Mudon Al Ranim 4
Data through 22 Oct 2026 · DLD project registry and registered sales · trailing 12 months Oct 2025 – Sep 2026 · rebuilt daily
Mudon Al Ranim 4 is a project by Mdn Real Estate L.L.C, recorded at 100% complete at its last Dubai Land Department inspection. 55 sales registered in the trailing 12 months at a median AED 3.75M (1 747 AED per square foot). Registry facts come from DLD; prices are registered transactions, not asking prices.
Source: Registered DLD transactions · Data through 22 Oct 2026 · sample 55 records · outlier-trimmed median, complete months only · Methodology v1.0 ↗
What the DLD registry says about this project
| Field | Value | Provenance |
|---|---|---|
| Developer | Mdn Real Estate L.L.C | DLD verified |
| Status | Finished | DLD verified |
| Construction progress | 100% — at the last DLD inspection | DLD verified |
| Registered with DLD | 19 Jan 2023 | DLD verified |
| Construction started | 1 Mar 2023 | DLD verified |
| Declared completion | 31 May 2026 — registry date, not a handover promise | DLD verified |
| Units in the project | 134 | DLD verified |
| Project area | 29 704 sqm | DLD verified |
| Escrow agent | First Abu Dhabi Bank P.J.S.C. | DLD verified |
| Project number | 2549 | DLD verified |
Source: DLD project registry (Mashrooi) · Data through 22 Oct 2026 · registry fields as recorded, not developer marketing · Methodology v1.0 ↗
Price per square foot, month by month
median interquartile range (middle 50% of transactions)
Source: Registered DLD transactions · Data through 22 Oct 2026 · monthly medians, months with fewer than 5 registered sales are left blank; the line stops at Aug 2026: in the 1 months since, no month reached the five registered sales a median needs (1 in total) · Methodology v1.0 ↗
Construction, inspection by inspection
The DLD registry holds 9 technical inspections for this project, from 11 Jan 2023 at 0.0% to 15 Jan 2026 at 100.0%. The last inspection recorded it complete. Inspections are irregular and the percentage is what was recorded at each one, not a live measure of the site.
each dot is one DLD technical inspection; the line between two of them is drawn, not measured; the dashed mark is the completion date declared in the registry
| Inspection | Recorded | Change |
|---|---|---|
| 15 Jan 2026 | 100.0% | +1.6 pp |
| 31 Oct 2025 | 98.4% | +8.2 pp |
| 1 Aug 2025 | 90.3% | +5.5 pp |
| 1 May 2025 | 84.8% | +24.2 pp |
| 20 Jan 2025 | 60.6% | +24.6 pp |
| 24 Sep 2024 | 36.1% | +21.8 pp |
| 6 Mar 2024 | 14.3% | +12.9 pp |
| 19 Sep 2023 | 1.4% | +1.4 pp |
| 11 Jan 2023 | 0.0% | — |
Source: DLD project registry (Mashrooi) — technical inspections · Data through 22 Oct 2026 · percentage as recorded at each inspection; inspections are irregular, and an unchanged value means no new inspection, not that work stopped · Methodology v1.0 ↗
The same figures as a table
| Month | Sales | Median price | Median AED/sqft | IQR AED/sqft |
|---|---|---|---|---|
| Aug 2026 | 7 | AED 4.10M | 1 588 | 1 406 – 1 776 |
| Jul 2026 | 3 | — | — | — |
| Jun 2026 | 13 | AED 3.60M | 1 750 | 1 588 – 1 763 |
| May 2026 | 3 | — | — | — |
| Apr 2026 | 9 | AED 4.25M | 1 803 | 1 561 – 2 009 |
| Mar 2026 | 4 | — | — | — |
| Feb 2026 | 1 | — | — | — |
| Jan 2026 | 4 | — | — | — |
| Dec 2025 | 2 | — | — | — |
| Nov 2025 | 3 | — | — | — |
| Oct 2025 | 5 | AED 3.38M | 1 785 | 1 690 – 1 869 |
| Sep 2025 | 3 | — | — | — |
| Aug 2025 | 2 | — | — | — |
Source: Registered DLD transactions · Data through 22 Oct 2026 · complete months only; the current month is excluded because DLD keeps registering it · Methodology v1.0 ↗
By number of bedrooms
| Homes | Sales | Median price | Median AED/sqft | Median size | Median rent | Gross yield |
|---|---|---|---|---|---|---|
| 3-bedroom apartments | 32 | AED 3.39M | 1 818 | 1 849 sqft | — | — |
| 4-bedroom apartments | 23 | AED 4.55M | 1 539 | 2 874 sqft | — | — |
Source: Registered DLD sales and Ejari rental contracts · Data through 22 Oct 2026 · yield shown only where at least 15 rents and 15 ready-home sales support it · Methodology v1.0 ↗
Registered sales by year
median interquartile range (middle 50% of transactions)
| Year | Sales | Median price | Median AED/sqft | Total registered value |
|---|---|---|---|---|
| 2026 | 45 | AED 4.10M | 1 750 | AED 182.05M |
| 2025 | 28 | AED 3.19M | 1 493 | AED 92.92M |
| 2024 | 27 | AED 2.70M | 1 257 | AED 74.66M |
| 2023 | 133 | AED 2.52M | 1 136 | AED 342.00M |
Source: Registered DLD transactions · Data through 22 Oct 2026 · calendar years; the current year is partial · Methodology v1.0 ↗
Latest registered sales
| Date | Property | Registration | Size | Price | AED/sqft |
|---|---|---|---|---|---|
| 4 Sep 2026 | 4 B/R Villa — Mudon Al Ranim 4 | Ready | 2 685 sqft | AED 5 425 000 | 2 021 |
| 27 Aug 2026 | 4 B/R Villa — Mudon Al Ranim 4 | Ready | 3 590 sqft | AED 4 875 000 | 1 358 |
| 27 Aug 2026 | 4 B/R Villa — Mudon Al Ranim 4 | Ready | 3 337 sqft | AED 5 300 000 | 1 588 |
| 26 Aug 2026 | 3 B/R Villa — Mudon Al Ranim 4 | Ready | 1 953 sqft | AED 3 400 000 | 1 741 |
| 14 Aug 2026 | 4 B/R Villa — Mudon Al Ranim 4 | Ready | 3 886 sqft | AED 4 900 000 | 1 261 |
| 13 Aug 2026 | 3 B/R Villa — Mudon Al Ranim 4 | Ready | 1 878 sqft | AED 3 675 000 | 1 957 |
| 3 Aug 2026 | 4 B/R Villa — Mudon Al Ranim 4 | Ready | 2 818 sqft | AED 4 100 000 | 1 455 |
| 3 Aug 2026 | 3 B/R Villa — Mudon Al Ranim 4 | Ready | 1 848 sqft | AED 3 350 000 | 1 812 |
| 7 Jul 2026 | 3 B/R Villa — Mudon Al Ranim 4 | Ready | 1 829 sqft | AED 3 300 000 | 1 804 |
| 3 Jul 2026 | 3 B/R Villa — Mudon Al Ranim 4 | Ready | 1 924 sqft | AED 3 300 000 | 1 716 |
| 2 Jul 2026 | 3 B/R Villa — Mudon Al Ranim 4 | Ready | 1 965 sqft | AED 4 100 000 | 2 087 |
| 26 Jun 2026 | 4 B/R Villa — Mudon Al Ranim 4 | Ready | 2 836 sqft | AED 4 999 999 | 1 763 |
Source: Registered DLD transactions · Data through 22 Oct 2026 · individual registrations, shown exactly as recorded, without trimming · Methodology v1.0 ↗
What these numbers do not show
- Prices from the developer. Nothing here is a price list, a payment plan or availability — these are transactions already registered with DLD.
- Whether construction is moving. The completion percentage is the figure recorded at the last technical inspection, and inspections are irregular: an unchanged number does not mean work stopped.
- A handover promise. The declared completion date is a registry field, not a commitment.
- Asking prices. Everything here is a registered transaction; what a home was listed at is a different number.
- Off-market and cash-equivalent deals that never reach the registry, and the price actually negotiated before registration.
- Service charges, chiller fees, agency commission, DLD transfer fees or mortgage costs — none of them are inside these prices.
Where this project sits
More projects in Mudon
For AI agents and researchers
Machine-readable mirrors of this page: Markdown · JSON · llms.txt. How to cite: “Mudon Al Ranim 4 — Dubai Data, Continental Club Property, data through 22 Oct 2026, https://datadubai.ae/projects/mudon-al-ranim-4/”. Reuse is permitted with attribution.
Put this project on your website
Paste this code into any page to show the price-per-sqft chart and the latest registered sales for Mudon Al Ranim 4. It updates every night by itself and always carries the source line and a link back here — that link is the only condition of reuse. Preview · data API and other embeds.