Tabeer 1
Updated 24 Nov 2026 · latest DLD registrations 24 Nov 2026 · DLD project registry and registered sales · trailing 12 months Nov 2025 – Oct 2026
Ask an AI about Tabeer 1: ChatGPT · Claude · Perplexity
Tabeer 1 is a project by Tabeer Real Estate Development L.L.C, recorded at 100% complete at its last Dubai Land Department inspection. 6 sales registered in the trailing 12 months at a median AED 840k (1 096 AED per square foot). Registry facts come from DLD; prices are registered transactions, not asking prices.
Source: Registered DLD transactions · Data through 24 Nov 2026 · sample 6 records · outlier-trimmed median, complete months only · Methodology v1.0 ↗
What the DLD registry says about this project
| Field | Value |
|---|---|
| Developer | Tabeer Real Estate Development L.L.C |
| Status | Finished |
| Construction progress | 100% — at the last DLD inspection |
| Registered with DLD | 21 Jan 2019 |
| Construction started | 21 Jan 2018 |
| Declared completion | 15 Jun 2022 — registry date, not a handover promise |
| Units in the project | 107 |
| Project area | 8 032 sqm |
| Escrow agent | Mashreq Bank Psc |
| Project number | 2090 |
Source: DLD project registry (Mashrooi) · Data through 24 Nov 2026 · registry fields as recorded, not developer marketing · Methodology v1.0 ↗
Price per square foot, month by month
median interquartile range (middle 50% of transactions)
Source: Registered DLD transactions · Data through 24 Nov 2026 · monthly medians, months with fewer than 5 registered sales are left blank; the line stops at Apr 2024: in the 30 months since, no month reached the five registered sales a median needs (12 in total) · Methodology v1.0 ↗
Construction, inspection by inspection
The DLD registry holds 6 technical inspections for this project, from 30 Sep 2018 at 25.8% to 18 Aug 2022 at 100.0%. The last inspection recorded it complete. Inspections are irregular and the percentage is what was recorded at each one, not a live measure of the site.
each dot is one DLD technical inspection; the line between two of them is drawn, not measured; the dashed mark is the completion date declared in the registry
| Inspection | Recorded | Change |
|---|---|---|
| 18 Aug 2022 | 100.0% | +9.8 pp |
| 15 Dec 2021 | 90.2% | +16.9 pp |
| 25 Jul 2021 | 73.3% | +18.1 pp |
| 15 Feb 2021 | 55.2% | +11.9 pp |
| 10 Aug 2020 | 43.3% | +17.5 pp |
| 30 Sep 2018 | 25.8% | — |
Source: DLD project registry (Mashrooi) — technical inspections · Data through 24 Nov 2026 · percentage as recorded at each inspection; inspections are irregular, and an unchanged value means no new inspection, not that work stopped · Methodology v1.0 ↗
By number of bedrooms
| Homes | Sales | Median price | Median AED/sqft | Median size | Median rent | Gross yield |
|---|---|---|---|---|---|---|
| Studios insufficient data | 3 | — | — | — | — | — |
| 2-bedroom apartments insufficient data | 3 | — | — | — | — | — |
Source: Registered DLD sales and Ejari rental contracts · Data through 24 Nov 2026 · yield shown only where at least 15 rents and 15 ready-home sales support it · Methodology v1.0 ↗
Latest registered sales
| Date | Property | Registration | Size | Price | AED/sqft |
|---|---|---|---|---|---|
| 24 Nov 2026 | 2 B/R Flat | Ready | 1 062 sqft | AED 900 000 | 847 |
| 16 Nov 2026 | 1 B/R Flat | Ready | 766 sqft | AED 790 000 | 1 032 |
| 31 Mar 2026 | Studio Flat | Ready | 446 sqft | AED 530 000 | 1 188 |
| 11 Mar 2026 | 2 B/R Flat | Ready | 1 079 sqft | AED 1 180 000 | 1 094 |
| 11 Feb 2026 | 2 B/R Flat | Ready | 1 071 sqft | AED 1 700 000 | 1 587 |
| 28 Jan 2026 | Studio Flat | Ready | 446 sqft | AED 490 000 | 1 098 |
| 26 Nov 2025 | 2 B/R Flat | Ready | 1 060 sqft | AED 1 150 000 | 1 085 |
| 7 Nov 2025 | Studio Flat | Ready | 446 sqft | AED 450 000 | 1 009 |
Source: Registered DLD transactions · Data through 24 Nov 2026 · individual registrations, shown exactly as recorded, without trimming · Methodology v1.0 ↗
Every registration, on request
The full DLD record for Tabeer 1: every registered sale, mortgage and gift, and every Ejari rent contract. It loads only when you ask; filter, sort and download it as CSV.
Registered sales by year
registered sales per calendar year; the current year is incomplete
By month
registered sales per month, May 2024 – Apr 2025
| Year | Sales | Median price | Median AED/sqft | Total registered value |
|---|---|---|---|---|
| 2026 | 4 | — | — | AED 3.90M |
| 2025 | 4 | — | — | AED 2.40M |
| 2024 | 21 | AED 406k | 631 | AED 13.58M |
| 2023 | 30 | AED 525k | 839 | AED 18.23M |
| 2022 | 54 | AED 605k | 825 | AED 34.39M |
| 2021 | 25 | AED 387k | 853 | AED 13.50M |
| 2019 | 1 | — | — | AED 620k |
| 2017 | 1 | — | — | AED 17.50M |
| 2016 | 1 | — | — | AED 4.07M |
| 2014 | 1 | — | — | AED 15.87M |
Source: Registered DLD transactions · Data through 24 Nov 2026 · calendar years; the current year is partial · Methodology v1.0 ↗
Price and sales, month by month
| Month | Sales | Median price | Median AED/sqft | IQR AED/sqft |
|---|---|---|---|---|
| Apr 2024 | 11 | AED 385k | 624 | 528 – 626 |
| Mar 2024 | 4 | — | — | — |
| Feb 2024 | 0 | — | — | — |
| Jan 2024 | 1 | — | — | — |
| Dec 2023 | 2 | — | — | — |
| Nov 2023 | 2 | — | — | — |
| Oct 2023 | 1 | — | — | — |
| Sep 2023 | 0 | — | — | — |
| Aug 2023 | 1 | — | — | — |
| Jul 2023 | 0 | — | — | — |
| Jun 2023 | 3 | — | — | — |
| May 2023 | 2 | — | — | — |
| Apr 2023 | 1 | — | — | — |
Source: Registered DLD transactions · Data through 24 Nov 2026 · complete months only; the current month is excluded because DLD keeps registering it · Methodology v1.0 ↗
What these numbers do not show
- Prices from the developer. Nothing here is a price list, a payment plan or availability — these are transactions already registered with DLD.
- Whether construction is moving. The completion percentage is the figure recorded at the last technical inspection, and inspections are irregular: an unchanged number does not mean work stopped.
- A handover promise. The declared completion date is a registry field, not a commitment.
- A reliable price. Only 6 sales registered in the last 12 months here.
- Asking prices. Everything here is a registered transaction; what a home was listed at is a different number.
- Off-market and cash-equivalent deals that never reach the registry, and the price actually negotiated before registration.
- Service charges, chiller fees, agency commission, DLD transfer fees or mortgage costs — none of them are inside these prices.
Where this project sits
More projects in International City Phase 1
Questions about Tabeer 1
Who is the developer of Tabeer 1?
The Dubai Land Department project registry lists Tabeer Real Estate Development L.L.C as the developer of Tabeer 1.
Is Tabeer 1 completed?
The DLD registry status of Tabeer 1 is Finished, 100% complete at the last DLD inspection. The declared completion date in the registry is 15 Jun 2022 — a registry date, not a handover promise.
How many homes are in Tabeer 1?
The DLD registry records 107 units in Tabeer 1.
What is the price per square foot in Tabeer 1?
Over the last 12 complete months the median registered sale in Tabeer 1 was AED 840k, or AED 1 096 per sqft, from 6 registered sales. These are DLD registrations, not asking prices.
Who holds the escrow account for Tabeer 1?
The escrow agent recorded by DLD for Tabeer 1 is Mashreq Bank Psc.
Where is Tabeer 1?
Tabeer 1 is in the International City Phase 1 community.
Where does this data come from?
From Dubai Land Department open data — the project registry, unit register and registered sales — rebuilt every night. Data through 24 Nov 2026.
Source: DLD project registry, unit register and registered sales · Data through 24 Nov 2026 · answers built from registry fields · Methodology v1.0 ↗