Al Manarah Tower
Updated 24 Nov 2026 · latest DLD registrations 24 Nov 2026 · DLD project registry and registered sales · trailing 12 months Nov 2025 – Oct 2026
Ask an AI about Al Manarah Tower: ChatGPT · Claude · Perplexity
Al Manarah Tower is a project by Tiger Properties, recorded at 100% complete at its last Dubai Land Department inspection. 20 sales registered in the trailing 12 months at a median AED 690k (1 044 AED per square foot). Registry facts come from DLD; prices are registered transactions, not asking prices.
Source: Registered DLD transactions · Data through 24 Nov 2026 · sample 20 records · outlier-trimmed median, complete months only · Methodology v1.0 ↗
What the DLD registry says about this project
| Field | Value |
|---|---|
| Developer | Tiger Properties |
| Status | Finished |
| Construction progress | 100% — at the last DLD inspection |
| Registered with DLD | 4 Jan 2016 |
| Construction started | 15 May 2014 |
| Declared completion | 6 Nov 2017 — registry date, not a handover promise |
| Units in the project | 259 |
| Project area | 16 891 sqm |
| Escrow agent | Emirates Nbd Bank (P.J.S.C) |
| Project number | 1706 |
Source: DLD project registry (Mashrooi) · Data through 24 Nov 2026 · registry fields as recorded, not developer marketing · Methodology v1.0 ↗
Price per square foot, month by month
Fewer than six months reached the five registered sales a median needs — too few to draw a line that would mean anything.
Source: Registered DLD transactions · Data through 24 Nov 2026 · monthly medians, months with fewer than 5 registered sales are left blank; the line stops at Sep 2024: in the 25 months since, no month reached the five registered sales a median needs (55 in total) · Methodology v1.0 ↗
Construction, inspection by inspection
The DLD registry holds 4 technical inspections for this project, from 18 May 2016 at 43.1% to 6 Dec 2017 at 100.0%. The last inspection recorded it complete. Inspections are irregular and the percentage is what was recorded at each one, not a live measure of the site.
each dot is one DLD technical inspection; the line between two of them is drawn, not measured; the dashed mark is the completion date declared in the registry
| Inspection | Recorded | Change |
|---|---|---|
| 6 Dec 2017 | 100.0% | +14.9 pp |
| 19 Apr 2017 | 85.1% | +19.2 pp |
| 18 Oct 2016 | 65.9% | +22.8 pp |
| 18 May 2016 | 43.1% | — |
Source: DLD project registry (Mashrooi) — technical inspections · Data through 24 Nov 2026 · percentage as recorded at each inspection; inspections are irregular, and an unchanged value means no new inspection, not that work stopped · Methodology v1.0 ↗
By number of bedrooms
| Homes | Sales | Median price | Median AED/sqft | Median size | Median rent | Gross yield |
|---|---|---|---|---|---|---|
| Studios insufficient data | 3 | — | — | — | — | — |
| 1-bedroom apartments low sample (15) | 15 | AED 690k | 1 044 | 661 sqft | — | — |
| 2-bedroom apartments insufficient data | 2 | — | — | — | — | — |
Source: Registered DLD sales and Ejari rental contracts · Data through 24 Nov 2026 · yield shown only where at least 15 rents and 15 ready-home sales support it · Methodology v1.0 ↗
Latest registered sales
| Date | Property | Registration | Size | Price | AED/sqft |
|---|---|---|---|---|---|
| 2 Nov 2026 | Studio Flat — AL MANARA TOWER | Ready | 425 sqft | AED 490 000 | 1 152 |
| 15 Oct 2026 | 1 B/R Flat — AL MANARA TOWER | Ready | 806 sqft | AED 660 000 | 819 |
| 5 Oct 2026 | 1 B/R Flat — AL MANARA TOWER | Ready | 779 sqft | AED 695 000 | 892 |
| 14 Aug 2026 | 1 B/R Flat — AL MANARA TOWER | Ready | 661 sqft | AED 710 000 | 1 075 |
| 17 Jun 2026 | 1 B/R Flat — AL MANARA TOWER | Ready | 779 sqft | AED 707 224 | 908 |
| 9 Jun 2026 | 1 B/R Flat — AL MANARA TOWER | Ready | 661 sqft | AED 665 000 | 1 007 |
| 21 May 2026 | 1 B/R Flat — AL MANARA TOWER | Ready | 661 sqft | AED 690 000 | 1 045 |
| 11 Mar 2026 | 1 B/R Flat — AL MANARA TOWER | Ready | 661 sqft | AED 730 000 | 1 105 |
| 10 Mar 2026 | 1 B/R Flat — AL MANARA TOWER | Ready | 807 sqft | AED 850 000 | 1 054 |
| 9 Mar 2026 | Studio Flat — AL MANARA TOWER | Ready | 425 sqft | AED 525 000 | 1 234 |
| 9 Mar 2026 | Studio Flat — AL MANARA TOWER | Ready | 448 sqft | AED 525 000 | 1 171 |
| 28 Jan 2026 | 2 B/R Flat — AL MANARA TOWER | Ready | 1 329 sqft | AED 1 220 000 | 918 |
| 20 Jan 2026 | 1 B/R Flat — AL MANARA TOWER | Ready | 661 sqft | AED 900 000 | 1 362 |
| 15 Jan 2026 | 1 B/R Flat — AL MANARA TOWER | Ready | 807 sqft | AED 675 000 | 837 |
| 9 Jan 2026 | 1 B/R Flat — AL MANARA TOWER | Ready | 661 sqft | AED 680 000 | 1 029 |
| 15 Dec 2025 | 1 B/R Flat — AL MANARA TOWER | Ready | 661 sqft | AED 690 000 | 1 045 |
| 9 Dec 2025 | 1 B/R Flat — AL MANARA TOWER | Ready | 806 sqft | AED 872 000 | 1 082 |
| 25 Nov 2025 | 1 B/R Flat — AL MANARA TOWER | Ready | 661 sqft | AED 690 000 | 1 044 |
| 24 Nov 2025 | 1 B/R Flat — AL MANARA TOWER | Ready | 807 sqft | AED 650 000 | 806 |
| 18 Nov 2025 | Studio Flat — AL MANARA TOWER | Ready | 448 sqft | AED 480 000 | 1 071 |
| 11 Nov 2025 | 2 B/R Flat — AL MANARA TOWER | Ready | 1 339 sqft | AED 1 270 000 | 949 |
Source: Registered DLD transactions · Data through 24 Nov 2026 · individual registrations, shown exactly as recorded, without trimming · Methodology v1.0 ↗
Every registration, on request
The full DLD record for Al Manarah Tower: every registered sale, mortgage and gift, and every Ejari rent contract. It loads only when you ask; filter, sort and download it as CSV.
Registered sales by year
registered sales per calendar year; the current year is incomplete
By month
registered sales per month, Oct 2024 – Sep 2025
| Year | Sales | Median price | Median AED/sqft | Total registered value |
|---|---|---|---|---|
| 2026 | 14 | AED 692k | 1 037 | AED 10.23M |
| 2025 | 32 | AED 660k | 1 018 | AED 20.75M |
| 2024 | 44 | AED 612k | 929 | AED 26.72M |
| 2023 | 29 | AED 350k | 758 | AED 12.53M |
| 2022 | 19 | AED 480k | 621 | AED 9.59M |
| 2021 | 3 | — | — | AED 1.80M |
| 2020 | 5 | AED 425k | 843 | AED 2.22M |
| 2019 | 13 | AED 467k | 988 | AED 7.01M |
| 2018 | 44 | AED 852k | 989 | AED 37.96M |
| 2017 | 114 | AED 693k | 1 000 | AED 73.94M |
| 2016 | 77 | AED 448k | 990 | AED 44.63M |
| 2014 | 1 | — | — | AED 21.69M |
Source: Registered DLD transactions · Data through 24 Nov 2026 · calendar years; the current year is partial · Methodology v1.0 ↗
Rent and gross yield by year, 2018–2026
1-bed flat: median annual rent, AED, of new and renewed Ejari contracts by start year; band = middle half of contracts
| Year | Studio | 1-bed flat | 2-bed flat | Gross yield |
|---|---|---|---|---|
| 2026 YTD | 40k | 55k | — | — |
| 2025 | 41k | 58k | — | 8.15% |
| 2024 | 38k | 51k | — | 8.59% |
| 2023 | 31k | 46k | — | 9.09% |
| 2022 | 25k | 38k | 68k | — |
| 2021 | 23k | 36k | — | — |
| 2020 | 27k | 40k | 65k | — |
| 2019 | 32k | 47k | 73k | — |
| 2018 | 35k | 50k | — | — |
Source: Ejari rental contracts and registered DLD sales · Data through 24 Nov 2026 · median annual rent per year a contract starts, shown from 15 contracts; yield = median rent ÷ median ready-home price of the same year and home type, from 15 of each · Methodology v1.0 ↗
Price and sales, month by month
| Month | Sales | Median price | Median AED/sqft | IQR AED/sqft |
|---|---|---|---|---|
| Sep 2024 | 5 | AED 545k | 936 | 829 – 979 |
| Aug 2024 | 1 | — | — | — |
| Jul 2024 | 2 | — | — | — |
| Jun 2024 | 6 | AED 575k | 974 | 864 – 1 202 |
| May 2024 | 3 | — | — | — |
| Apr 2024 | 8 | AED 638k | 929 | 853 – 996 |
| Mar 2024 | 4 | — | — | — |
| Feb 2024 | 2 | — | — | — |
| Jan 2024 | 4 | — | — | — |
| Dec 2023 | 3 | — | — | — |
| Nov 2023 | 3 | — | — | — |
| Oct 2023 | 4 | — | — | — |
| Sep 2023 | 2 | — | — | — |
Source: Registered DLD transactions · Data through 24 Nov 2026 · complete months only; the current month is excluded because DLD keeps registering it · Methodology v1.0 ↗
What these numbers do not show
- Prices from the developer. Nothing here is a price list, a payment plan or availability — these are transactions already registered with DLD.
- Whether construction is moving. The completion percentage is the figure recorded at the last technical inspection, and inspections are irregular: an unchanged number does not mean work stopped.
- A handover promise. The declared completion date is a registry field, not a commitment.
- Asking prices. Everything here is a registered transaction; what a home was listed at is a different number.
- Off-market and cash-equivalent deals that never reach the registry, and the price actually negotiated before registration.
- Service charges, chiller fees, agency commission, DLD transfer fees or mortgage costs — none of them are inside these prices.
Nearby projects
10 projects with a page on this site are registered within 1.2 km of Al Manarah Tower. Distance is measured between the coordinates in the DLD project registry.
| Project | Distance | Built |
|---|---|---|
| Paradise One Active · Danat Aldunia Real Estate Development L.L.C |
130 m | 70% |
| Point Residencia Cancelled · Pacific Ventures Limited |
245 m | 92% |
| Oakwood Residency Finished · Deyaar Development (P.J.S.C) |
354 m | 100% |
| Centrium Tower Finished · Eta Star Property Developers L.L.C |
374 m | 100% |
| Cavendish Square Active · Leos Development L.L.C |
462 m | 5% |
| Green Park Finished · Island Oasis Properties |
490 m | 100% |
| Imperial Residence Finished · Tameer Holding Investment (Llc) |
537 m | 100% |
| Terhab Hotel & Towers At Jumeirah Village Triangle Finished · Manazil Global Property Development L.L.C |
631 m | 100% |
| Hyati Residence Finished · Aurora Real Estate Development L.L.C |
721 m | 100% |
| Palace Estates Finished · Imtiaz Real Estate & Investmentdevelopment L.L.C |
842 m | 100% |
The map loads only when you ask for it (OpenStreetMap, no tracking).
Source: DLD project registry coordinates · Data through 24 Nov 2026 · map © OpenStreetMap contributors · Methodology v1.0 ↗
Where this project sits
More projects in Jumeirah Village Triangle
Questions about Al Manarah Tower
Who is the developer of Al Manarah Tower?
The Dubai Land Department project registry lists Tiger Properties as the developer of Al Manarah Tower.
Is Al Manarah Tower completed?
The DLD registry status of Al Manarah Tower is Finished, 100% complete at the last DLD inspection. The declared completion date in the registry is 6 Nov 2017 — a registry date, not a handover promise.
How many homes are in Al Manarah Tower?
The DLD registry records 259 units in Al Manarah Tower.
What is the price per square foot in Al Manarah Tower?
Over the last 12 complete months the median registered sale in Al Manarah Tower was AED 690k, or AED 1 044 per sqft, from 20 registered sales. These are DLD registrations, not asking prices.
Who holds the escrow account for Al Manarah Tower?
The escrow agent recorded by DLD for Al Manarah Tower is Emirates Nbd Bank (P.J.S.C).
Where is Al Manarah Tower?
Al Manarah Tower is in the Jumeirah Village Triangle community. 10 other projects with a page on this site are registered within 1.2 km; the closest is Paradise One, about 130 m away.
Where does this data come from?
From Dubai Land Department open data — the project registry, unit register and registered sales — rebuilt every night. Data through 24 Nov 2026.
Source: DLD project registry, unit register and registered sales · Data through 24 Nov 2026 · answers built from registry fields · Methodology v1.0 ↗