Midtown - Dania
Updated 24 Nov 2026 · latest DLD registrations 24 Nov 2026 · DLD project registry and registered sales · trailing 12 months Nov 2025 – Oct 2026
Ask an AI about Midtown - Dania: ChatGPT · Claude · Perplexity
Midtown - Dania is a project by Deyaar Development (P.J.S.C), recorded at 100% complete at its last Dubai Land Department inspection. 40 sales registered in the trailing 12 months at a median AED 770k (1 271 AED per square foot). Registry facts come from DLD; prices are registered transactions, not asking prices.
Source: Registered DLD transactions · Data through 24 Nov 2026 · sample 40 records · outlier-trimmed median, complete months only · Methodology v1.0 ↗
What the DLD registry says about this project
| Field | Value |
|---|---|
| Developer | Deyaar Development (P.J.S.C) |
| Status | Finished |
| Construction progress | 100% — at the last DLD inspection |
| Registered with DLD | 2 Mar 2016 |
| Construction started | 1 Nov 2016 |
| Declared completion | 1 Mar 2020 — registry date, not a handover promise |
| Units in the project | 591 |
| Project area | 186 157 sqm |
| Escrow agent | Dubai Islamic Bank (Public Joint Stock Company) |
| Project number | 1731 |
Source: DLD project registry (Mashrooi) · Data through 24 Nov 2026 · registry fields as recorded, not developer marketing · Methodology v1.0 ↗
Price per square foot, month by month
median interquartile range (middle 50% of transactions)
Source: Registered DLD transactions · Data through 24 Nov 2026 · monthly medians, months with fewer than 5 registered sales are left blank · Methodology v1.0 ↗
Construction, inspection by inspection
The DLD registry holds 11 technical inspections for this project, from 29 Nov 2016 at 2.0% to 1 Mar 2020 at 100.0%. The last inspection recorded it complete. Inspections are irregular and the percentage is what was recorded at each one, not a live measure of the site.
each dot is one DLD technical inspection; the line between two of them is drawn, not measured; the dashed mark is the completion date declared in the registry
| Inspection | Recorded | Change |
|---|---|---|
| 1 Mar 2020 | 100.0% | +8.7 pp |
| 11 Nov 2019 | 91.3% | +11.0 pp |
| 21 Jul 2019 | 80.3% | +12.7 pp |
| 4 Mar 2019 | 67.6% | +17.4 pp |
| 17 Oct 2018 | 50.2% | +9.8 pp |
| 2 Aug 2018 | 40.3% | +10.1 pp |
| 8 Apr 2018 | 30.2% | +18.4 pp |
| 13 Dec 2017 | 11.8% | +7.8 pp |
| 31 Jul 2017 | 4.0% | +0.5 pp |
| 27 Mar 2017 | 3.5% | +1.5 pp |
| 29 Nov 2016 | 2.0% | — |
Source: DLD project registry (Mashrooi) — technical inspections · Data through 24 Nov 2026 · percentage as recorded at each inspection; inspections are irregular, and an unchanged value means no new inspection, not that work stopped · Methodology v1.0 ↗
By number of bedrooms
| Homes | Sales | Median price | Median AED/sqft | Median size | Median rent | Gross yield |
|---|---|---|---|---|---|---|
| Studios low sample (14) | 14 | AED 570k | 1 321 | 433 sqft | — | — |
| 1-bedroom apartments low sample (15) | 15 | AED 798k | 1 203 | 660 sqft | — | — |
| 2-bedroom apartments low sample (11) | 11 | AED 1.40M | 1 275 | 1 083 sqft | — | — |
Source: Registered DLD sales and Ejari rental contracts · Data through 24 Nov 2026 · yield shown only where at least 15 rents and 15 ready-home sales support it · Methodology v1.0 ↗
Latest registered sales
| Date | Property | Registration | Size | Price | AED/sqft |
|---|---|---|---|---|---|
| 23 Nov 2026 | Studio Flat — DANIA 2 | Ready | 427 sqft | AED 505 000 | 1 183 |
| 19 Nov 2026 | Studio Flat — DANIA 2 | Ready | 665 sqft | AED 610 000 | 918 |
| 18 Nov 2026 | 1 B/R Flat — DANIA 2 | Ready | 621 sqft | AED 775 000 | 1 247 |
| 18 Nov 2026 | 1 B/R Flat — DANIA 3 | Ready | 634 sqft | AED 750 000 | 1 183 |
| 18 Nov 2026 | 3 B/R Flat — DANIA 4 | Ready | 1 672 sqft | AED 2 100 000 | 1 256 |
| 18 Nov 2026 | 2 B/R Flat — DANIA 2 | Ready | 969 sqft | AED 934 104 | 964 |
| 20 Oct 2026 | 2 B/R Flat — DANIA 4 | Ready | 1 100 sqft | AED 1 470 000 | 1 336 |
| 16 Oct 2026 | 1 B/R Flat — DANIA 3 | Ready | 634 sqft | AED 652 000 | 1 029 |
| 16 Oct 2026 | Studio Flat — DANIA 2 | Ready | 441 sqft | AED 585 000 | 1 327 |
| 13 Oct 2026 | Studio Flat — DANIA 3 | Ready | 441 sqft | AED 550 000 | 1 247 |
| 8 Oct 2026 | Studio Flat — DANIA 3 | Ready | 441 sqft | AED 510 201 | 1 157 |
| 9 Sep 2026 | 1 B/R Flat — DANIA 1 | Ready | 660 sqft | AED 790 000 | 1 198 |
| 9 Sep 2026 | 1 B/R Flat — DANIA 4 | Ready | 762 sqft | AED 770 000 | 1 010 |
| 7 Sep 2026 | 1 B/R Flat — DANIA 3 | Ready | 663 sqft | AED 755 000 | 1 139 |
| 3 Sep 2026 | 2 B/R Flat — DANIA 2 | Ready | 969 sqft | AED 1 200 000 | 1 239 |
| 2 Sep 2026 | 1 B/R Flat — DANIA 1 | Ready | 657 sqft | AED 838 509 | 1 276 |
| 14 Aug 2026 | Studio Flat — DANIA 2 | Ready | 433 sqft | AED 550 000 | 1 271 |
| 3 Aug 2026 | 2 B/R Flat — DANIA 2 | Ready | 969 sqft | AED 1 220 000 | 1 259 |
| 31 Jul 2026 | 1 B/R Flat — DANIA 2 | Ready | 621 sqft | AED 34 291 | 55 |
| 23 Jul 2026 | 2 B/R Flat — DANIA 4 | Ready | 1 083 sqft | AED 1 410 000 | 1 302 |
| 17 Jul 2026 | 1 B/R Flat — DANIA 2 | Ready | 621 sqft | AED 750 000 | 1 207 |
| 15 Jul 2026 | Studio Flat — DANIA 2 | Ready | 441 sqft | AED 520 000 | 1 179 |
| 4 Jun 2026 | Studio Flat — DANIA 2 | Ready | 427 sqft | AED 590 000 | 1 382 |
| 14 May 2026 | 1 B/R Flat — DANIA 4 | Ready | 762 sqft | AED 948 780 | 1 244 |
Source: Registered DLD transactions · Data through 24 Nov 2026 · individual registrations, shown exactly as recorded, without trimming · Methodology v1.0 ↗
Every registration, on request
The full DLD record for Midtown - Dania: every registered sale, mortgage and gift, and every Ejari rent contract. It loads only when you ask; filter, sort and download it as CSV.
Registered sales by year
registered sales per calendar year; the current year is incomplete
By month
registered sales per month, Nov 2025 – Oct 2026
| Year | Sales | Median price | Median AED/sqft | Total registered value |
|---|---|---|---|---|
| 2026 | 30 | AED 830k | 1 259 | AED 27.02M |
| 2025 | 81 | AED 780k | 1 207 | AED 67.10M |
| 2024 | 108 | AED 752k | 1 134 | AED 85.06M |
| 2023 | 50 | AED 842k | 1 001 | AED 41.91M |
| 2022 | 41 | AED 650k | 1 236 | AED 29.96M |
| 2021 | 108 | AED 714k | 1 078 | AED 85.38M |
| 2020 | 27 | AED 920k | 988 | AED 22.10M |
| 2019 | 47 | AED 785k | 1 030 | AED 38.51M |
| 2018 | 101 | AED 713k | 1 064 | AED 79.87M |
| 2017 | 115 | AED 712k | 1 128 | AED 88.98M |
| 2016 | 52 | AED 692k | 1 104 | AED 37.93M |
Source: Registered DLD transactions · Data through 24 Nov 2026 · calendar years; the current year is partial · Methodology v1.0 ↗
Rent and gross yield by year, 2020–2026
1-bed flat: median annual rent, AED, of new and renewed Ejari contracts by start year; band = middle half of contracts
| Year | Studio | 1-bed flat | 2-bed flat | Gross yield |
|---|---|---|---|---|
| 2026 YTD | 44k | 63k | 88k | — |
| 2025 | 45k | 65k | 90k | 8.22% |
| 2024 | 38k | 60k | 75k | 7.99% |
| 2023 | 30k | 42k | 66k | 6.05% |
| 2022 | 25k | 37k | 56k | 4.37% |
| 2021 | 22k | 33k | 50k | 4.58% |
| 2020 | 22k | 32k | 50k | — |
Source: Ejari rental contracts and registered DLD sales · Data through 24 Nov 2026 · median annual rent per year a contract starts, shown from 15 contracts; yield = median rent ÷ median ready-home price of the same year and home type, from 15 of each · Methodology v1.0 ↗
Price and sales, month by month
| Month | Sales | Median price | Median AED/sqft | IQR AED/sqft |
|---|---|---|---|---|
| Oct 2026 | 5 | AED 585k | 1 247 | 1 157 – 1 327 |
| Sep 2026 | 5 | AED 790k | 1 198 | 1 139 – 1 239 |
| Aug 2026 | 2 | — | — | — |
| Jul 2026 | 3 | — | — | — |
| Jun 2026 | 1 | — | — | — |
| May 2026 | 1 | — | — | — |
| Apr 2026 | 3 | — | — | — |
| Mar 2026 | 3 | — | — | — |
| Feb 2026 | 4 | — | — | — |
| Jan 2026 | 2 | — | — | — |
| Dec 2025 | 8 | AED 578k | 1 319 | 1 233 – 1 328 |
| Nov 2025 | 2 | — | — | — |
| Oct 2025 | 5 | AED 795k | 1 280 | 1 280 – 1 287 |
Source: Registered DLD transactions · Data through 24 Nov 2026 · complete months only; the current month is excluded because DLD keeps registering it · Methodology v1.0 ↗
Buildings in this project
| Building (DLD name) | Sales | Median price | Median AED/sqft | Off-plan |
|---|---|---|---|---|
| Dania 2 low sample (16) | 16 | AED 750k | 1 259 | 0.0% |
| Dania 4 low sample (11) | 11 | AED 1.40M | 1 275 | 0.0% |
| Dania 3 low sample (11) | 11 | AED 580k | 1 271 | 0.0% |
| Dania 1 insufficient data | 2 | — | — | 0.0% |
| Noor 1 insufficient data | 0 | — | — | — |
| Afnan 5 insufficient data | 0 | — | — | — |
| Mesk 1 insufficient data | 0 | — | — | — |
| Mesk 2 insufficient data | 0 | — | — | — |
| Afnan 4 insufficient data | 0 | — | — | — |
| Noor 4 insufficient data | 0 | — | — | — |
| Noor 5 insufficient data | 0 | — | — | — |
| Afnan 1 insufficient data | 0 | — | — | — |
| Noor 2 insufficient data | 0 | — | — | — |
| Afnan 2 insufficient data | 0 | — | — | — |
| Noor 3 insufficient data | 0 | — | — | — |
| Jannat insufficient data | 0 | — | — | — |
| Afnan 3 insufficient data | 0 | — | — | — |
Source: Registered DLD transactions · Data through 24 Nov 2026 · outlier-trimmed median, complete months only · Methodology v1.0 ↗
What these numbers do not show
- Prices from the developer. Nothing here is a price list, a payment plan or availability — these are transactions already registered with DLD.
- Whether construction is moving. The completion percentage is the figure recorded at the last technical inspection, and inspections are irregular: an unchanged number does not mean work stopped.
- A handover promise. The declared completion date is a registry field, not a commitment.
- Asking prices. Everything here is a registered transaction; what a home was listed at is a different number.
- Off-market and cash-equivalent deals that never reach the registry, and the price actually negotiated before registration.
- Service charges, chiller fees, agency commission, DLD transfer fees or mortgage costs — none of them are inside these prices.
Where this project sits
More projects in International Media Production Zone
Questions about Midtown - Dania
Who is the developer of Midtown - Dania?
The Dubai Land Department project registry lists Deyaar Development (P.J.S.C) as the developer of Midtown - Dania.
Is Midtown - Dania completed?
The DLD registry status of Midtown - Dania is Finished, 100% complete at the last DLD inspection. The declared completion date in the registry is 1 Mar 2020 — a registry date, not a handover promise.
How many homes are in Midtown - Dania?
The DLD registry records 591 units in Midtown - Dania.
What is the price per square foot in Midtown - Dania?
Over the last 12 complete months the median registered sale in Midtown - Dania was AED 770k, or AED 1 271 per sqft, from 40 registered sales. These are DLD registrations, not asking prices.
Who holds the escrow account for Midtown - Dania?
The escrow agent recorded by DLD for Midtown - Dania is Dubai Islamic Bank (Public Joint Stock Company).
Where is Midtown - Dania?
Midtown - Dania is in the International Media Production Zone community.
Where does this data come from?
From Dubai Land Department open data — the project registry, unit register and registered sales — rebuilt every night. Data through 24 Nov 2026.
Source: DLD project registry, unit register and registered sales · Data through 24 Nov 2026 · answers built from registry fields · Methodology v1.0 ↗