Qpoint Liwan-Plot R073
Updated 24 Nov 2026 · latest DLD registrations 24 Nov 2026 · DLD project registry and registered sales · trailing 12 months Nov 2025 – Oct 2026
Ask an AI about Qpoint Liwan-Plot R073: ChatGPT · Claude · Perplexity
Qpoint Liwan-Plot R073 is a project by Al Mazaya Real Estate Fz-Llc, recorded at 100% complete at its last Dubai Land Department inspection. Fewer than 5 sales registered here in the last 12 months, so no median is published. Registry facts come from DLD; prices are registered transactions, not asking prices.
Source: Registered DLD transactions · Data through 24 Nov 2026 · sample 0 records · outlier-trimmed median, complete months only · Methodology v1.0 ↗
What the DLD registry says about this project
| Field | Value |
|---|---|
| Developer | Al Mazaya Real Estate Fz-Llc |
| Status | Finished |
| Construction progress | 100% — at the last DLD inspection |
| Registered with DLD | 10 Jun 2009 |
| Construction started | 19 Mar 2009 |
| Declared completion | 6 Aug 2015 — registry date, not a handover promise |
| Units in the project | 61 |
| Project area | 5 622 sqm |
| Escrow agent | Mashreq Bank Psc |
| Project number | 1206 |
Source: DLD project registry (Mashrooi) · Data through 24 Nov 2026 · registry fields as recorded, not developer marketing · Methodology v1.0 ↗
Price per square foot, month by month
No month in this window reached the five registered sales a median needs, so there is nothing to plot.
Source: Registered DLD transactions · Data through 24 Nov 2026 · monthly medians, months with fewer than 5 registered sales are left blank · Methodology v1.0 ↗
Construction, inspection by inspection
The DLD registry holds 8 technical inspections for this project, from 1 May 2012 at 22.0% to 20 Apr 2015 at 64.2%. Over the inspections since 25 Dec 2013 it moved 1.80 percentage points a month. Inspections are irregular and the percentage is what was recorded at each one, not a live measure of the site.
each dot is one DLD technical inspection; the line between two of them is drawn, not measured; the dashed mark is the completion date declared in the registry
| Inspection | Recorded | Change |
|---|---|---|
| 20 Apr 2015 | 64.2% | +14.2 pp |
| 7 Dec 2014 | 50.1% | +4.6 pp |
| 18 Aug 2014 | 45.5% | +4.8 pp |
| 2 Apr 2014 | 40.7% | +5.0 pp |
| 25 Dec 2013 | 35.7% | +1.3 pp |
| 13 Aug 2013 | 34.4% | +9.4 pp |
| 10 Apr 2013 | 25.0% | +3.0 pp |
| 1 May 2012 | 22.0% | — |
Source: DLD project registry (Mashrooi) — technical inspections · Data through 24 Nov 2026 · percentage as recorded at each inspection; inspections are irregular, and an unchanged value means no new inspection, not that work stopped · Methodology v1.0 ↗
Every registration, on request
The full DLD record for Qpoint Liwan-Plot R073: every registered sale, mortgage and gift, and every Ejari rent contract. It loads only when you ask; filter, sort and download it as CSV.
Registered sales by year
registered sales per calendar year; the current year is incomplete
| Year | Sales | Median price | Median AED/sqft | Total registered value |
|---|---|---|---|---|
| 2017 | 2 | — | — | AED 1.08M |
| 2016 | 59 | AED 632k | 710 | AED 40.92M |
Source: Registered DLD transactions · Data through 24 Nov 2026 · calendar years; the current year is partial · Methodology v1.0 ↗
Rent and gross yield by year, 2016–2026
1-bed flat: median annual rent, AED, of new and renewed Ejari contracts by start year; band = middle half of contracts
| Year | 1-bed flat | 2-bed flat | Gross yield |
|---|---|---|---|
| 2026 YTD | 48k | — | — |
| 2025 | 44k | — | — |
| 2024 | 39k | 58k | — |
| 2023 | 34k | 52k | — |
| 2022 | 32k | — | — |
| 2021 | 28k | 44k | — |
| 2020 | 30k | 48k | — |
| 2019 | 37k | 56k | — |
| 2018 | 45k | 64k | — |
| 2017 | 49k | — | — |
| 2016 | 52k | — | 9.03% |
Source: Ejari rental contracts and registered DLD sales · Data through 24 Nov 2026 · median annual rent per year a contract starts, shown from 15 contracts; yield = median rent ÷ median ready-home price of the same year and home type, from 15 of each · Methodology v1.0 ↗
What these numbers do not show
- Prices from the developer. Nothing here is a price list, a payment plan or availability — these are transactions already registered with DLD.
- Whether construction is moving. The completion percentage is the figure recorded at the last technical inspection, and inspections are irregular: an unchanged number does not mean work stopped.
- A handover promise. The declared completion date is a registry field, not a commitment.
- A reliable price. Only 0 sales registered in the last 12 months here.
- Asking prices. Everything here is a registered transaction; what a home was listed at is a different number.
- Off-market and cash-equivalent deals that never reach the registry, and the price actually negotiated before registration.
- Service charges, chiller fees, agency commission, DLD transfer fees or mortgage costs — none of them are inside these prices.
Nearby projects
10 projects with a page on this site are registered within 1.2 km of Qpoint Liwan-Plot R073. Distance is measured between the coordinates in the DLD project registry.
| Project | Distance | Built |
|---|---|---|
| Qpoint Liwan-Plot R072 Finished · Al Mazaya Real Estate Fz-Llc |
50 m | 100% |
| Qpoint Liwan-Plot R081 Finished · Al Mazaya Real Estate Fz-Llc |
92 m | 100% |
| Qpoint Liwan-Plot R071 Finished · Al Mazaya Real Estate Fz-Llc |
100 m | 100% |
| Qpoint Liwan-Plot R082 Finished · Al Mazaya Real Estate Fz-Llc |
119 m | 100% |
| Qpoint Liwan-Plot R070 Finished · Al Mazaya Real Estate Fz-Llc |
150 m | 100% |
| Qpoint Liwan-Plot R069 Finished · Al Mazaya Real Estate Fz-Llc |
200 m | 100% |
| Qpoint Liwan-Plot R068 Finished · Al Mazaya Real Estate Fz-Llc |
250 m | 100% |
| Qline (Qpoint Phase Ii) R085 Finished · Al Mazaya Emirates Real Estate Development Owned By Mazaya Alghad One Person Company L.L.C |
316 m | 100% |
| Qpoint Liwan-Plot R096 Finished · Al Mazaya Holding Company |
359 m | 100% |
| Qpoint Liwan-Plot R095 Finished · Al Mazaya Real Estate Fz-Llc |
360 m | 100% |
The map loads only when you ask for it (OpenStreetMap, no tracking).
Source: DLD project registry coordinates · Data through 24 Nov 2026 · map © OpenStreetMap contributors · Methodology v1.0 ↗
Where this project sits
More projects in Liwan1
Questions about Qpoint Liwan-Plot R073
Who is the developer of Qpoint Liwan-Plot R073?
The Dubai Land Department project registry lists Al Mazaya Real Estate Fz-Llc as the developer of Qpoint Liwan-Plot R073.
Is Qpoint Liwan-Plot R073 completed?
The DLD registry status of Qpoint Liwan-Plot R073 is Finished, 100% complete at the last DLD inspection. The declared completion date in the registry is 6 Aug 2015 — a registry date, not a handover promise.
How many homes are in Qpoint Liwan-Plot R073?
The DLD registry records 61 units in Qpoint Liwan-Plot R073.
What is the price per square foot in Qpoint Liwan-Plot R073?
Too few sales were registered in Qpoint Liwan-Plot R073 in the last 12 months to publish a median; earlier registered sales are shown in the charts on this page.
Who holds the escrow account for Qpoint Liwan-Plot R073?
The escrow agent recorded by DLD for Qpoint Liwan-Plot R073 is Mashreq Bank Psc.
Where is Qpoint Liwan-Plot R073?
Qpoint Liwan-Plot R073 is in the Liwan1 community. 10 other projects with a page on this site are registered within 1.2 km; the closest is Qpoint Liwan-Plot R072, about 50 m away.
Where does this data come from?
From Dubai Land Department open data — the project registry, unit register and registered sales — rebuilt every night. Data through 24 Nov 2026.
Source: DLD project registry, unit register and registered sales · Data through 24 Nov 2026 · answers built from registry fields · Methodology v1.0 ↗