FieldValue
DeveloperErmax Development L.L.C
StatusActive
Construction progress35% — at the last DLD inspection
Registered with DLD25 Dec 2025
Construction started12 Dec 2024
Declared completion15 Dec 2026 — registry date, not a handover promise
Units in the project57
Project area4 099 sqm
Escrow agentEmirates Nbd Bank (P.J.S.C)
Project number3645

Source: DLD project registry (Mashrooi) · Data through 24 Nov 2026 · registry fields as recorded, not developer marketing · Methodology v1.0 ↗

Price per square foot, month by month

No month in this window reached the five registered sales a median needs, so there is nothing to plot.

Source: Registered DLD transactions · Data through 24 Nov 2026 · monthly medians, months with fewer than 5 registered sales are left blank · Methodology v1.0 ↗

Construction, inspection by inspection

The DLD registry holds 3 technical inspections for this project, from 10 Nov 2025 at 26.1% to 18 Jun 2026 at 35.0%. Over the inspections since 10 Nov 2025 it moved 1.23 percentage points a month. Inspections are irregular and the percentage is what was recorded at each one, not a live measure of the site.

0%25%50%75%100%declared 2026-12-152025-11-102026-06-18

each dot is one DLD technical inspection; the line between two of them is drawn, not measured; the dashed mark is the completion date declared in the registry

InspectionRecordedChange
18 Jun 202635.0% +3.2 pp
10 Dec 202531.8% +5.7 pp
10 Nov 202526.1% —

Source: DLD project registry (Mashrooi) — technical inspections · Data through 24 Nov 2026 · percentage as recorded at each inspection; inspections are irregular, and an unchanged value means no new inspection, not that work stopped · Methodology v1.0 ↗

Homes and registered off-plan sales

At least 50 of the 55 homes in Lusin Residences By Ermax Development (91%) have no off-plan sale registered with the Dubai Land Department yet, as of 23 Nov 2026. The unit register lists 55 homes and DLD has recorded 5 off-plan sale registrations; because that count also includes resales before completion, the true number without a buyer can only be higher. This is not the developer's availability list.

HomesNo sale yet,
at least
In unit
register
Registered
sales
Studios14173
1 bedroom27281
2 bedrooms9101

Source: DLD unit register and registered off-plan sales · Data through 23 Nov 2026 · 'Sell - Pre registration' registrations include resales before completion, so the gap is a floor, not the developer's availability · Methodology v1.0 ↗

Homes without a registered sale in all Dubai off-plan projects →

By number of bedrooms

HomesSalesMedian priceMedian AED/sqftMedian sizeMedian rentGross yield
Studios insufficient data 3— — — — —
1-bedroom apartments insufficient data 1— — — — —
2-bedroom apartments insufficient data 1— — — — —

Source: Registered DLD sales and Ejari rental contracts · Data through 24 Nov 2026 · yield shown only where at least 15 rents and 15 ready-home sales support it · Methodology v1.0 ↗

Latest registered sales

DatePropertyRegistrationSizePriceAED/sqft
21 Oct 20262 B/R FlatOff-plan 1 072 sqftAED 1 285 000 1 199
7 May 2026Studio FlatOff-plan 339 sqftAED 422 750 1 246
1 Apr 20261 B/R FlatOff-plan 769 sqftAED 947 000 1 232
17 Mar 2026Studio FlatOff-plan 339 sqftAED 437 000 1 288
2 Mar 2026Studio FlatOff-plan 339 sqftAED 430 445 1 269

Source: Registered DLD transactions · Data through 24 Nov 2026 · individual registrations, shown exactly as recorded, without trimming · Methodology v1.0 ↗

Every registration, on request

The full DLD record for Lusin Residences By Ermax Development: every registered sale, mortgage and gift. It loads only when you ask; filter, sort and download it as CSV.

Registered sales by year

02420260242026

registered sales per calendar year; the current year is incomplete

By month

001NovDecJanFebMarAprMayJunJulAugSepOct001DecFebAprJunAugOct

registered sales per month, Nov 2025 – Oct 2026

YearSalesMedian priceMedian AED/sqftTotal registered value
20265— 1 246AED 2.23M

Source: Registered DLD transactions · Data through 24 Nov 2026 · calendar years; the current year is partial · Methodology v1.0 ↗

What these numbers do not show

  • Prices from the developer. Nothing here is a price list, a payment plan or availability — these are transactions already registered with DLD.
  • Whether construction is moving. The completion percentage is the figure recorded at the last technical inspection, and inspections are irregular: an unchanged number does not mean work stopped.
  • A handover promise. The declared completion date is a registry field, not a commitment.
  • A reliable price. Only 5 sales registered in the last 12 months here.
  • Asking prices. Everything here is a registered transaction; what a home was listed at is a different number.
  • Off-market and cash-equivalent deals that never reach the registry, and the price actually negotiated before registration.
  • Service charges, chiller fees, agency commission, DLD transfer fees or mortgage costs — none of them are inside these prices.

Where this project sits

More projects in International City Phase 1

Questions about Lusin Residences By Ermax Development

Who is the developer of Lusin Residences By Ermax Development?

The Dubai Land Department project registry lists Ermax Development L.L.C as the developer of Lusin Residences By Ermax Development.

Is Lusin Residences By Ermax Development completed?

The DLD registry status of Lusin Residences By Ermax Development is Active, 35% complete at the last DLD inspection. The declared completion date in the registry is 15 Dec 2026 — a registry date, not a handover promise.

How many homes are in Lusin Residences By Ermax Development?

The DLD registry records 57 units in Lusin Residences By Ermax Development. The split by number of bedrooms is in the unit register table on this page.

What is the price per square foot in Lusin Residences By Ermax Development?

Too few sales were registered in Lusin Residences By Ermax Development in the last 12 months to publish a median; earlier registered sales are shown in the charts on this page.

Who holds the escrow account for Lusin Residences By Ermax Development?

The escrow agent recorded by DLD for Lusin Residences By Ermax Development is Emirates Nbd Bank (P.J.S.C).

Where is Lusin Residences By Ermax Development?

Lusin Residences By Ermax Development is in the International City Phase 1 community.

Where does this data come from?

From Dubai Land Department open data — the project registry, unit register and registered sales — rebuilt every night. Data through 24 Nov 2026.

Source: DLD project registry, unit register and registered sales · Data through 24 Nov 2026 · answers built from registry fields · Methodology v1.0 ↗

Cite or reuse this data

Machine-readable mirrors of this page: Markdown · JSON · llms.txt. How to cite: “Lusin Residences By Ermax Development — Data Dubai, Continental Club Property, data through 24 Nov 2026, https://datadubai.ae/projects/lusin-residences-by-ermax-development/”. Reuse is permitted with attribution.