Bahwan Tower
Updated 24 Nov 2026 · latest DLD registrations 24 Nov 2026 · DLD project registry and registered sales · trailing 12 months Nov 2025 – Oct 2026
Ask an AI about Bahwan Tower: ChatGPT · Claude · Perplexity
Bahwan Tower is a project by Utmost Properties L.L.C, recorded at 100% complete at its last Dubai Land Department inspection. 8 sales registered in the trailing 12 months at a median AED 2.60M (1 562 AED per square foot). Registry facts come from DLD; prices are registered transactions, not asking prices.
Source: Registered DLD transactions · Data through 24 Nov 2026 · sample 8 records · outlier-trimmed median, complete months only · Methodology v1.0 ↗
What the DLD registry says about this project
| Field | Value |
|---|---|
| Developer | Utmost Properties L.L.C |
| Status | Finished |
| Construction progress | 100% — at the last DLD inspection |
| Registered with DLD | 2 Mar 2016 |
| Construction started | 1 Mar 2016 |
| Declared completion | 3 Sep 2018 — registry date, not a handover promise |
| Units in the project | 135 |
| Project area | 19 343 sqm |
| Escrow agent | Emirates Nbd Bank (P.J.S.C) |
| Project number | 1732 |
Source: DLD project registry (Mashrooi) · Data through 24 Nov 2026 · registry fields as recorded, not developer marketing · Methodology v1.0 ↗
Price per square foot, month by month
Fewer than six months reached the five registered sales a median needs — too few to draw a line that would mean anything.
Source: Registered DLD transactions · Data through 24 Nov 2026 · monthly medians, months with fewer than 5 registered sales are left blank; the line stops at Mar 2022: in the 55 months since, no month reached the five registered sales a median needs (55 in total) · Methodology v1.0 ↗
Construction, inspection by inspection
The DLD registry holds 5 technical inspections for this project, from 12 Dec 2016 at 17.1% to 29 Aug 2018 at 100.0%. The last inspection recorded it complete. Inspections are irregular and the percentage is what was recorded at each one, not a live measure of the site.
each dot is one DLD technical inspection; the line between two of them is drawn, not measured; the dashed mark is the completion date declared in the registry
| Inspection | Recorded | Change |
|---|---|---|
| 29 Aug 2018 | 100.0% | +18.9 pp |
| 24 Jan 2018 | 81.1% | +30.9 pp |
| 11 Sep 2017 | 50.2% | +20.1 pp |
| 13 Apr 2017 | 30.1% | +13.1 pp |
| 12 Dec 2016 | 17.1% | — |
Source: DLD project registry (Mashrooi) — technical inspections · Data through 24 Nov 2026 · percentage as recorded at each inspection; inspections are irregular, and an unchanged value means no new inspection, not that work stopped · Methodology v1.0 ↗
By number of bedrooms
| Homes | Sales | Median price | Median AED/sqft | Median size | Median rent | Gross yield |
|---|---|---|---|---|---|---|
| 1-bedroom apartments insufficient data | 3 | — | — | — | — | — |
| 2-bedroom apartments insufficient data | 4 | — | — | — | — | — |
| 3-bedroom apartments insufficient data | 1 | — | — | — | — | — |
Source: Registered DLD sales and Ejari rental contracts · Data through 24 Nov 2026 · yield shown only where at least 15 rents and 15 ready-home sales support it · Methodology v1.0 ↗
Latest registered sales
| Date | Property | Registration | Size | Price | AED/sqft |
|---|---|---|---|---|---|
| 20 Oct 2026 | 1 B/R Flat | Ready | 982 sqft | AED 1 450 000 | 1 477 |
| 6 Jul 2026 | 3 B/R Flat | Ready | 2 037 sqft | AED 2 777 000 | 1 363 |
| 23 Feb 2026 | 2 B/R Flat | Ready | 1 509 sqft | AED 2 800 000 | 1 856 |
| 20 Feb 2026 | 1 B/R Flat | Ready | 1 049 sqft | AED 1 650 000 | 1 573 |
| 18 Feb 2026 | 1 B/R Flat | Ready | 1 068 sqft | AED 1 650 000 | 1 545 |
| 6 Feb 2026 | 2 B/R Flat | Ready | 1 677 sqft | AED 2 600 000 | 1 550 |
| 2 Jan 2026 | 2 B/R Flat | Ready | 1 517 sqft | AED 2 600 000 | 1 714 |
| 12 Dec 2025 | 2 B/R Flat | Ready | 1 677 sqft | AED 2 800 000 | 1 670 |
Source: Registered DLD transactions · Data through 24 Nov 2026 · individual registrations, shown exactly as recorded, without trimming · Methodology v1.0 ↗
Every registration, on request
The full DLD record for Bahwan Tower: every registered sale, mortgage and gift, and every Ejari rent contract. It loads only when you ask; filter, sort and download it as CSV.
Registered sales by year
registered sales per calendar year; the current year is incomplete
By month
registered sales per month, Apr 2022 – Mar 2023
| Year | Sales | Median price | Median AED/sqft | Total registered value |
|---|---|---|---|---|
| 2026 | 7 | AED 2.60M | 1 550 | AED 15.53M |
| 2025 | 13 | AED 2.45M | 1 655 | AED 33.39M |
| 2024 | 10 | AED 2.38M | 1 515 | AED 23.12M |
| 2023 | 15 | AED 2.20M | 1 356 | AED 31.07M |
| 2022 | 30 | AED 1.61M | 1 045 | AED 46.68M |
| 2021 | 46 | AED 1.61M | 1 050 | AED 73.82M |
| 2020 | 2 | — | — | AED 3.86M |
| 2019 | 3 | — | — | AED 5.46M |
| 2018 | 8 | AED 1.96M | 1 449 | AED 20.03M |
| 2017 | 42 | AED 2.21M | 1 450 | AED 94.06M |
| 2016 | 11 | AED 2.10M | 1 369 | AED 23.80M |
| 2013 | 1 | — | — | AED 57.22M |
Source: Registered DLD transactions · Data through 24 Nov 2026 · calendar years; the current year is partial · Methodology v1.0 ↗
Rent and gross yield by year, 2019–2026
2-bed flat: median annual rent, AED, of new and renewed Ejari contracts by start year; band = middle half of contracts
| Year | 1-bed flat | 2-bed flat | 3-bed flat | Gross yield |
|---|---|---|---|---|
| 2026 YTD | 103k | 158k | — | — |
| 2025 | 105k | 160k | — | — |
| 2024 | 100k | 150k | — | — |
| 2023 | 90k | 150k | — | — |
| 2022 | 76k | 106k | — | 6.16% |
| 2021 | 65k | 90k | 135k | 5.82% |
| 2020 | 79k | 105k | 130k | — |
| 2019 | 85k | 115k | 140k | — |
Source: Ejari rental contracts and registered DLD sales · Data through 24 Nov 2026 · median annual rent per year a contract starts, shown from 15 contracts; yield = median rent ÷ median ready-home price of the same year and home type, from 15 of each · Methodology v1.0 ↗
Price and sales, month by month
| Month | Sales | Median price | Median AED/sqft | IQR AED/sqft |
|---|---|---|---|---|
| Mar 2022 | 7 | AED 1.61M | 1 050 | 1 050 – 1 050 |
| Feb 2022 | 2 | — | — | — |
| Jan 2022 | 11 | AED 1.55M | 1 040 | 1 039 – 1 045 |
| Dec 2021 | 3 | — | — | — |
| Nov 2021 | 7 | AED 1.59M | 1 050 | 1 011 – 1 050 |
Source: Registered DLD transactions · Data through 24 Nov 2026 · complete months only; the current month is excluded because DLD keeps registering it · Methodology v1.0 ↗
What these numbers do not show
- Prices from the developer. Nothing here is a price list, a payment plan or availability — these are transactions already registered with DLD.
- Whether construction is moving. The completion percentage is the figure recorded at the last technical inspection, and inspections are irregular: an unchanged number does not mean work stopped.
- A handover promise. The declared completion date is a registry field, not a commitment.
- A reliable price. Only 8 sales registered in the last 12 months here.
- Asking prices. Everything here is a registered transaction; what a home was listed at is a different number.
- Off-market and cash-equivalent deals that never reach the registry, and the price actually negotiated before registration.
- Service charges, chiller fees, agency commission, DLD transfer fees or mortgage costs — none of them are inside these prices.
Nearby projects
10 projects with a page on this site are registered within 1.2 km of Bahwan Tower. Distance is measured between the coordinates in the DLD project registry.
| Project | Distance | Built |
|---|---|---|
| Claren 1 Finished · Emaar Properties (P.J.S.C) |
117 m | 100% |
| Blvd Crescent Finished · Emaar Development P.J.S.C. |
163 m | 100% |
| Dt 1 Finished · Ellington Properties Development L.L.C |
195 m | 100% |
| Clover Bay Finished · Green Emirates Properties Co.Psc |
205 m | 100% |
| Vida Residence Downtown Dubai Finished · Emaar Development P.J.S.C. |
210 m | 100% |
| Prime Tower Finished · Sidra Limited |
237 m | 100% |
| 29 Boulevard Finished · Emaar Properties (P.J.S.C) |
237 m | 100% |
| Blvd Heights Finished · Emaar Development P.J.S.C. |
242 m | 100% |
| Act One | Act Two Finished · Emaar Development P.J.S.C. |
272 m | 100% |
| Dd Boulevard Central Finished · Emaar Properties (P.J.S.C) |
294 m | 100% |
The map loads only when you ask for it (OpenStreetMap, no tracking).
Source: DLD project registry coordinates · Data through 24 Nov 2026 · map © OpenStreetMap contributors · Methodology v1.0 ↗
Where this project sits
More projects in DownTown Dubai
Questions about Bahwan Tower
Who is the developer of Bahwan Tower?
The Dubai Land Department project registry lists Utmost Properties L.L.C as the developer of Bahwan Tower.
Is Bahwan Tower completed?
The DLD registry status of Bahwan Tower is Finished, 100% complete at the last DLD inspection. The declared completion date in the registry is 3 Sep 2018 — a registry date, not a handover promise.
How many homes are in Bahwan Tower?
The DLD registry records 135 units in Bahwan Tower.
What is the price per square foot in Bahwan Tower?
Over the last 12 complete months the median registered sale in Bahwan Tower was AED 2.60M, or AED 1 562 per sqft, from 8 registered sales. These are DLD registrations, not asking prices.
Who holds the escrow account for Bahwan Tower?
The escrow agent recorded by DLD for Bahwan Tower is Emirates Nbd Bank (P.J.S.C).
Where is Bahwan Tower?
Bahwan Tower is in the DownTown Dubai community. 10 other projects with a page on this site are registered within 1.2 km; the closest is Claren 1, about 117 m away.
Where does this data come from?
From Dubai Land Department open data — the project registry, unit register and registered sales — rebuilt every night. Data through 24 Nov 2026.
Source: DLD project registry, unit register and registered sales · Data through 24 Nov 2026 · answers built from registry fields · Methodology v1.0 ↗