DubaiData

Elaris Sky

Data through 7 Sep 2026 · DLD project registry and registered sales · trailing 12 months Sep 2025 – Aug 2026 · rebuilt daily

Elaris Sky is a project by Object One Real Estate Development L.L.C, recorded at 0% complete at its last Dubai Land Department inspection. 211 sales registered in the trailing 12 months at a median AED 1.13M (1 626 AED per square foot). Registry facts come from DLD; prices are registered transactions, not asking prices.

Median sale price
AED 1.13M
IQR AED 780k – AED 1.20M
DLD verified
Median price per sqft
AED 1 626/sqft
IQR 1 564 – 1 902 AED/sqft
DLD verified
Registered sales
211
all property types · trailing 12 complete months
DLD verified
Off-plan share
100.0%
of registered sales in the window
DLD verified

Source: Registered DLD transactions · Data through 7 Sep 2026 · sample 211 records · outlier-trimmed median, complete months only · Methodology v1.0 ↗

What the DLD registry says about this project

FieldValueProvenance
DeveloperObject One Real Estate Development L.L.C DLD verified
StatusActive DLD verified
Construction progress0% — at the last DLD inspection DLD verified
Registered with DLD7 Oct 2025 DLD verified
Construction started15 Oct 2025 DLD verified
Declared completion30 Sep 2028 — registry date, not a handover promise DLD verified
Units in the project409 DLD verified
Project area26 992 sqm DLD verified
Escrow agentAbu Dhabi Islamic Bank DLD verified
Project number4019 DLD verified

Source: DLD project registry (Mashrooi) · Data through 7 Sep 2026 · registry fields as recorded, not developer marketing · Methodology v1.0 ↗

Price per square foot, month by month

1 6001 800Oct 2025Nov 2025Dec 2025Jan 2026Feb 2026Mar 2026Apr 2026May 2026Jun 2026Jul 2026Aug 2026

median   interquartile range (middle 50% of transactions)

Source: Registered DLD transactions · Data through 7 Sep 2026 · monthly medians, months with fewer than 5 registered sales are left blank · Methodology v1.0 ↗

Construction, inspection by inspection

The DLD registry holds 3 technical inspections for this project, from 21 Aug 2025 at 0.0% to 3 Aug 2026 at 0.2%. Since 21 Aug 2025 the recorded percentage has moved 0.02 percentage points a month. Inspections are irregular and the percentage is what was recorded at each one, not a live measure of the site.

0%25%50%75%100%declared 2028-09-302025-08-212026-08-03

each dot is one DLD technical inspection; the line between two of them is drawn, not measured; the dashed mark is the completion date declared in the registry

InspectionRecordedChange
3 Aug 20260.2% +0.2 pp
20 Apr 20260.0% +0.0 pp
21 Aug 20250.0%

Source: DLD project registry (Mashrooi) — technical inspections · Data through 7 Sep 2026 · percentage as recorded at each inspection; inspections are irregular, and an unchanged value means no new inspection, not that work stopped · Methodology v1.0 ↗

The same figures as a table

MonthSalesMedian priceMedian AED/sqftIQR AED/sqft
Aug 202612 AED 1.12M1 574 1 512 – 1 593
Jul 20266 AED 1.11M1 562 1 540 – 1 574
Jun 202612 AED 1.19M1 617 1 558 – 1 645
May 20262
Apr 202611 AED 1.16M1 662 1 614 – 1 836
Mar 202615 AED 1.17M1 622 1 546 – 1 806
Feb 202615 AED 1.06M1 659 1 581 – 1 842
Jan 202640 AED 1.14M1 590 1 457 – 1 646
Dec 202564 AED 1.12M1 698 1 597 – 1 949
Nov 202529 AED 1.14M1 752 1 605 – 1 934
Oct 20255 AED 776k1 887 1 754 – 1 902

Source: Registered DLD transactions · Data through 7 Sep 2026 · complete months only; the current month is excluded because DLD keeps registering it · Methodology v1.0 ↗

By number of bedrooms

HomesSalesMedian priceMedian AED/sqftMedian sizeMedian rentGross yield
Studios 75AED 771k 1 939 393 sqft
1-bedroom apartments 106AED 1.16M 1 608 720 sqft
2-bedroom apartments 24AED 1.68M 1 414 1 171 sqft

Source: Registered DLD sales and Ejari rental contracts · Data through 7 Sep 2026 · yield shown only where at least 15 rents and 15 ready-home sales support it · Methodology v1.0 ↗

Registered sales by year

050100201320252026

median   interquartile range (middle 50% of transactions)

YearSalesMedian priceMedian AED/sqftTotal registered value
2026113AED 1.14M 1 608AED 125.15M
202598AED 1.12M 1 731AED 113.73M
20131 AED 21.53M

Source: Registered DLD transactions · Data through 7 Sep 2026 · calendar years; the current year is partial · Methodology v1.0 ↗

Latest registered sales

DatePropertyRegistrationSizePriceAED/sqft
27 Aug 20261 B/R Flat — ELARIS SkyOff-plan 721 sqftAED 1 140 050 1 582
27 Aug 20261 B/R Flat — ELARIS SkyOff-plan 735 sqftAED 1 151 589 1 566
27 Aug 20261 B/R Flat — ELARIS SkyOff-plan 790 sqftAED 1 209 365 1 531
20 Aug 2026Studio Flat — ELARIS SkyOff-plan 393 sqftAED 731 075 1 860
20 Aug 2026Studio Flat — ELARIS SkyOff-plan 386 sqftAED 735 895 1 908
17 Aug 20261 B/R Flat — ELARIS SkyOff-plan 714 sqftAED 1 111 662 1 557
17 Aug 20261 B/R Flat — ELARIS SkyOff-plan 714 sqftAED 1 000 000 1 401
17 Aug 20261 B/R Flat — ELARIS SkyOff-plan 718 sqftAED 1 135 300 1 581
14 Aug 20261 B/R Flat — ELARIS SkyOff-plan 719 sqftAED 1 162 465 1 616
13 Aug 20261 B/R Flat — ELARIS SkyOff-plan 721 sqftAED 1 000 000 1 388
10 Aug 20261 B/R Flat — ELARIS SkyOff-plan 722 sqftAED 1 143 720 1 585
5 Aug 20261 B/R Flat — ELARIS SkyOff-plan 719 sqftAED 1 045 672 1 454

Source: Registered DLD transactions · Data through 7 Sep 2026 · individual registrations, shown exactly as recorded, without trimming · Methodology v1.0 ↗

What these numbers do not show

  • Prices from the developer. Nothing here is a price list, a payment plan or availability — these are transactions already registered with DLD.
  • Whether construction is moving. The completion percentage is the figure recorded at the last technical inspection, and inspections are irregular: an unchanged number does not mean work stopped.
  • A handover promise. The declared completion date is a registry field, not a commitment.
  • Asking prices. Everything here is a registered transaction; what a home was listed at is a different number.
  • Off-market and cash-equivalent deals that never reach the registry, and the price actually negotiated before registration.
  • Service charges, chiller fees, agency commission, DLD transfer fees or mortgage costs — none of them are inside these prices.

Where this project sits

For AI agents and researchers

Machine-readable mirrors of this page: Markdown · JSON · llms.txt. How to cite: “Elaris Sky — Dubai Data, Continental Club Property, data through 7 Sep 2026, https://datadubai.ae/projects/elaris-sky/”. Reuse is permitted with attribution.