Data Dubai

Verdes By Haven 2

Verdes By Haven 2Active27% built59 homesDLD data through 24 Nov 2026

Updated 24 Nov 2026 · latest DLD registrations 24 Nov 2026 · DLD project registry and registered sales · trailing 12 months Nov 2025 – Oct 2026

Ask an AI about Verdes By Haven 2: ChatGPT · Claude · Perplexity

Verdes By Haven 2 is a project by Aurora Spv 1 L.L.C, recorded at 27% complete at its last Dubai Land Department inspection. Fewer than 5 sales registered here in the last 12 months, so no median is published. Registry facts come from DLD; prices are registered transactions, not asking prices.

Median sale price
—
not enough sales
DLD verified
Median price per sqft
—
built residential only
DLD verified
Registered sales
3 -94.3% y/y
all property types · trailing 12 complete months
DLD verified
Off-plan share
100.0%
of registered sales in the window
DLD verified

Source: Registered DLD transactions · Data through 24 Nov 2026 · sample 3 records · outlier-trimmed median, complete months only · Methodology v1.0 ↗

What the DLD registry says about this project

FieldValue
DeveloperAurora Spv 1 L.L.C
StatusActive
Construction progress27% — at the last DLD inspection
Registered with DLD12 Sep 2024
Construction started1 Jan 2026
Declared completion30 Jun 2028 — registry date, not a handover promise
Units in the project59
Project area7 689 sqm
Escrow agentFirst Abu Dhabi Bank P.J.S.C.
Project number3189

Source: DLD project registry (Mashrooi) · Data through 24 Nov 2026 · registry fields as recorded, not developer marketing · Methodology v1.0 ↗

Price per square foot, month by month

Fewer than six months reached the five registered sales a median needs — too few to draw a line that would mean anything.

Source: Registered DLD transactions · Data through 24 Nov 2026 · monthly medians, months with fewer than 5 registered sales are left blank; the line stops at Jan 2025: in the 21 months since, no month reached the five registered sales a median needs (9 in total) · Methodology v1.0 ↗

Construction, inspection by inspection

The DLD registry holds 6 technical inspections for this project, from 27 Aug 2024 at 0.0% to 21 Oct 2026 at 27.5%. Over the inspections since 22 Aug 2025 it moved 1.85 percentage points a month. Inspections are irregular and the percentage is what was recorded at each one, not a live measure of the site.

0%25%50%75%100%declared 2028-06-302024-08-272026-10-21

each dot is one DLD technical inspection; the line between two of them is drawn, not measured; the dashed mark is the completion date declared in the registry

InspectionRecordedChange
21 Oct 202627.5% +12.2 pp
23 Jul 202615.2% +8.6 pp
13 Apr 20266.7% +4.1 pp
11 Dec 20252.5% +0.8 pp
22 Aug 20251.7% +1.7 pp
27 Aug 20240.0% —

Source: DLD project registry (Mashrooi) — technical inspections · Data through 24 Nov 2026 · percentage as recorded at each inspection; inspections are irregular, and an unchanged value means no new inspection, not that work stopped · Methodology v1.0 ↗

Homes and registered off-plan sales

Off-plan sale registrations in Verdes By Haven 2 (57) already equal 97% of the 59 homes in the DLD unit register, as of 23 Nov 2026. Few homes, if any, are left without a registered sale — the count includes resales, so a small number may still be unsold.

HomesIn unit
register
Registered
sales
1 bedroom2324
2 bedrooms2020
3 bedrooms1613

Source: DLD unit register and registered off-plan sales · Data through 23 Nov 2026 · 'Sell - Pre registration' registrations include resales before completion, so the gap is a floor, not the developer's availability · Methodology v1.0 ↗

Homes without a registered sale in all Dubai off-plan projects →

By number of bedrooms

HomesSalesMedian priceMedian AED/sqftMedian sizeMedian rentGross yield
1-bedroom apartments insufficient data 1— — — — —
2-bedroom apartments insufficient data 1— — — — —
3-bedroom apartments insufficient data 1— — — — —

Source: Registered DLD sales and Ejari rental contracts · Data through 24 Nov 2026 · yield shown only where at least 15 rents and 15 ready-home sales support it · Methodology v1.0 ↗

Latest registered sales

DatePropertyRegistrationSizePriceAED/sqft
8 Oct 20262 B/R Flat — Building 1 - MOSSOff-plan 1 388 sqftAED 1 710 169 1 232
10 Aug 20261 B/R Flat — Building 1 - MOSSOff-plan 817 sqftAED 1 182 979 1 448
25 Feb 20263 B/R Flat — Building 1 - MOSSOff-plan 2 289 sqftAED 2 894 400 1 265

Source: Registered DLD transactions · Data through 24 Nov 2026 · individual registrations, shown exactly as recorded, without trimming · Methodology v1.0 ↗

Every registration, on request

The full DLD record for Verdes By Haven 2: every registered sale, mortgage and gift. It loads only when you ask; filter, sort and download it as CSV.

Registered sales by year

01020302024202520260102030202420252026

registered sales per calendar year; the current year is incomplete

By month

012FebMarAprMayJunJulAugSepOctNovDecJan012MarMayJulSepNovJan

registered sales per month, Feb 2025 – Jan 2026

YearSalesMedian priceMedian AED/sqftTotal registered value
20263— —AED 5.79M
202528AED 1.75M 1 318AED 53.02M
202426AED 1.44M 1 277AED 38.24M

Source: Registered DLD transactions · Data through 24 Nov 2026 · calendar years; the current year is partial · Methodology v1.0 ↗

Price and sales, month by month

MonthSalesMedian priceMedian AED/sqftIQR AED/sqft
Jan 202522 AED 1.75M1 335 1 215 – 1 379
Dec 20244 —— —
Nov 202421 AED 1.22M1 313 1 212 – 1 442

Source: Registered DLD transactions · Data through 24 Nov 2026 · complete months only; the current month is excluded because DLD keeps registering it · Methodology v1.0 ↗

What these numbers do not show

  • Prices from the developer. Nothing here is a price list, a payment plan or availability — these are transactions already registered with DLD.
  • Whether construction is moving. The completion percentage is the figure recorded at the last technical inspection, and inspections are irregular: an unchanged number does not mean work stopped.
  • A handover promise. The declared completion date is a registry field, not a commitment.
  • A reliable price. Only 3 sales registered in the last 12 months here.
  • Asking prices. Everything here is a registered transaction; what a home was listed at is a different number.
  • Off-market and cash-equivalent deals that never reach the registry, and the price actually negotiated before registration.
  • Service charges, chiller fees, agency commission, DLD transfer fees or mortgage costs — none of them are inside these prices.

Where this project sits

More projects by Aurora Spv 1 L.L.C

Questions about Verdes By Haven 2

Who is the developer of Verdes By Haven 2?

The Dubai Land Department project registry lists Aurora Spv 1 L.L.C as the developer of Verdes By Haven 2.

Is Verdes By Haven 2 completed?

The DLD registry status of Verdes By Haven 2 is Active, 27% complete at the last DLD inspection. The declared completion date in the registry is 30 Jun 2028 — a registry date, not a handover promise.

How many homes are in Verdes By Haven 2?

The DLD registry records 59 units in Verdes By Haven 2. The split by number of bedrooms is in the unit register table on this page.

What is the price per square foot in Verdes By Haven 2?

Too few sales were registered in Verdes By Haven 2 in the last 12 months to publish a median; earlier registered sales are shown in the charts on this page.

Who holds the escrow account for Verdes By Haven 2?

The escrow agent recorded by DLD for Verdes By Haven 2 is First Abu Dhabi Bank P.J.S.C..

Where does this data come from?

From Dubai Land Department open data — the project registry, unit register and registered sales — rebuilt every night. Data through 24 Nov 2026.

Source: DLD project registry, unit register and registered sales · Data through 24 Nov 2026 · answers built from registry fields · Methodology v1.0 ↗

Cite or reuse this data

Machine-readable mirrors of this page: Markdown · JSON · llms.txt. How to cite: “Verdes By Haven 2 — Data Dubai, Continental Club Property, data through 24 Nov 2026, https://datadubai.ae/projects/verdes-by-haven-2/”. Reuse is permitted with attribution.