Data Dubai

Paramount Tower Hotel & Residences

Paramount Tower Hotel & ResidencesFinished100% built799 homesDLD data through 24 Nov 2026

Updated 24 Nov 2026 · latest DLD registrations 24 Nov 2026 · DLD project registry and registered sales · trailing 12 months Nov 2025 – Oct 2026

Ask an AI about Paramount Tower Hotel & Residences: ChatGPT · Claude · Perplexity

Paramount Tower Hotel & Residences is a project by Namaa Properties Development L.L.C, recorded at 100% complete at its last Dubai Land Department inspection. 35 sales registered in the trailing 12 months at a median AED 2.40M (2 053 AED per square foot). Registry facts come from DLD; prices are registered transactions, not asking prices.

Median sale price
AED 2.40M +9.1% y/y
≈ US$ 654k · typical range AED 1.68M – AED 2.69M
DLD verified
Median price per sqft
AED 2 053/sqft +6.7% y/y
typical range 1 953 – 2 106 AED/sqft
DLD verified
Registered sales
35 -40.7% y/y
all property types · trailing 12 complete months
DLD verified
Off-plan share
0.0%
of registered sales in the window
DLD verified

Source: Registered DLD transactions · Data through 24 Nov 2026 · sample 35 records · outlier-trimmed median, complete months only · Methodology v1.0 ↗

What the DLD registry says about this project

FieldValue
DeveloperNamaa Properties Development L.L.C
StatusFinished
Construction progress100% — at the last DLD inspection
Registered with DLD21 Jun 2015
Construction started1 Jul 2015
Declared completion29 Mar 2022 — registry date, not a handover promise
Units in the project799
Project area77 049 sqm
Escrow agentCommercial Bank Of Dubai(Psc)
Project number1665

Source: DLD project registry (Mashrooi) · Data through 24 Nov 2026 · registry fields as recorded, not developer marketing · Methodology v1.0 ↗

Price per square foot, month by month

1 5002 000Nov 2021Jun 2022Jan 2023Aug 2023Mar 2024Oct 2024May 2025Dec 2025Jul 20261 5002 000Nov 2021Jul 2023Mar 2025

median   interquartile range (middle 50% of transactions)

Source: Registered DLD transactions · Data through 24 Nov 2026 · monthly medians, months with fewer than 5 registered sales are left blank; the line stops at Jan 2026: in the 9 months since, no month reached the five registered sales a median needs (15 in total) · Methodology v1.0 ↗

Construction, inspection by inspection

The DLD registry holds 15 technical inspections for this project, from 1 Oct 2015 at 0.5% to 15 Nov 2021 at 100.0%. The last inspection recorded it complete. Inspections are irregular and the percentage is what was recorded at each one, not a live measure of the site.

0%25%50%75%100%declared 2022-03-292015-10-012021-11-15

each dot is one DLD technical inspection; the line between two of them is drawn, not measured; the dashed mark is the completion date declared in the registry

InspectionRecordedChange
15 Nov 2021100.0% +4.8 pp
26 Apr 202195.2% +7.2 pp
7 Oct 202088.0% +13.0 pp
23 Mar 202075.0% +9.9 pp
6 Nov 201965.1% +15.0 pp
16 Jun 201950.1% +15.0 pp
10 Dec 201835.0% +8.1 pp
26 Jul 201826.9% +2.9 pp
25 Mar 201824.0% +4.0 pp
20 Nov 201720.0% +4.0 pp
19 Jul 201716.0% +4.3 pp
16 Mar 201711.7% +2.5 pp
12 Jul 20169.2% +3.1 pp
8 Feb 20166.1% +5.6 pp
1 Oct 20150.5% —

Source: DLD project registry (Mashrooi) — technical inspections · Data through 24 Nov 2026 · percentage as recorded at each inspection; inspections are irregular, and an unchanged value means no new inspection, not that work stopped · Methodology v1.0 ↗

By number of bedrooms

HomesSalesMedian priceMedian AED/sqftMedian sizeMedian rentGross yield
1-bedroom apartments low sample (7) 7AED 1.79M 2 062 898 sqft — —
2-bedroom apartments low sample (16) 16AED 2.60M 2 036 1 289 sqft — —
3-bedroom apartments insufficient data 4— — — — —

Source: Registered DLD sales and Ejari rental contracts · Data through 24 Nov 2026 · yield shown only where at least 15 rents and 15 ready-home sales support it · Methodology v1.0 ↗

Latest registered sales

DatePropertyRegistrationSizePriceAED/sqft
24 Nov 20262 B/R FlatReady 1 321 sqftAED 2 500 000 1 893
23 Nov 20263 B/R FlatReady 1 645 sqftAED 3 200 000 1 945
15 Oct 20261 B/R FlatReady 679 sqftAED 1 400 000 2 062
15 Oct 20263 B/R FlatReady 1 644 sqftAED 2 742 651 1 669
7 Sep 20262 B/R FlatReady 1 167 sqftAED 2 350 000 2 014
14 Aug 20262 B/R FlatReady 1 364 sqftAED 2 725 000 1 998
6 Jul 2026Studio Hotel RoomsReady 477 sqftAED 777 215 —
29 Jun 20262 B/R FlatReady 1 290 sqftAED 2 655 000 2 059
25 Jun 20262 B/R FlatReady 1 364 sqftAED 3 200 000 2 346
16 Jun 20261 B/R Hotel RoomsReady 843 sqftAED 2 018 990 —
10 Jun 20263 B/R FlatReady 1 644 sqftAED 3 000 000 1 825
5 Jun 20263 B/R FlatReady 1 644 sqftAED 2 794 398 1 700
25 May 2026Studio Hotel RoomsReady 627 sqftAED 960 367 —
25 May 2026Studio Hotel RoomsReady 520 sqftAED 830 484 —
18 May 20261 B/R FlatReady 974 sqftAED 2 000 000 2 054
8 May 20261 B/R FlatReady 681 sqftAED 1 650 000 2 423
6 May 20262 B/R FlatReady 1 364 sqftAED 2 800 000 2 053
24 Feb 2026Studio Hotel RoomsReady 520 sqftAED 1 295 000 —
20 Feb 20261 B/R FlatReady 898 sqftAED 1 800 000 2 005
19 Feb 2026Studio Hotel RoomsReady 520 sqftAED 821 443 —
16 Feb 20261 B/R FlatReady 683 sqftAED 1 700 000 2 491
6 Feb 20262 B/R FlatReady 1 167 sqftAED 3 029 000 2 595
5 Feb 20262 B/R FlatReady 1 324 sqftAED 2 500 000 1 888
30 Jan 20262 B/R FlatReady 1 186 sqftAED 2 450 000 2 066

Source: Registered DLD transactions · Data through 24 Nov 2026 · individual registrations, shown exactly as recorded, without trimming · Methodology v1.0 ↗

Every registration, on request

The full DLD record for Paramount Tower Hotel & Residences: every registered sale, mortgage and gift, and every Ejari rent contract. It loads only when you ask; filter, sort and download it as CSV.

Registered sales by year

01002002015201620172018201920202021202220232024202520260100200201620182020202220242026

registered sales per calendar year; the current year is incomplete

By month

0246NovDecJanFebMarAprMayJunJulAugSepOct0246DecFebAprJunAugOct

registered sales per month, Nov 2025 – Oct 2026

YearSalesMedian priceMedian AED/sqftTotal registered value
202627AED 2.45M 2 054AED 59.22M
202550AED 2.09M 1 942AED 99.91M
202498AED 2.34M 1 887AED 218.02M
2023127AED 2.10M 1 796AED 265.25M
2022198AED 1.79M 1 622AED 333.19M
2021132AED 1.92M 1 576AED 242.26M
2020154AED 1.64M 1 319AED 261.96M
2019150AED 1.53M 1 738AED 240.99M
201810AED 1.41M 1 758AED 17.86M
201714AED 2.20M 1 926AED 29.43M
201672AED 2.19M 1 871AED 147.98M
201543AED 2.28M 1 881AED 107.63M

Source: Registered DLD transactions · Data through 24 Nov 2026 · calendar years; the current year is partial · Methodology v1.0 ↗

Rent and gross yield by year, 2022–2026

Median annual rent, AED thousand
Year1-bed flat2-bed flat3-bed flatGross yield
2026 YTD 105k160k210k—
2025 120k180k220k7.50%
2024 110k170k210k6.78%
2023 90k140k180k6.48%
2022 81k120k168k6.31%

Source: Ejari rental contracts and registered DLD sales · Data through 24 Nov 2026 · median annual rent per year a contract starts, shown from 15 contracts; yield = median rent ÷ median ready-home price of the same year and home type, from 15 of each · Methodology v1.0 ↗

Price and sales, month by month

MonthSalesMedian priceMedian AED/sqftIQR AED/sqft
Jan 20266 AED 2.55M2 066 1 991 – 2 083
Dec 20253 —— —
Nov 20255 AED 2.25M— —
Oct 20253 —— —
Sep 20253 —— —
Aug 20255 AED 2.39M— —
Jul 20255 AED 1.68M— —
Jun 20258 AED 1.82M1 900 1 725 – 2 290
May 20254 —— —
Apr 20252 —— —
Mar 20256 AED 1.90M1 773 1 677 – 2 139
Feb 20254 —— —
Jan 20252 —— —

Source: Registered DLD transactions · Data through 24 Nov 2026 · complete months only; the current month is excluded because DLD keeps registering it · Methodology v1.0 ↗

What these numbers do not show

  • Prices from the developer. Nothing here is a price list, a payment plan or availability — these are transactions already registered with DLD.
  • Whether construction is moving. The completion percentage is the figure recorded at the last technical inspection, and inspections are irregular: an unchanged number does not mean work stopped.
  • A handover promise. The declared completion date is a registry field, not a commitment.
  • Asking prices. Everything here is a registered transaction; what a home was listed at is a different number.
  • Off-market and cash-equivalent deals that never reach the registry, and the price actually negotiated before registration.
  • Service charges, chiller fees, agency commission, DLD transfer fees or mortgage costs — none of them are inside these prices.

Nearby projects

10 projects with a page on this site are registered within 1.2 km of Paramount Tower Hotel & Residences. Distance is measured between the coordinates in the DLD project registry.

ProjectDistanceBuiltUnits
Dt 1
Finished · Ellington Properties Development L.L.C
461 m100%133
Forte
Finished · Emaar Development P.J.S.C.
465 m100%927
Blvd Heights
Finished · Emaar Development P.J.S.C.
477 m100%558
Blvd Crescent
Finished · Emaar Development P.J.S.C.
543 m100%365
The St. Regis Residences, Downtown Dubai
Active · Emaar Development P.J.S.C.
556 m76%1108
The Opus By Omniyat
Finished · Omniyat Properties Six Limited
558 m100%2255
Act One | Act Two
Finished · Emaar Development P.J.S.C.
626 m100%788
Bahwan Tower
Finished · Utmost Properties L.L.C
650 m100%135
Clover Bay
Finished · Green Emirates Properties Co.Psc
664 m100%303
Dd Stand Point
Finished · Emaar Properties (P.J.S.C)
666 m100%549

The map loads only when you ask for it (OpenStreetMap, no tracking).

Source: DLD project registry coordinates · Data through 24 Nov 2026 · map © OpenStreetMap contributors · Methodology v1.0 ↗

Where this project sits

More projects by Namaa Properties Development L.L.C

Questions about Paramount Tower Hotel & Residences

Who is the developer of Paramount Tower Hotel & Residences?

The Dubai Land Department project registry lists Namaa Properties Development L.L.C as the developer of Paramount Tower Hotel & Residences.

Is Paramount Tower Hotel & Residences completed?

The DLD registry status of Paramount Tower Hotel & Residences is Finished, 100% complete at the last DLD inspection. The declared completion date in the registry is 29 Mar 2022 — a registry date, not a handover promise.

How many homes are in Paramount Tower Hotel & Residences?

The DLD registry records 799 units in Paramount Tower Hotel & Residences.

What is the price per square foot in Paramount Tower Hotel & Residences?

Over the last 12 complete months the median registered sale in Paramount Tower Hotel & Residences was AED 2.40M, or AED 2 053 per sqft, from 35 registered sales. These are DLD registrations, not asking prices.

Who holds the escrow account for Paramount Tower Hotel & Residences?

The escrow agent recorded by DLD for Paramount Tower Hotel & Residences is Commercial Bank Of Dubai(Psc).

Where is Paramount Tower Hotel & Residences?

Paramount Tower Hotel & Residences is in Dubai. 10 other projects with a page on this site are registered within 1.2 km; the closest is Dt 1, about 461 m away.

Where does this data come from?

From Dubai Land Department open data — the project registry, unit register and registered sales — rebuilt every night. Data through 24 Nov 2026.

Source: DLD project registry, unit register and registered sales · Data through 24 Nov 2026 · answers built from registry fields · Methodology v1.0 ↗

Cite or reuse this data

Machine-readable mirrors of this page: Markdown · JSON · llms.txt. How to cite: “Paramount Tower Hotel & Residences — Data Dubai, Continental Club Property, data through 24 Nov 2026, https://datadubai.ae/projects/paramount-tower-hotel-and-residences/”. Reuse is permitted with attribution.