Data Dubai

The Villa 3

The Villa 3Finished100% built14 homesDLD data through 24 Nov 2026

Updated 24 Nov 2026 · latest DLD registrations 24 Nov 2026 · DLD project registry and registered sales · trailing 12 months Nov 2025 – Oct 2026

Ask an AI about The Villa 3: ChatGPT · Claude · Perplexity

The Villa 3 is a project by Dubai Land Residences (L.L.C), recorded at 100% complete at its last Dubai Land Department inspection. 6 sales registered in the trailing 12 months at a median AED 15.00M. Registry facts come from DLD; prices are registered transactions, not asking prices.

Median sale price
AED 15.00M +27.7% y/y
≈ US$ 4.08M · typical range AED 13.62M – AED 16.75M
DLD verified
Median price per sqft
—
built residential only
DLD verified
Registered sales
6 -40.0% y/y
all property types · trailing 12 complete months
DLD verified
Off-plan share
0.0%
of registered sales in the window
DLD verified

Source: Registered DLD transactions · Data through 24 Nov 2026 · sample 6 records · outlier-trimmed median, complete months only · Methodology v1.0 ↗

What the DLD registry says about this project

FieldValue
DeveloperDubai Land Residences (L.L.C)
StatusFinished
Construction progress100% — at the last DLD inspection
Registered with DLD18 Oct 2010
Construction started22 Nov 2008
Declared completion2 Jun 2023 — registry date, not a handover promise
Units in the project14
Project area18 847 sqm
Escrow agentMashreq Bank Psc
Project number1296

Source: DLD project registry (Mashrooi) · Data through 24 Nov 2026 · registry fields as recorded, not developer marketing · Methodology v1.0 ↗

Price per square foot, month by month

No month in this window reached the five registered sales a median needs, so there is nothing to plot.

Source: Registered DLD transactions · Data through 24 Nov 2026 · monthly medians, months with fewer than 5 registered sales are left blank · Methodology v1.0 ↗

Construction, inspection by inspection

The DLD registry holds 6 technical inspections for this project, from 12 Dec 2012 at 28.6% to 2 Jun 2023 at 100.0%. The last inspection recorded it complete. Inspections are irregular and the percentage is what was recorded at each one, not a live measure of the site.

0%25%50%75%100%declared 2023-06-022012-12-122023-06-02

each dot is one DLD technical inspection; the line between two of them is drawn, not measured; the dashed mark is the completion date declared in the registry

InspectionRecordedChange
2 Jun 2023100.0% +12.5 pp
1 Feb 202287.5% +6.0 pp
17 Sep 201481.5% +0.0 pp
17 Sep 201481.5% +52.0 pp
4 Jun 201329.5% +0.9 pp
12 Dec 201228.6% —

Source: DLD project registry (Mashrooi) — technical inspections · Data through 24 Nov 2026 · percentage as recorded at each inspection; inspections are irregular, and an unchanged value means no new inspection, not that work stopped · Methodology v1.0 ↗

Latest registered sales

DatePropertyRegistrationSizePriceAED/sqft
5 Nov 2026LandReady 22 598 sqftAED 18 800 000 —
1 Oct 2026LandReady 17 135 sqftAED 16 000 000 —
11 Sep 2026LandReady 21 011 sqftAED 17 000 000 —
20 Aug 2026LandReady 16 311 sqftAED 14 000 000 —
11 Jun 2026VillaReady 17 199 sqftAED 17 000 000 —
15 May 2026VillaReady 12 043 sqftAED 13 500 000 —
30 Dec 2025VillaReady 30 341 sqftAED 13 000 000 —

Source: Registered DLD transactions · Data through 24 Nov 2026 · individual registrations, shown exactly as recorded, without trimming · Methodology v1.0 ↗

Every registration, on request

The full DLD record for The Villa 3: every registered sale, mortgage and gift, and every Ejari rent contract. It loads only when you ask; filter, sort and download it as CSV.

Registered sales by year

0102020152016201720182019202020212022202320242025202601020201620182020202220242026

registered sales per calendar year; the current year is incomplete

By month

001NovDecJanFebMarAprMayJunJulAugSepOct001DecFebAprJunAugOct

registered sales per month, Nov 2025 – Oct 2026

YearSalesMedian priceMedian AED/sqftTotal registered value
20265AED 16.00M —AED 77.50M
202511AED 13.00M —AED 133.68M
20248AED 9.15M —AED 75.59M
20238AED 7.53M —AED 57.70M
202211AED 7.29M —AED 77.12M
202116AED 7.99M —AED 118.61M
202014AED 6.50M —AED 88.95M
20198AED 6.95M —AED 50.36M
20189AED 6.71M —AED 59.53M
201715AED 6.37M —AED 96.85M
201613AED 6.39M —AED 84.41M
201521AED 6.34M —AED 127.04M

Source: Registered DLD transactions · Data through 24 Nov 2026 · calendar years; the current year is partial · Methodology v1.0 ↗

What these numbers do not show

  • Prices from the developer. Nothing here is a price list, a payment plan or availability — these are transactions already registered with DLD.
  • Whether construction is moving. The completion percentage is the figure recorded at the last technical inspection, and inspections are irregular: an unchanged number does not mean work stopped.
  • A handover promise. The declared completion date is a registry field, not a commitment.
  • A reliable price. Only 6 sales registered in the last 12 months here.
  • Asking prices. Everything here is a registered transaction; what a home was listed at is a different number.
  • Off-market and cash-equivalent deals that never reach the registry, and the price actually negotiated before registration.
  • Service charges, chiller fees, agency commission, DLD transfer fees or mortgage costs — none of them are inside these prices.

Nearby projects

10 projects with a page on this site are registered within 1.2 km of The Villa 3. Distance is measured between the coordinates in the DLD project registry.

ProjectDistanceBuiltUnits
Time 1
Finished · Time Properties
509 m100%286
Safeer Residences 3
Finished · Alseeb Real Estate Development L.L.C
641 m100%64
Ajmal Sarah
Finished · Fabson Import Export Limited
989 m100%302
Phoenix Tower
Finished · Phoenix Holdings (L.L.C)
1,006 m100%116
Indigo Tower
Finished · Indigo Valley Inc Limited
1,049 m100%136
Qpoint Liwan-Plot R073
Finished · Al Mazaya Real Estate Fz-Llc
1,112 m100%61
Sondos Orchid
Finished · Al Sondos Real Estate L.L.C
1,115 m100%146
Sondos Lilac
Finished · Al Sondos Real Estate L.L.C
1,131 m100%150
Qpoint Liwan-Plot R072
Finished · Al Mazaya Real Estate Fz-Llc
1,141 m100%61
Qpoint Liwan-Plot R071
Finished · Al Mazaya Real Estate Fz-Llc
1,171 m100%61

The map loads only when you ask for it (OpenStreetMap, no tracking).

Source: DLD project registry coordinates · Data through 24 Nov 2026 · map © OpenStreetMap contributors · Methodology v1.0 ↗

Where this project sits

Questions about The Villa 3

Who is the developer of The Villa 3?

The Dubai Land Department project registry lists Dubai Land Residences (L.L.C) as the developer of The Villa 3.

Is The Villa 3 completed?

The DLD registry status of The Villa 3 is Finished, 100% complete at the last DLD inspection. The declared completion date in the registry is 2 Jun 2023 — a registry date, not a handover promise.

How many homes are in The Villa 3?

The DLD registry records 14 units in The Villa 3.

What is the price per square foot in The Villa 3?

Too few sales were registered in The Villa 3 in the last 12 months to publish a median; earlier registered sales are shown in the charts on this page.

Who holds the escrow account for The Villa 3?

The escrow agent recorded by DLD for The Villa 3 is Mashreq Bank Psc.

Where is The Villa 3?

The Villa 3 is in the The Villa community. 10 other projects with a page on this site are registered within 1.2 km; the closest is Time 1, about 509 m away.

Where does this data come from?

From Dubai Land Department open data — the project registry, unit register and registered sales — rebuilt every night. Data through 24 Nov 2026.

Source: DLD project registry, unit register and registered sales · Data through 24 Nov 2026 · answers built from registry fields · Methodology v1.0 ↗

Cite or reuse this data

Machine-readable mirrors of this page: Markdown · JSON · llms.txt. How to cite: “The Villa 3 — Data Dubai, Continental Club Property, data through 24 Nov 2026, https://datadubai.ae/projects/the-villa-3/”. Reuse is permitted with attribution.