Data Dubai

Dd Stand Point

Dd Stand PointFinished100% built549 homesDLD data through 25 Nov 2026

Updated 25 Nov 2026 · latest DLD registrations 25 Nov 2026 · DLD project registry and registered sales · trailing 12 months Nov 2025 – Oct 2026

Ask an AI about Dd Stand Point: ChatGPT · Claude · Perplexity

Dd Stand Point is a project by Emaar Properties (P.J.S.C), recorded at 100% complete at its last Dubai Land Department inspection. 36 sales registered in the trailing 12 months at a median AED 2.15M (2 236 AED per square foot). Registry facts come from DLD; prices are registered transactions, not asking prices.

Median sale price
AED 2.15M +1.8% y/y
≈ US$ 585k · typical range AED 1.75M – AED 2.70M
DLD verified
Median price per sqft
AED 2 236/sqft -4.5% y/y
typical range 2 021 – 2 507 AED/sqft
DLD verified
Registered sales
36 -34.5% y/y
all property types · trailing 12 complete months
DLD verified
Off-plan share
0.0%
of registered sales in the window
DLD verified

Source: Registered DLD transactions · Data through 25 Nov 2026 · sample 36 records · outlier-trimmed median, complete months only · Methodology v1.0 ↗

What the DLD registry says about this project

FieldValue
DeveloperEmaar Properties (P.J.S.C)
StatusFinished
Construction progress100% — at the last DLD inspection
Registered with DLD7 Jul 2010
Construction started24 Apr 2012
Declared completion12 Dec 2012 — registry date, not a handover promise
Units in the project549
Project area53 356 sqm
Escrow agentMashreq Bank Psc
Project number1277

Source: DLD project registry (Mashrooi) · Data through 25 Nov 2026 · registry fields as recorded, not developer marketing · Methodology v1.0 ↗

Price per square foot, month by month

1 5002 0002 5003 000May 2022Nov 2022May 2023Nov 2023May 2024Nov 2024May 2025Nov 2025May 20261 5002 0002 5003 000May 2022Nov 2023May 2025

median   interquartile range (middle 50% of transactions)

Source: Registered DLD transactions · Data through 25 Nov 2026 · monthly medians, months with fewer than 5 registered sales are left blank · Methodology v1.0 ↗

Construction, inspection by inspection

The DLD registry holds 2 technical inspections for this project, from 23 Sep 2012 at 94.8% to 27 Jan 2013 at 99.2%. Over the inspections since 23 Sep 2012 it moved 1.08 percentage points a month. Inspections are irregular and the percentage is what was recorded at each one, not a live measure of the site.

0%25%50%75%100%declared 2012-12-122012-09-232013-01-27

each dot is one DLD technical inspection; the line between two of them is drawn, not measured; the dashed mark is the completion date declared in the registry

InspectionRecordedChange
27 Jan 201399.2% +4.5 pp
23 Sep 201294.8% —

Source: DLD project registry (Mashrooi) — technical inspections · Data through 25 Nov 2026 · percentage as recorded at each inspection; inspections are irregular, and an unchanged value means no new inspection, not that work stopped · Methodology v1.0 ↗

By number of bedrooms

HomesSalesMedian priceMedian AED/sqftMedian sizeMedian rentGross yield
Studios insufficient data 2— — — — —
1-bedroom apartments low sample (18) 18AED 1.80M 2 254 810 sqft — —
2-bedroom apartments low sample (16) 16AED 2.85M 2 219 1 223 sqft — —

Source: Registered DLD sales and Ejari rental contracts · Data through 25 Nov 2026 · yield shown only where at least 15 rents and 15 ready-home sales support it · Methodology v1.0 ↗

Latest registered sales

DatePropertyRegistrationSizePriceAED/sqft
16 Nov 20262 B/R Flat — BD Standpoint BReady 1 450 sqftAED 2 675 000 1 845
2 Nov 20261 B/R Flat — BD Standpoint AReady 847 sqftAED 1 875 000 2 215
29 Oct 20262 B/R Flat — BD Standpoint AReady 1 209 sqftAED 2 850 000 2 358
23 Oct 20262 B/R Flat — BD Standpoint BReady 1 316 sqftAED 3 400 000 2 584
14 Oct 20261 B/R Flat — BD Standpoint AReady 714 sqftAED 2 000 000 2 802
5 Oct 20262 B/R Flat — BD Standpoint AReady 1 171 sqftAED 2 350 000 2 006
1 Oct 20261 B/R Flat — BD Standpoint AReady 792 sqftAED 1 800 000 2 272
19 Aug 20262 B/R Flat — BD Standpoint AReady 1 171 sqftAED 2 550 000 2 177
13 Aug 20262 B/R Flat — BD Standpoint BReady 1 316 sqftAED 2 500 000 1 900
5 Aug 20261 B/R Flat — BD Standpoint AReady 792 sqftAED 51 151 65
5 Aug 20261 B/R Flat — BD Standpoint AReady 829 sqftAED 2 010 000 2 424
29 Jul 20262 B/R Flat — BD Standpoint BReady 1 316 sqftAED 2 850 000 2 166
3 Jul 20262 B/R Flat — BD Standpoint AReady 1 171 sqftAED 2 600 000 2 219
29 Jun 20261 B/R Flat — BD Standpoint BReady 877 sqftAED 1 950 000 2 223
29 Jun 20261 B/R Flat — BD Standpoint AReady 841 sqftAED 1 700 000 2 021
25 Jun 2026Studio Flat — BD Standpoint AReady 447 sqftAED 1 100 000 2 461
23 Jun 20261 B/R Flat — BD Standpoint AReady 827 sqftAED 1 850 000 2 236
17 Jun 20261 B/R Flat — BD Standpoint AReady 841 sqftAED 1 500 000 1 784
2 Jun 20262 B/R Flat — BD Standpoint BReady 1 483 sqftAED 2 950 000 1 990
18 May 20261 B/R Flat — BD Standpoint AReady 1 189 sqftAED 2 150 000 1 809
7 May 20261 B/R Flat — BD Standpoint BReady 715 sqftAED 1 741 000 2 434
4 May 2026Studio Flat — BD Standpoint AReady 479 sqftAED 1 250 000 2 612
17 Apr 20261 B/R Flat — BD Standpoint AReady 827 sqftAED 1 550 000 1 874
13 Mar 20261 B/R Flat — BD Standpoint AReady 887 sqftAED 2 225 000 2 507

Source: Registered DLD transactions · Data through 25 Nov 2026 · individual registrations, shown exactly as recorded, without trimming · Methodology v1.0 ↗

Every registration, on request

The full DLD record for Dd Stand Point: every registered sale, mortgage and gift, and every Ejari rent contract. It loads only when you ask; filter, sort and download it as CSV.

Registered sales by year

02040602015201620172018201920202021202220232024202520260204060201620182020202220242026

registered sales per calendar year; the current year is incomplete

By month

0246NovDecJanFebMarAprMayJunJulAugSepOct0246DecFebAprJunAugOct

registered sales per month, Nov 2025 – Oct 2026

YearSalesMedian priceMedian AED/sqftTotal registered value
202629AED 2.08M 2 254AED 61.33M
202557AED 2.05M 2 378AED 115.33M
202468AED 1.78M 2 158AED 126.23M
202371AED 1.60M 1 905AED 121.41M
202251AED 1.35M 1 578AED 73.26M
202122AED 1.17M 1 346AED 28.72M
202020AED 940k 1 151AED 20.98M
201913AED 1.15M 1 450AED 14.69M
201837AED 1.50M 1 591AED 59.70M
201726AED 1.59M 1 893AED 44.47M
201627AED 1.74M 2 127AED 50.78M
201550AED 1.70M 2 323AED 99.87M

Source: Registered DLD transactions · Data through 25 Nov 2026 · calendar years; the current year is partial · Methodology v1.0 ↗

Rent and gross yield by year, 2013–2026

60k80k100k120k2013201420152016201720182019202020212022202320242025202660k80k100k120k2013201720212025

1-bed flat: median annual rent, AED, of new and renewed Ejari contracts by start year; band = middle half of contracts

Median annual rent, AED thousand
YearStudio1-bed flat2-bed flatGross yield
2026 YTD 74k103k145k5.57%
2025 80k110k150k5.62%
2024 75k100k145k5.91%
2023 70k90k140k5.79%
2022 58k79k116k6.06%
2021 48k65k88k—
2020 48k68k88k—
2019 58k75k100k—
2018 64k87k120k6.69%
2017 70k100k137k6.67%
2016 75k110k150k—
2015 80k110k158k6.47%
2014 78k105k165k5.83%
2013 71k92k140k5.70%

Source: Ejari rental contracts and registered DLD sales · Data through 25 Nov 2026 · median annual rent per year a contract starts, shown from 15 contracts; yield = median rent ÷ median ready-home price of the same year and home type, from 15 of each · Methodology v1.0 ↗

Price and sales, month by month

MonthSalesMedian priceMedian AED/sqftIQR AED/sqft
Oct 20265 AED 2.35M2 358 2 272 – 2 584
Sep 20260 —— —
Aug 20263 —— —
Jul 20262 —— —
Jun 20266 AED 1.77M2 122 1 998 – 2 233
May 20263 —— —
Apr 20261 —— —
Mar 20261 —— —
Feb 20263 —— —
Jan 20264 —— —
Dec 20250 —— —
Nov 20255 AED 2.50M2 184 2 134 – 2 426
Oct 20255 AED 2.11M2 746 2 236 – 2 949

Source: Registered DLD transactions · Data through 25 Nov 2026 · complete months only; the current month is excluded because DLD keeps registering it · Methodology v1.0 ↗

Buildings in this project

Building (DLD name)SalesMedian priceMedian AED/sqftOff-plan
BD Standpoint A 25AED 2.08M 2 2540.0%
Bd Standpoint B low sample (11) 11AED 2.50M 2 2230.0%

Source: Registered DLD transactions · Data through 25 Nov 2026 · outlier-trimmed median, complete months only · Methodology v1.0 ↗

What these numbers do not show

  • Prices from the developer. Nothing here is a price list, a payment plan or availability — these are transactions already registered with DLD.
  • Whether construction is moving. The completion percentage is the figure recorded at the last technical inspection, and inspections are irregular: an unchanged number does not mean work stopped.
  • A handover promise. The declared completion date is a registry field, not a commitment.
  • Asking prices. Everything here is a registered transaction; what a home was listed at is a different number.
  • Off-market and cash-equivalent deals that never reach the registry, and the price actually negotiated before registration.
  • Service charges, chiller fees, agency commission, DLD transfer fees or mortgage costs — none of them are inside these prices.

Nearby projects

10 projects with a page on this site are registered within 1.2 km of Dd Stand Point. Distance is measured between the coordinates in the DLD project registry.

ProjectDistanceBuiltUnits
The Address Dubai Opera
Finished · Emaar Development P.J.S.C.
102 m100%873
Il Primo
Finished · Emaar Development P.J.S.C.
116 m100%137
Opera Grand
Finished · Emaar Development P.J.S.C.
120 m100%306
Forte
Finished · Emaar Development P.J.S.C.
204 m100%927
Burj Vista
Finished · Emaar Development P.J.S.C.
208 m100%790
The St. Regis Residences, Downtown Dubai
Active · Emaar Development P.J.S.C.
257 m76%1108
Burj Khalifa Towers
Finished · Emaar Properties (P.J.S.C)
315 m100%1078
Act One | Act Two
Finished · Emaar Development P.J.S.C.
427 m100%788
Blvd Heights
Finished · Emaar Development P.J.S.C.
476 m100%558
Bd Boulevard Plaza
Finished · Emaar Properties (P.J.S.C)
492 m100%252

The map loads only when you ask for it (OpenStreetMap, no tracking).

Source: DLD project registry coordinates · Data through 25 Nov 2026 · map © OpenStreetMap contributors · Methodology v1.0 ↗

Where this project sits

More projects in DownTown Dubai

Questions about Dd Stand Point

Who is the developer of Dd Stand Point?

The Dubai Land Department project registry lists Emaar Properties (P.J.S.C) as the developer of Dd Stand Point.

Is Dd Stand Point completed?

The DLD registry status of Dd Stand Point is Finished, 100% complete at the last DLD inspection. The declared completion date in the registry is 12 Dec 2012 — a registry date, not a handover promise.

How many homes are in Dd Stand Point?

The DLD registry records 549 units in Dd Stand Point.

What is the price per square foot in Dd Stand Point?

Over the last 12 complete months the median registered sale in Dd Stand Point was AED 2.15M, or AED 2 236 per sqft, from 36 registered sales. These are DLD registrations, not asking prices.

Who holds the escrow account for Dd Stand Point?

The escrow agent recorded by DLD for Dd Stand Point is Mashreq Bank Psc.

Where is Dd Stand Point?

Dd Stand Point is in the DownTown Dubai community. 10 other projects with a page on this site are registered within 1.2 km; the closest is The Address Dubai Opera, about 102 m away.

Where does this data come from?

From Dubai Land Department open data — the project registry, unit register and registered sales — rebuilt every night. Data through 25 Nov 2026.

Source: DLD project registry, unit register and registered sales · Data through 25 Nov 2026 · answers built from registry fields · Methodology v1.0 ↗

Cite or reuse this data

Machine-readable mirrors of this page: Markdown · JSON · llms.txt. How to cite: “Dd Stand Point — Data Dubai, Continental Club Property, data through 25 Nov 2026, https://datadubai.ae/projects/dd-stand-point/”. Reuse is permitted with attribution.