Jannat
Updated 24 Nov 2026 · latest DLD registrations 24 Nov 2026 · DLD project registry and registered sales · trailing 12 months Nov 2025 – Oct 2026
Ask an AI about Jannat: ChatGPT · Claude · Perplexity
Jannat is a project by Deyaar Development (P.J.S.C), recorded at 100% complete at its last Dubai Land Department inspection. 57 sales registered in the trailing 12 months at a median AED 1.05M (1 367 AED per square foot). Registry facts come from DLD; prices are registered transactions, not asking prices.
Source: Registered DLD transactions · Data through 24 Nov 2026 · sample 57 records · outlier-trimmed median, complete months only · Methodology v1.0 ↗
What the DLD registry says about this project
| Field | Value |
|---|---|
| Developer | Deyaar Development (P.J.S.C) |
| Status | Finished |
| Construction progress | 100% — at the last DLD inspection |
| Registered with DLD | 29 Aug 2023 |
| Construction started | 1 Dec 2023 |
| Units in the project | 362 |
| Project area | 186 585 sqm |
| Escrow agent | Dubai Islamic Bank (Public Joint Stock Company) |
| Project number | 2725 |
Source: DLD project registry (Mashrooi) · Data through 24 Nov 2026 · registry fields as recorded, not developer marketing · Methodology v1.0 ↗
Price per square foot, month by month
median interquartile range (middle 50% of transactions)
Source: Registered DLD transactions · Data through 24 Nov 2026 · monthly medians, months with fewer than 5 registered sales are left blank; the line stops at Sep 2026: in the 1 months since, no month reached the five registered sales a median needs (4 in total) · Methodology v1.0 ↗
Construction, inspection by inspection
The DLD registry holds 7 technical inspections for this project, from 17 Jul 2023 at 0.0% to 8 Apr 2026 at 100.0%. The last inspection recorded it complete. Inspections are irregular and the percentage is what was recorded at each one, not a live measure of the site.
each dot is one DLD technical inspection; the line between two of them is drawn, not measured; the dashed mark is the completion date declared in the registry
| Inspection | Recorded | Change |
|---|---|---|
| 8 Apr 2026 | 100.0% | +3.9 pp |
| 6 Feb 2026 | 96.1% | +16.2 pp |
| 14 Oct 2025 | 79.9% | +23.5 pp |
| 2 Jun 2025 | 56.4% | +25.4 pp |
| 7 Feb 2025 | 31.0% | +22.2 pp |
| 25 Jul 2024 | 8.8% | +8.8 pp |
| 17 Jul 2023 | 0.0% | — |
Source: DLD project registry (Mashrooi) — technical inspections · Data through 24 Nov 2026 · percentage as recorded at each inspection; inspections are irregular, and an unchanged value means no new inspection, not that work stopped · Methodology v1.0 ↗
By number of bedrooms
| Homes | Sales | Median price | Median AED/sqft | Median size | Median rent | Gross yield |
|---|---|---|---|---|---|---|
| Studios low sample (10) | 10 | AED 630k | 1 647 | 382 sqft | — | — |
| 1-bedroom apartments | 21 | AED 995k | 1 315 | 777 sqft | — | — |
| 2-bedroom apartments | 24 | AED 1.68M | 1 430 | 1 161 sqft | — | — |
| 3-bedroom apartments insufficient data | 2 | — | — | — | — | — |
Source: Registered DLD sales and Ejari rental contracts · Data through 24 Nov 2026 · yield shown only where at least 15 rents and 15 ready-home sales support it · Methodology v1.0 ↗
Latest registered sales
| Date | Property | Registration | Size | Price | AED/sqft |
|---|---|---|---|---|---|
| 18 Nov 2026 | Studio Flat | Ready | 379 sqft | AED 605 000 | 1 595 |
| 17 Nov 2026 | Studio Flat | Ready | 379 sqft | AED 615 000 | 1 622 |
| 9 Nov 2026 | 1 B/R Flat | Ready | 782 sqft | AED 1 120 000 | 1 432 |
| 6 Nov 2026 | 2 B/R Flat | Ready | 1 126 sqft | AED 1 685 000 | 1 497 |
| 28 Oct 2026 | 1 B/R Flat | Ready | 780 sqft | AED 1 050 000 | 1 345 |
| 27 Oct 2026 | 2 B/R Flat | Ready | 1 202 sqft | AED 1 770 000 | 1 472 |
| 13 Oct 2026 | 1 B/R Flat | Ready | 800 sqft | AED 1 255 500 | 1 569 |
| 12 Oct 2026 | 2 B/R Flat | Ready | 1 200 sqft | AED 1 640 000 | 1 367 |
| 24 Sep 2026 | 2 B/R Flat | Ready | 1 204 sqft | AED 1 750 000 | 1 453 |
| 21 Sep 2026 | 2 B/R Flat | Ready | 1 157 sqft | AED 1 800 000 | 1 556 |
| 21 Sep 2026 | 2 B/R Flat | Ready | 1 160 sqft | AED 1 747 500 | 1 506 |
| 16 Sep 2026 | 2 B/R Flat | Ready | 1 202 sqft | AED 1 500 000 | 1 247 |
| 16 Sep 2026 | 2 B/R Flat | Ready | 1 370 sqft | AED 1 670 000 | 1 219 |
| 16 Sep 2026 | 1 B/R Flat | Ready | 771 sqft | AED 1 000 000 | 1 297 |
| 15 Sep 2026 | 2 B/R Flat | Ready | 1 155 sqft | AED 1 735 000 | 1 502 |
| 14 Sep 2026 | 1 B/R Flat | Ready | 765 sqft | AED 1 010 000 | 1 320 |
| 10 Sep 2026 | 2 B/R Flat | Ready | 1 182 sqft | AED 1 670 000 | 1 413 |
| 9 Sep 2026 | 2 B/R Flat | Ready | 1 141 sqft | AED 1 717 500 | 1 505 |
| 7 Sep 2026 | Studio Flat | Ready | 380 sqft | AED 615 000 | 1 620 |
| 4 Sep 2026 | Studio Flat | Ready | 382 sqft | AED 640 000 | 1 676 |
| 2 Sep 2026 | 1 B/R Flat | Ready | 782 sqft | AED 970 000 | 1 240 |
| 31 Aug 2026 | Studio Flat | Ready | 379 sqft | AED 615 000 | 1 622 |
| 25 Aug 2026 | 1 B/R Flat | Ready | 801 sqft | AED 1 050 000 | 1 311 |
| 19 Aug 2026 | 2 B/R Flat | Ready | 1 141 sqft | AED 1 730 000 | 1 516 |
Source: Registered DLD transactions · Data through 24 Nov 2026 · individual registrations, shown exactly as recorded, without trimming · Methodology v1.0 ↗
Every registration, on request
The full DLD record for Jannat: every registered sale, mortgage and gift, and every Ejari rent contract. It loads only when you ask; filter, sort and download it as CSV.
Registered sales by year
registered sales per calendar year; the current year is incomplete
By month
registered sales per month, Nov 2025 – Oct 2026
| Year | Sales | Median price | Median AED/sqft | Total registered value |
|---|---|---|---|---|
| 2026 | 50 | AED 1.05M | 1 408 | AED 62.26M |
| 2025 | 121 | AED 1.46M | 1 248 | AED 150.59M |
| 2024 | 259 | AED 938k | 1 233 | AED 247.22M |
| 2023 | 1 | — | — | AED 947k |
Source: Registered DLD transactions · Data through 24 Nov 2026 · calendar years; the current year is partial · Methodology v1.0 ↗
Price and sales, month by month
| Month | Sales | Median price | Median AED/sqft | IQR AED/sqft |
|---|---|---|---|---|
| Sep 2026 | 13 | AED 1.67M | 1 453 | 1 297 – 1 506 |
| Aug 2026 | 7 | AED 1.01M | 1 401 | 1 316 – 1 569 |
| Jul 2026 | 8 | AED 1.32M | 1 427 | 1 347 – 1 492 |
| Jun 2026 | 3 | — | — | — |
| May 2026 | 2 | — | — | — |
| Apr 2026 | 1 | — | — | — |
| Mar 2026 | 4 | — | — | — |
| Feb 2026 | 5 | AED 940k | 1 321 | 1 321 – 1 463 |
| Jan 2026 | 3 | — | — | — |
| Dec 2025 | 6 | AED 1.48M | 1 295 | 1 272 – 1 318 |
| Nov 2025 | 1 | — | — | — |
| Oct 2025 | 4 | — | — | — |
| Sep 2025 | 1 | — | — | — |
Source: Registered DLD transactions · Data through 24 Nov 2026 · complete months only; the current month is excluded because DLD keeps registering it · Methodology v1.0 ↗
Buildings in this project
| Building (DLD name) | Sales | Median price | Median AED/sqft | Off-plan |
|---|---|---|---|---|
| Dania 4 insufficient data | 0 | — | — | — |
| Afnan 4 insufficient data | 0 | — | — | — |
| Mesk 2 insufficient data | 0 | — | — | — |
| Noor 1 insufficient data | 0 | — | — | — |
| Noor 5 insufficient data | 0 | — | — | — |
| Mesk 1 insufficient data | 0 | — | — | — |
| Dania 1 insufficient data | 0 | — | — | — |
| Afnan 1 insufficient data | 0 | — | — | — |
| Afnan 3 insufficient data | 0 | — | — | — |
| Afnan 5 insufficient data | 0 | — | — | — |
| Afnan 2 insufficient data | 0 | — | — | — |
| Dania 3 insufficient data | 0 | — | — | — |
| Noor 4 insufficient data | 0 | — | — | — |
| Dania 2 insufficient data | 0 | — | — | — |
| Noor 3 insufficient data | 0 | — | — | — |
| Noor 2 insufficient data | 0 | — | — | — |
Source: Registered DLD transactions · Data through 24 Nov 2026 · outlier-trimmed median, complete months only · Methodology v1.0 ↗
What these numbers do not show
- Prices from the developer. Nothing here is a price list, a payment plan or availability — these are transactions already registered with DLD.
- Whether construction is moving. The completion percentage is the figure recorded at the last technical inspection, and inspections are irregular: an unchanged number does not mean work stopped.
- A handover promise. The declared completion date is a registry field, not a commitment.
- Asking prices. Everything here is a registered transaction; what a home was listed at is a different number.
- Off-market and cash-equivalent deals that never reach the registry, and the price actually negotiated before registration.
- Service charges, chiller fees, agency commission, DLD transfer fees or mortgage costs — none of them are inside these prices.
Where this project sits
More projects in International Media Production Zone
Questions about Jannat
Who is the developer of Jannat?
The Dubai Land Department project registry lists Deyaar Development (P.J.S.C) as the developer of Jannat.
Is Jannat completed?
The DLD registry status of Jannat is Finished, 100% complete at the last DLD inspection.
How many homes are in Jannat?
The DLD registry records 362 units in Jannat.
What is the price per square foot in Jannat?
Over the last 12 complete months the median registered sale in Jannat was AED 1.05M, or AED 1 367 per sqft, from 57 registered sales. These are DLD registrations, not asking prices.
Who holds the escrow account for Jannat?
The escrow agent recorded by DLD for Jannat is Dubai Islamic Bank (Public Joint Stock Company).
Where is Jannat?
Jannat is in the International Media Production Zone community.
Where does this data come from?
From Dubai Land Department open data — the project registry, unit register and registered sales — rebuilt every night. Data through 24 Nov 2026.
Source: DLD project registry, unit register and registered sales · Data through 24 Nov 2026 · answers built from registry fields · Methodology v1.0 ↗
Put this project on your website
Paste this code into any page to show the price-per-sqft chart and the latest registered sales for Jannat. It updates every night by itself and always carries the source line and a link back here — that link is the only condition of reuse. Preview · data API and other embeds.