Pier 8

Pier 8Active93% built341 homesDLD data through 24 Nov 2026

Updated 24 Nov 2026 · latest DLD registrations 24 Nov 2026 · DLD project registry and registered sales · trailing 12 months Nov 2025 – Oct 2026

Ask an AI about Pier 8: ChatGPT · Claude · Perplexity

Pier 8 is a project by Pier 8 Real Estate Development L.L.C, recorded at 93% complete at its last Dubai Land Department inspection. 8 sales registered in the trailing 12 months at a median AED 778k. Registry facts come from DLD; prices are registered transactions, not asking prices.

Median sale price
AED 778k -11.7% y/y
≈ US$ 212k · typical range AED 732k – AED 1.07M
DLD verified
Median price per sqft
—
built residential only
DLD verified
Registered sales
8 -50.0% y/y
all property types · trailing 12 complete months
DLD verified
Off-plan share
100.0%
of registered sales in the window
DLD verified

Source: Registered DLD transactions · Data through 24 Nov 2026 · sample 8 records · outlier-trimmed median, complete months only · Methodology v1.0 ↗

What the DLD registry says about this project

FieldValue
DeveloperPier 8 Real Estate Development L.L.C
StatusActive
Construction progress93% — at the last DLD inspection
Registered with DLD29 Mar 2023
Construction started10 Apr 2022
Declared completion8 Mar 2026 — registry date, not a handover promise
Units in the project341
Project area41 058 sqm
Escrow agentAbu Dhabi Commercial Bank
Project number2380

Source: DLD project registry (Mashrooi) · Data through 24 Nov 2026 · registry fields as recorded, not developer marketing · Methodology v1.0 ↗

Price per square foot, month by month

Fewer than six months reached the five registered sales a median needs — too few to draw a line that would mean anything.

Source: Registered DLD transactions · Data through 24 Nov 2026 · monthly medians, months with fewer than 5 registered sales are left blank; the line stops at Nov 2024: in the 23 months since, there were no registered sales at all, so no month reached the five registered sales a median needs · Methodology v1.0 ↗

Construction, inspection by inspection

The DLD registry holds 3 technical inspections for this project, from 11 Jul 2023 at 57.0% to 11 Nov 2026 at 93.0%. Inspections are irregular and the percentage is what was recorded at each one, not a live measure of the site.

0%25%50%75%100%declared 2026-03-082023-07-112026-11-11

each dot is one DLD technical inspection; the line between two of them is drawn, not measured; the dashed mark is the completion date declared in the registry

InspectionRecordedChange
11 Nov 202693.0% +22.9 pp
14 Feb 202470.1% +13.1 pp
11 Jul 202357.0% —

Source: DLD project registry (Mashrooi) — technical inspections · Data through 24 Nov 2026 · percentage as recorded at each inspection; inspections are irregular, and an unchanged value means no new inspection, not that work stopped · Methodology v1.0 ↗

Homes and registered off-plan sales

The DLD unit register lists 331 homes in Pier 8, and 54 off-plan sale registrations have been recorded since May 2013, as of 23 Nov 2026. After 13.5 years of sales, resales make up a growing part of those registrations, so we do not turn them into an unsold count.

HomesIn unit
register
Registered
sales
1 bedroom18937
2 bedrooms13417
3 bedrooms80

Source: DLD unit register and registered off-plan sales · Data through 23 Nov 2026 · 'Sell - Pre registration' registrations include resales before completion, so the gap is a floor, not the developer's availability · Methodology v1.0 ↗

Homes without a registered sale in all Dubai off-plan projects →

By number of bedrooms

HomesSalesMedian priceMedian AED/sqftMedian sizeMedian rentGross yield
1-bedroom apartments low sample (5) 5AED 741k — 968 sqft — —
2-bedroom apartments insufficient data 3— — — — —

Source: Registered DLD sales and Ejari rental contracts · Data through 24 Nov 2026 · yield shown only where at least 15 rents and 15 ready-home sales support it · Methodology v1.0 ↗

Latest registered sales

DatePropertyRegistrationSizePriceAED/sqft
11 Mar 20261 B/R FlatOff-plan 990 sqftAED 650 000 656
17 Feb 20261 B/R FlatOff-plan 927 sqftAED 741 424 800
30 Jan 20261 B/R FlatOff-plan 976 sqftAED 781 035 800
30 Jan 20261 B/R FlatOff-plan 880 sqftAED 704 396 800
30 Jan 20261 B/R FlatOff-plan 968 sqftAED 774 060 800
30 Jan 20262 B/R FlatOff-plan 1 401 sqftAED 1 121 006 800
30 Jan 20262 B/R FlatOff-plan 1 344 sqftAED 1 074 849 800
30 Jan 20262 B/R FlatOff-plan 1 330 sqftAED 1 063 827 800

Source: Registered DLD transactions · Data through 24 Nov 2026 · individual registrations, shown exactly as recorded, without trimming · Methodology v1.0 ↗

Every registration, on request

The full DLD record for Pier 8: every registered sale, mortgage and gift. It loads only when you ask; filter, sort and download it as CSV.

Registered sales by year

0102030201320222024202601020302013202220242026

registered sales per calendar year; the current year is incomplete

YearSalesMedian priceMedian AED/sqftTotal registered value
20268AED 778k —AED 6.91M
202436AED 672k 965AED 25.82M
20221— —AED 0
201310AED 1.33M 1 100AED 12.48M

Source: Registered DLD transactions · Data through 24 Nov 2026 · calendar years; the current year is partial · Methodology v1.0 ↗

Price and sales, month by month

MonthSalesMedian priceMedian AED/sqftIQR AED/sqft
Nov 202414 AED 880k965 965 – 965
Oct 20241 —— —
Sep 20240 —— —
Aug 202417 AED 595k1 200 1 200 – 1 200

Source: Registered DLD transactions · Data through 24 Nov 2026 · complete months only; the current month is excluded because DLD keeps registering it · Methodology v1.0 ↗

What these numbers do not show

  • Prices from the developer. Nothing here is a price list, a payment plan or availability — these are transactions already registered with DLD.
  • Whether construction is moving. The completion percentage is the figure recorded at the last technical inspection, and inspections are irregular: an unchanged number does not mean work stopped.
  • A handover promise. The declared completion date is a registry field, not a commitment.
  • A reliable price. Only 8 sales registered in the last 12 months here.
  • Asking prices. Everything here is a registered transaction; what a home was listed at is a different number.
  • Off-market and cash-equivalent deals that never reach the registry, and the price actually negotiated before registration.
  • Service charges, chiller fees, agency commission, DLD transfer fees or mortgage costs — none of them are inside these prices.

Where this project sits

More projects in Dubai Marina

Questions about Pier 8

Who is the developer of Pier 8?

The Dubai Land Department project registry lists Pier 8 Real Estate Development L.L.C as the developer of Pier 8.

Is Pier 8 completed?

The DLD registry status of Pier 8 is Active, 93% complete at the last DLD inspection. The declared completion date in the registry is 8 Mar 2026 — a registry date, not a handover promise.

How many homes are in Pier 8?

The DLD registry records 341 units in Pier 8. The split by number of bedrooms is in the unit register table on this page.

What is the price per square foot in Pier 8?

Too few sales were registered in Pier 8 in the last 12 months to publish a median; earlier registered sales are shown in the charts on this page.

Who holds the escrow account for Pier 8?

The escrow agent recorded by DLD for Pier 8 is Abu Dhabi Commercial Bank.

Where is Pier 8?

Pier 8 is in the Dubai Marina community.

Where does this data come from?

From Dubai Land Department open data — the project registry, unit register and registered sales — rebuilt every night. Data through 24 Nov 2026.

Source: DLD project registry, unit register and registered sales · Data through 24 Nov 2026 · answers built from registry fields · Methodology v1.0 ↗

Cite or reuse this data

Machine-readable mirrors of this page: Markdown · JSON · llms.txt. How to cite: “Pier 8 — Data Dubai, Continental Club Property, data through 24 Nov 2026, https://datadubai.ae/projects/pier-8/”. Reuse is permitted with attribution.

Put this project on your website

Paste this code into any page to show the price-per-sqft chart and the latest registered sales for Pier 8. It updates every night by itself and always carries the source line and a link back here — that link is the only condition of reuse. Preview · data API and other embeds.