Midtown - Afnan
Data through 22 Oct 2026 · DLD project registry and registered sales · trailing 12 months Oct 2025 – Sep 2026 · rebuilt daily
Midtown - Afnan is a project by Deyaar Development (P.J.S.C), recorded at 100% complete at its last Dubai Land Department inspection. 62 sales registered in the trailing 12 months at a median AED 805k (1 225 AED per square foot). Registry facts come from DLD; prices are registered transactions, not asking prices.
Source: Registered DLD transactions · Data through 22 Oct 2026 · sample 62 records · outlier-trimmed median, complete months only · Methodology v1.0 ↗
What the DLD registry says about this project
| Field | Value | Provenance |
|---|---|---|
| Developer | Deyaar Development (P.J.S.C) | DLD verified |
| Status | Finished | DLD verified |
| Construction progress | 100% — at the last DLD inspection | DLD verified |
| Registered with DLD | 11 Aug 2015 | DLD verified |
| Construction started | 1 May 2016 | DLD verified |
| Declared completion | 24 Oct 2019 — registry date, not a handover promise | DLD verified |
| Units in the project | 677 | DLD verified |
| Project area | 186 221 sqm | DLD verified |
| Escrow agent | Dubai Islamic Bank (Public Joint Stock Company) | DLD verified |
| Project number | 1672 | DLD verified |
Source: DLD project registry (Mashrooi) · Data through 22 Oct 2026 · registry fields as recorded, not developer marketing · Methodology v1.0 ↗
Price per square foot, month by month
median interquartile range (middle 50% of transactions)
Source: Registered DLD transactions · Data through 22 Oct 2026 · monthly medians, months with fewer than 5 registered sales are left blank; the line stops at Apr 2026: in the 5 months since, no month reached the five registered sales a median needs (12 in total) · Methodology v1.0 ↗
Construction, inspection by inspection
The DLD registry holds 11 technical inspections for this project, from 29 Nov 2016 at 2.3% to 24 Oct 2019 at 100.0%. The last inspection recorded it complete. Inspections are irregular and the percentage is what was recorded at each one, not a live measure of the site.
each dot is one DLD technical inspection; the line between two of them is drawn, not measured; the dashed mark is the completion date declared in the registry
| Inspection | Recorded | Change |
|---|---|---|
| 24 Oct 2019 | 100.0% | +9.5 pp |
| 19 Jun 2019 | 90.5% | +15.4 pp |
| 4 Mar 2019 | 75.1% | +20.0 pp |
| 17 Oct 2018 | 55.1% | +14.0 pp |
| 27 Jun 2018 | 41.1% | +0.0 pp |
| 27 Jun 2018 | 41.1% | +8.5 pp |
| 8 Apr 2018 | 32.6% | +16.8 pp |
| 13 Dec 2017 | 15.8% | +11.3 pp |
| 31 Jul 2017 | 4.5% | +1.7 pp |
| 27 Mar 2017 | 2.8% | +0.5 pp |
| 29 Nov 2016 | 2.3% | — |
Source: DLD project registry (Mashrooi) — technical inspections · Data through 22 Oct 2026 · percentage as recorded at each inspection; inspections are irregular, and an unchanged value means no new inspection, not that work stopped · Methodology v1.0 ↗
The same figures as a table
| Month | Sales | Median price | Median AED/sqft | IQR AED/sqft |
|---|---|---|---|---|
| Apr 2026 | 9 | AED 775k | 1 200 | 1 057 – 1 214 |
| Mar 2026 | 4 | — | — | — |
| Feb 2026 | 7 | AED 835k | 1 171 | 1 103 – 1 284 |
| Jan 2026 | 3 | — | — | — |
| Dec 2025 | 8 | AED 810k | 1 293 | 1 217 – 1 316 |
| Nov 2025 | 6 | AED 800k | 1 219 | 1 164 – 1 233 |
| Oct 2025 | 6 | AED 770k | 1 204 | 1 174 – 1 245 |
| Sep 2025 | 6 | AED 779k | 1 200 | 1 168 – 1 219 |
| Aug 2025 | 7 | AED 820k | 1 287 | 1 186 – 1 327 |
| Jul 2025 | 13 | AED 750k | 1 124 | 1 052 – 1 207 |
| Jun 2025 | 5 | AED 1.27M | 1 225 | 1 222 – 1 234 |
| May 2025 | 15 | AED 740k | 1 175 | 1 102 – 1 222 |
| Apr 2025 | 9 | AED 735k | 1 128 | 1 089 – 1 198 |
Source: Registered DLD transactions · Data through 22 Oct 2026 · complete months only; the current month is excluded because DLD keeps registering it · Methodology v1.0 ↗
By number of bedrooms
| Homes | Sales | Median price | Median AED/sqft | Median size | Median rent | Gross yield |
|---|---|---|---|---|---|---|
| Studios low sample (10) | 10 | AED 538k | 1 253 | 433 sqft | — | — |
| 1-bedroom apartments | 42 | AED 805k | 1 213 | 652 sqft | — | — |
| 2-bedroom apartments low sample (9) | 9 | AED 1.39M | 1 243 | 1 098 sqft | — | — |
| 3-bedroom apartments insufficient data | 1 | — | — | — | — | — |
Source: Registered DLD sales and Ejari rental contracts · Data through 22 Oct 2026 · yield shown only where at least 15 rents and 15 ready-home sales support it · Methodology v1.0 ↗
Registered sales by year
median interquartile range (middle 50% of transactions)
| Year | Sales | Median price | Median AED/sqft | Total registered value |
|---|---|---|---|---|
| 2026 | 40 | AED 815k | 1 225 | AED 31.84M |
| 2025 | 100 | AED 760k | 1 189 | AED 76.26M |
| 2024 | 121 | AED 720k | 1 036 | AED 90.42M |
| 2023 | 67 | AED 620k | 886 | AED 45.40M |
| 2022 | 55 | AED 602k | 932 | AED 35.75M |
| 2021 | 139 | AED 704k | 1 076 | AED 108.20M |
| 2020 | 35 | AED 710k | 1 011 | AED 26.12M |
| 2019 | 37 | AED 786k | 1 002 | AED 30.88M |
| 2018 | 20 | AED 724k | 1 022 | AED 17.14M |
| 2017 | 67 | AED 743k | 1 075 | AED 54.48M |
| 2016 | 323 | AED 655k | 993 | AED 215.72M |
| 2015 | 1 | — | — | AED 421k |
Source: Registered DLD transactions · Data through 22 Oct 2026 · calendar years; the current year is partial · Methodology v1.0 ↗
Latest registered sales
| Date | Property | Registration | Size | Price | AED/sqft |
|---|---|---|---|---|---|
| 30 Sep 2026 | 1 B/R Flat — MIDTOWN - AFNAN | Ready | 663 sqft | AED 720 000 | 1 086 |
| 23 Sep 2026 | 1 B/R Flat — MIDTOWN - AFNAN | Ready | 637 sqft | AED 805 000 | 1 263 |
| 13 Aug 2026 | 1 B/R Flat — MIDTOWN - AFNAN | Ready | 710 sqft | AED 825 000 | 1 162 |
| 13 Aug 2026 | 1 B/R Flat — MIDTOWN - AFNAN | Ready | 642 sqft | AED 840 000 | 1 308 |
| 3 Aug 2026 | 1 B/R Flat — MIDTOWN - AFNAN | Ready | 637 sqft | AED 870 000 | 1 365 |
| 31 Jul 2026 | 1 B/R Flat — MIDTOWN - AFNAN | Ready | 651 sqft | AED 23 829 | 37 |
| 29 Jul 2026 | 1 B/R Flat — MIDTOWN - AFNAN | Ready | 642 sqft | AED 7 209 | 11 |
| 22 Jul 2026 | 1 B/R Flat — MIDTOWN - AFNAN | Ready | 666 sqft | AED 9 393 | 14 |
| 13 Jul 2026 | 2 B/R Flat — MIDTOWN - AFNAN | Ready | 1 098 sqft | AED 1 345 000 | 1 225 |
| 6 Jul 2026 | 1 B/R Flat — MIDTOWN - AFNAN | Ready | 637 sqft | AED 810 000 | 1 271 |
| 18 Jun 2026 | 2 B/R Flat — MIDTOWN - AFNAN | Ready | 1 134 sqft | AED 1 410 000 | 1 243 |
| 9 Jun 2026 | 1 B/R Flat — MIDTOWN - AFNAN | Ready | 666 sqft | AED 780 000 | 1 172 |
Source: Registered DLD transactions · Data through 22 Oct 2026 · individual registrations, shown exactly as recorded, without trimming · Methodology v1.0 ↗
What these numbers do not show
- Prices from the developer. Nothing here is a price list, a payment plan or availability — these are transactions already registered with DLD.
- Whether construction is moving. The completion percentage is the figure recorded at the last technical inspection, and inspections are irregular: an unchanged number does not mean work stopped.
- A handover promise. The declared completion date is a registry field, not a commitment.
- Asking prices. Everything here is a registered transaction; what a home was listed at is a different number.
- Off-market and cash-equivalent deals that never reach the registry, and the price actually negotiated before registration.
- Service charges, chiller fees, agency commission, DLD transfer fees or mortgage costs — none of them are inside these prices.
Where this project sits
More projects in International Media Production Zone
For AI agents and researchers
Machine-readable mirrors of this page: Markdown · JSON · llms.txt. How to cite: “Midtown - Afnan — Dubai Data, Continental Club Property, data through 22 Oct 2026, https://datadubai.ae/projects/midtown-afnan/”. Reuse is permitted with attribution.
Put this project on your website
Paste this code into any page to show the price-per-sqft chart and the latest registered sales for Midtown - Afnan. It updates every night by itself and always carries the source line and a link back here — that link is the only condition of reuse. Preview · data API and other embeds.