Safeer Residences 3
Updated 24 Nov 2026 · latest DLD registrations 24 Nov 2026 · DLD project registry and registered sales · trailing 12 months Nov 2025 – Oct 2026
Ask an AI about Safeer Residences 3: ChatGPT · Claude · Perplexity
Safeer Residences 3 is a project by Alseeb Real Estate Development L.L.C, recorded at 100% complete at its last Dubai Land Department inspection. Fewer than 5 sales registered here in the last 12 months, so no median is published. Registry facts come from DLD; prices are registered transactions, not asking prices.
Source: Registered DLD transactions · Data through 24 Nov 2026 · sample 0 records · outlier-trimmed median, complete months only · Methodology v1.0 ↗
What the DLD registry says about this project
| Field | Value |
|---|---|
| Developer | Alseeb Real Estate Development L.L.C |
| Status | Finished |
| Construction progress | 100% — at the last DLD inspection |
| Registered with DLD | 6 Mar 2016 |
| Construction started | 1 May 2015 |
| Declared completion | 1 Jul 2018 — registry date, not a handover promise |
| Units in the project | 64 |
| Project area | 8 470 sqm |
| Escrow agent | Dubai Islamic Bank (Public Joint Stock Company) |
| Project number | 1734 |
Source: DLD project registry (Mashrooi) · Data through 24 Nov 2026 · registry fields as recorded, not developer marketing · Methodology v1.0 ↗
Price per square foot, month by month
No month in this window reached the five registered sales a median needs, so there is nothing to plot.
Source: Registered DLD transactions · Data through 24 Nov 2026 · monthly medians, months with fewer than 5 registered sales are left blank · Methodology v1.0 ↗
Construction, inspection by inspection
The DLD registry holds 2 technical inspections for this project, from 13 Jun 2018 at 99.0% to 1 Jul 2018 at 100.0%. The last inspection recorded it complete. Inspections are irregular and the percentage is what was recorded at each one, not a live measure of the site.
each dot is one DLD technical inspection; the line between two of them is drawn, not measured; the dashed mark is the completion date declared in the registry
| Inspection | Recorded | Change |
|---|---|---|
| 1 Jul 2018 | 100.0% | +1.0 pp |
| 13 Jun 2018 | 99.0% | — |
Source: DLD project registry (Mashrooi) — technical inspections · Data through 24 Nov 2026 · percentage as recorded at each inspection; inspections are irregular, and an unchanged value means no new inspection, not that work stopped · Methodology v1.0 ↗
Every registration, on request
The full DLD record for Safeer Residences 3: every registered sale, mortgage and gift, and every Ejari rent contract. It loads only when you ask; filter, sort and download it as CSV.
Registered sales by year
registered sales per calendar year; the current year is incomplete
| Year | Sales | Median price | Median AED/sqft | Total registered value |
|---|---|---|---|---|
| 2018 | 2 | — | — | AED 174.00M |
Source: Registered DLD transactions · Data through 24 Nov 2026 · calendar years; the current year is partial · Methodology v1.0 ↗
Rent by year, 2018–2026
1-bed flat: median annual rent, AED, of new and renewed Ejari contracts by start year; band = middle half of contracts
| Year | 1-bed flat |
|---|---|
| 2026 YTD | 56k |
| 2025 | 58k |
| 2022 | 34k |
| 2021 | 32k |
| 2020 | 34k |
| 2019 | 40k |
| 2018 | 45k |
Source: Ejari rental contracts and registered DLD sales · Data through 24 Nov 2026 · median annual rent per year a contract starts, shown from 15 contracts; yield = median rent ÷ median ready-home price of the same year and home type, from 15 of each · Methodology v1.0 ↗
What these numbers do not show
- Prices from the developer. Nothing here is a price list, a payment plan or availability — these are transactions already registered with DLD.
- Whether construction is moving. The completion percentage is the figure recorded at the last technical inspection, and inspections are irregular: an unchanged number does not mean work stopped.
- A handover promise. The declared completion date is a registry field, not a commitment.
- A reliable price. Only 0 sales registered in the last 12 months here.
- Asking prices. Everything here is a registered transaction; what a home was listed at is a different number.
- Off-market and cash-equivalent deals that never reach the registry, and the price actually negotiated before registration.
- Service charges, chiller fees, agency commission, DLD transfer fees or mortgage costs — none of them are inside these prices.
Nearby projects
10 projects with a page on this site are registered within 1.2 km of Safeer Residences 3. Distance is measured between the coordinates in the DLD project registry.
| Project | Distance | Built |
|---|---|---|
| Ajmal Sarah Finished · Fabson Import Export Limited |
374 m | 100% |
| Time 1 Finished · Time Properties |
393 m | 100% |
| Phoenix Tower Finished · Phoenix Holdings (L.L.C) |
536 m | 100% |
| The Villa 3 Finished · Dubai Land Residences (L.L.C) |
641 m | 100% |
| Sondos Orchid Finished · Al Sondos Real Estate L.L.C |
662 m | 100% |
| Qpoint Liwan-Plot R073 Finished · Al Mazaya Real Estate Fz-Llc |
669 m | 100% |
| Qpoint Liwan-Plot R072 Finished · Al Mazaya Real Estate Fz-Llc |
673 m | 100% |
| Qpoint Liwan-Plot R071 Finished · Al Mazaya Real Estate Fz-Llc |
681 m | 100% |
| Qpoint Liwan-Plot R070 Finished · Al Mazaya Real Estate Fz-Llc |
693 m | 100% |
| Sondos Lilac Finished · Al Sondos Real Estate L.L.C |
695 m | 100% |
The map loads only when you ask for it (OpenStreetMap, no tracking).
Source: DLD project registry coordinates · Data through 24 Nov 2026 · map © OpenStreetMap contributors · Methodology v1.0 ↗
Where this project sits
More projects in Dubai Land Residence Complex
Questions about Safeer Residences 3
Who is the developer of Safeer Residences 3?
The Dubai Land Department project registry lists Alseeb Real Estate Development L.L.C as the developer of Safeer Residences 3.
Is Safeer Residences 3 completed?
The DLD registry status of Safeer Residences 3 is Finished, 100% complete at the last DLD inspection. The declared completion date in the registry is 1 Jul 2018 — a registry date, not a handover promise.
How many homes are in Safeer Residences 3?
The DLD registry records 64 units in Safeer Residences 3.
What is the price per square foot in Safeer Residences 3?
Too few sales were registered in Safeer Residences 3 in the last 12 months to publish a median; earlier registered sales are shown in the charts on this page.
Who holds the escrow account for Safeer Residences 3?
The escrow agent recorded by DLD for Safeer Residences 3 is Dubai Islamic Bank (Public Joint Stock Company).
Where is Safeer Residences 3?
Safeer Residences 3 is in the Dubai Land Residence Complex community. 10 other projects with a page on this site are registered within 1.2 km; the closest is Ajmal Sarah, about 374 m away.
Where does this data come from?
From Dubai Land Department open data — the project registry, unit register and registered sales — rebuilt every night. Data through 24 Nov 2026.
Source: DLD project registry, unit register and registered sales · Data through 24 Nov 2026 · answers built from registry fields · Methodology v1.0 ↗