Data Dubai

Midtown - Mesk

Midtown - MeskFinished100% built282 homesDLD data through 24 Nov 2026

Updated 24 Nov 2026 · latest DLD registrations 24 Nov 2026 · DLD project registry and registered sales · trailing 12 months Nov 2025 – Oct 2026

Ask an AI about Midtown - Mesk: ChatGPT · Claude · Perplexity

Midtown - Mesk is a project by Deyaar Development (P.J.S.C), recorded at 100% complete at its last Dubai Land Department inspection. 33 sales registered in the trailing 12 months at a median AED 1.47M (1 250 AED per square foot). Registry facts come from DLD; prices are registered transactions, not asking prices.

Median sale price
AED 1.47M +0.7% y/y
≈ US$ 399k · typical range AED 1.03M – AED 1.50M
DLD verified
Median price per sqft
AED 1 250/sqft -0.1% y/y
typical range 1 208 – 1 335 AED/sqft
DLD verified
Registered sales
33 -54.8% y/y
all property types · trailing 12 complete months
DLD verified
Off-plan share
0.0%
of registered sales in the window
DLD verified

Source: Registered DLD transactions · Data through 24 Nov 2026 · sample 33 records · outlier-trimmed median, complete months only · Methodology v1.0 ↗

What the DLD registry says about this project

FieldValue
DeveloperDeyaar Development (P.J.S.C)
StatusFinished
Construction progress100% — at the last DLD inspection
Registered with DLD27 Feb 2020
Construction started29 Feb 2020
Declared completion31 Aug 2022 — registry date, not a handover promise
Units in the project282
Project area186 585 sqm
Escrow agentDubai Islamic Bank (Public Joint Stock Company)
Project number2211

Source: DLD project registry (Mashrooi) · Data through 24 Nov 2026 · registry fields as recorded, not developer marketing · Methodology v1.0 ↗

Price per square foot, month by month

1 0001 1001 2001 300Apr 2023Sep 2023Feb 2024Jul 2024Dec 2024May 2025Oct 2025Mar 2026Aug 20261 0001 1001 2001 300Apr 2023Jun 2024Aug 2025Oct 2026

median   interquartile range (middle 50% of transactions)

Source: Registered DLD transactions · Data through 24 Nov 2026 · monthly medians, months with fewer than 5 registered sales are left blank; the line stops at Nov 2025: in the 11 months since, no month reached the five registered sales a median needs (24 in total) · Methodology v1.0 ↗

Construction, inspection by inspection

The DLD registry holds 7 technical inspections for this project, from 28 Sep 2020 at 1.0% to 3 Jan 2023 at 100.0%. The last inspection recorded it complete. Inspections are irregular and the percentage is what was recorded at each one, not a live measure of the site.

0%25%50%75%100%declared 2022-08-312020-09-282023-01-03

each dot is one DLD technical inspection; the line between two of them is drawn, not measured; the dashed mark is the completion date declared in the registry

InspectionRecordedChange
3 Jan 2023100.0% +19.5 pp
17 Aug 202280.5% +28.6 pp
4 Feb 202251.9% +17.9 pp
3 Nov 202134.1% +13.4 pp
24 Jun 202120.7% +10.5 pp
4 Mar 202110.2% +9.2 pp
28 Sep 20201.0% —

Source: DLD project registry (Mashrooi) — technical inspections · Data through 24 Nov 2026 · percentage as recorded at each inspection; inspections are irregular, and an unchanged value means no new inspection, not that work stopped · Methodology v1.0 ↗

By number of bedrooms

HomesSalesMedian priceMedian AED/sqftMedian sizeMedian rentGross yield
Studios insufficient data 2— — — — —
1-bedroom apartments low sample (11) 11AED 1.02M 1 250 787 sqft — —
2-bedroom apartments 20AED 1.49M 1 261 1 191 sqft — —

Source: Registered DLD sales and Ejari rental contracts · Data through 24 Nov 2026 · yield shown only where at least 15 rents and 15 ready-home sales support it · Methodology v1.0 ↗

Latest registered sales

DatePropertyRegistrationSizePriceAED/sqft
4 Nov 20262 B/R Flat — MESK 2Ready 1 214 sqftAED 1 650 000 1 359
30 Oct 20262 B/R Flat — MESK 2Ready 1 140 sqftAED 1 510 000 1 324
15 Oct 20262 B/R Flat — MESK 2Ready 1 191 sqftAED 1 485 222 1 247
1 Sep 20262 B/R Flat — MESK 2Ready 1 227 sqftAED 1 550 000 1 263
7 Aug 20262 B/R Flat — MESK 2Ready 1 164 sqftAED 1 500 000 1 289
30 Jul 20261 B/R Flat — MESK 1Ready 899 sqftAED 1 070 000 1 190
23 Jul 20262 B/R Flat — MESK 1Ready 1 043 sqftAED 1 400 000 1 342
6 Jul 20261 B/R Flat — MESK 1Ready 667 sqftAED 833 430 1 250
23 Jun 20261 B/R Flat — MESK 1Ready 786 sqftAED 925 000 1 176
8 Jun 20262 B/R Flat — MESK 2Ready 1 191 sqftAED 1 487 558 1 249
27 Apr 2026Studio Flat — MESK 1Ready 697 sqftAED 750 000 1 076
23 Apr 20261 B/R Flat — MESK 2Ready 832 sqftAED 1 018 534 1 225
14 Apr 20262 B/R Flat — MESK 1Ready 1 044 sqftAED 1 525 000 1 461
31 Mar 20261 B/R Flat — MESK 2Ready 832 sqftAED 1 100 000 1 323
5 Mar 20261 B/R Flat — MESK 1Ready 787 sqftAED 1 050 000 1 335
24 Feb 2026Studio Flat — MESK 1Ready 788 sqftAED 800 000 1 015
17 Feb 20262 B/R Flat — MESK 2Ready 1 140 sqftAED 1 408 217 1 235
8 Jan 20262 B/R Flat — MESK 1Ready 1 040 sqftAED 1 490 000 1 433
7 Jan 20261 B/R Flat — MESK 1Ready 786 sqftAED 1 050 000 1 335
6 Jan 20262 B/R Flat — MESK 2Ready 1 214 sqftAED 1 467 026 1 208
5 Jan 20262 B/R Flat — MESK 2Ready 1 512 sqftAED 1 618 985 1 071
25 Dec 20251 B/R Flat — MESK 1Ready 667 sqftAED 955 000 1 433
18 Dec 20252 B/R Flat — MESK 2Ready 1 164 sqftAED 1 469 907 1 263
16 Dec 20251 B/R Flat — MESK 2Ready 788 sqftAED 969 169 1 230

Source: Registered DLD transactions · Data through 24 Nov 2026 · individual registrations, shown exactly as recorded, without trimming · Methodology v1.0 ↗

Every registration, on request

The full DLD record for Midtown - Mesk: every registered sale, mortgage and gift, and every Ejari rent contract. It loads only when you ask; filter, sort and download it as CSV.

Registered sales by year

0100200202320242025202601002002023202420252026

registered sales per calendar year; the current year is incomplete

By month

0258NovDecJanFebMarAprMayJunJulAugSepOct0258DecFebAprJunAugOct

registered sales per month, Nov 2025 – Oct 2026

YearSalesMedian priceMedian AED/sqftTotal registered value
202620AED 1.40M 1 249AED 25.04M
202584AED 1.46M 1 250AED 117.21M
202429AED 1.07M 1 170AED 33.23M
2023190AED 1.10M 1 121AED 221.73M

Source: Registered DLD transactions · Data through 24 Nov 2026 · calendar years; the current year is partial · Methodology v1.0 ↗

Rent and gross yield by year, 2023–2026

Median annual rent, AED thousand
Year1-bed flat2-bed flatGross yield
2026 YTD 76k105k—
2025 72k95k6.90%
2024 65k88k6.59%
2023 60k65k5.84%

Source: Ejari rental contracts and registered DLD sales · Data through 24 Nov 2026 · median annual rent per year a contract starts, shown from 15 contracts; yield = median rent ÷ median ready-home price of the same year and home type, from 15 of each · Methodology v1.0 ↗

Price and sales, month by month

MonthSalesMedian priceMedian AED/sqftIQR AED/sqft
Nov 20259 AED 1.48M1 246 1 208 – 1 268
Oct 20256 AED 1.47M1 233 1 214 – 1 242
Sep 20251 —— —
Aug 202516 AED 1.47M1 248 1 236 – 1 255
Jul 202522 AED 1.47M1 251 1 246 – 1 267
Jun 202510 AED 1.46M1 285 1 251 – 1 344
May 20258 AED 994k1 250 1 225 – 1 336
Apr 20250 —— —
Mar 20251 —— —
Feb 20255 AED 1.35M1 176 1 118 – 1 298
Jan 20252 —— —
Dec 20241 —— —
Nov 20241 —— —

Source: Registered DLD transactions · Data through 24 Nov 2026 · complete months only; the current month is excluded because DLD keeps registering it · Methodology v1.0 ↗

Buildings in this project

Building (DLD name)SalesMedian priceMedian AED/sqftOff-plan
Mesk 2 low sample (19) 19AED 1.49M 1 2470.0%
Mesk 1 low sample (14) 14AED 1.05M 1 3350.0%
Dania 4 insufficient data 0— ——
Noor 5 insufficient data 0— ——
Afnan 3 insufficient data 0— ——
Dania 2 insufficient data 0— ——
Afnan 1 insufficient data 0— ——
Dania 1 insufficient data 0— ——
Noor 2 insufficient data 0— ——
Noor 1 insufficient data 0— ——
Noor 4 insufficient data 0— ——
Afnan 4 insufficient data 0— ——
Dania 3 insufficient data 0— ——
Noor 3 insufficient data 0— ——
Jannat insufficient data 0— ——
Afnan 2 insufficient data 0— ——
Afnan 5 insufficient data 0— ——

Source: Registered DLD transactions · Data through 24 Nov 2026 · outlier-trimmed median, complete months only · Methodology v1.0 ↗

What these numbers do not show

  • Prices from the developer. Nothing here is a price list, a payment plan or availability — these are transactions already registered with DLD.
  • Whether construction is moving. The completion percentage is the figure recorded at the last technical inspection, and inspections are irregular: an unchanged number does not mean work stopped.
  • A handover promise. The declared completion date is a registry field, not a commitment.
  • Asking prices. Everything here is a registered transaction; what a home was listed at is a different number.
  • Off-market and cash-equivalent deals that never reach the registry, and the price actually negotiated before registration.
  • Service charges, chiller fees, agency commission, DLD transfer fees or mortgage costs — none of them are inside these prices.

Where this project sits

More projects in International Media Production Zone

Questions about Midtown - Mesk

Who is the developer of Midtown - Mesk?

The Dubai Land Department project registry lists Deyaar Development (P.J.S.C) as the developer of Midtown - Mesk.

Is Midtown - Mesk completed?

The DLD registry status of Midtown - Mesk is Finished, 100% complete at the last DLD inspection. The declared completion date in the registry is 31 Aug 2022 — a registry date, not a handover promise.

How many homes are in Midtown - Mesk?

The DLD registry records 282 units in Midtown - Mesk.

What is the price per square foot in Midtown - Mesk?

Over the last 12 complete months the median registered sale in Midtown - Mesk was AED 1.47M, or AED 1 250 per sqft, from 33 registered sales. These are DLD registrations, not asking prices.

Who holds the escrow account for Midtown - Mesk?

The escrow agent recorded by DLD for Midtown - Mesk is Dubai Islamic Bank (Public Joint Stock Company).

Where is Midtown - Mesk?

Midtown - Mesk is in the International Media Production Zone community.

Where does this data come from?

From Dubai Land Department open data — the project registry, unit register and registered sales — rebuilt every night. Data through 24 Nov 2026.

Source: DLD project registry, unit register and registered sales · Data through 24 Nov 2026 · answers built from registry fields · Methodology v1.0 ↗

Cite or reuse this data

Machine-readable mirrors of this page: Markdown · JSON · llms.txt. How to cite: “Midtown - Mesk — Data Dubai, Continental Club Property, data through 24 Nov 2026, https://datadubai.ae/projects/midtown-mesk/”. Reuse is permitted with attribution.